Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215C966 + (ML20215C966)
- ML20215C968 + (ML20215C968)
- ML20215C970 + (ML20215C970)
- ML20215C971 + (ML20215C971)
- ML20215C975 + (ML20215C975)
- ML20215C979 + (ML20215C979)
- ML20215C981 + (ML20215C981)
- ML20215C985 + (ML20215C985)
- B12545, Informs NRC of Actions Taken to Date Re Piping Insp Programs to Detect Erosion/Corrosion Wear.Work Will Begin w/1987 Outage to Devise Effective Pipe Wall Thickness Measurement Program to Eliminate Potential Piping Sys Concerns + (ML20215C986)
- ML20215C987 + (ML20215C987)
- ML20215C988 + (ML20215C988)
- 05000482/LER-1986-044, :on 860902,partial Loss of Offsite Power Occurred.Caused by Personnel Error During Routine Substation Switchyard Maint Activity.Increase in Testing Frequency of Valve Ef HV-38 Implemented + (ML20215C990)
- ML20215C991 + (ML20215C991)
- ML20215C992 + (ML20215C992)
- ML20215C995 + (ML20215C995)
- ML20215C996 + (ML20215C996)
- ML20215C997 + (ML20215C997)
- ML20215C998 + (ML20215C998)
- ML20215C999 + (ML20215C999)
- ML20215D000 + (ML20215D000)
- ML20215D001 + (ML20215D001)
- 05000352/LER-1986-052, :on 861110,HPCI Inboard Steam Supply Isolation Valve Closed Due to Nuclear Steam Supply Shutoff Sys Div 4 Isolation Signal.Caused by Technician Error.Isolation Reset + (ML20215D002)
- ML20215D004 + (ML20215D004)
- ML20215D005 + (ML20215D005)
- ML20215D006 + (ML20215D006)
- ML20215D008 + (ML20215D008)
- U-600679, Forwards Clinton Single Loop Operation Analysis. Proposed Tech Spec Changes,Necessary to Implement Operation,Also Encl + (ML20215D011)
- ML20215D012 + (ML20215D012)
- ML20215D014 + (ML20215D014)
- ML20215D015 + (ML20215D015)
- ML20215D016 + (ML20215D016)
- ML20215D017 + (ML20215D017)
- ML20215D020 + (ML20215D020)
- AECM-86-0287, Requests NRC Review & Concurrence W/Proposed Purge Criteria Discussed in Encl Rept Re Containment Air Quality & Use of Containment Purge During Cycle 1 Operation.Fee Paid + (ML20215D021)
- ML20215D022 + (ML20215D022)
- ML20215D023 + (ML20215D023)
- ML20215D024 + (ML20215D024)
- ML20215D026 + (ML20215D026)
- ML20215D027 + (ML20215D027)
- ML20215D028 + (ML20215D028)
- ML20215D031 + (ML20215D031)
- RBG-26095, Special Rept:On 870515,valid Failure Experienced on Div III Diesel Generator While Performing Surveillance Testing. Caused by Failure of Fuse F55 in 120 Volt Circuit.Failed Relay & Fuse Replaced.Testing Successfully Completed + (ML20215D032)
- ML20215D033 + (ML20215D033)
- ML20215D036 + (ML20215D036)
- ML20215D037 + (ML20215D037)
- ML20215D038 + (ML20215D038)
- ML20215D039 + (ML20215D039)
- ML20215D041 + (ML20215D041)
- ML20215D043 + (ML20215D043)
- ML20215D044 + (ML20215D044)
- IA-86-678, Forwards Comments Re Seabrook Station Risk Mgt & Emergency Planning Study. Methods of Bypassing Containment Not Fully Explored & Potential Risk Impact of Sabotage Ignored + (ML20215D045)