Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215C946 + (ML20215C946)
- ML20215C947 + (ML20215C947)
- ML20215C950 + (ML20215C950)
- ML20215C952 + (ML20215C952)
- ML20215C955 + (ML20215C955)
- ML20215C956 + (ML20215C956)
- ML20215C958 + (ML20215C958)
- ML20215C961 + (ML20215C961)
- ML20215C963 + (ML20215C963)
- ML20215C964 + (ML20215C964)
- IR 05000324/1986022 + (ML20215C965)
- ML20215C966 + (ML20215C966)
- ML20215C968 + (ML20215C968)
- ML20215C970 + (ML20215C970)
- ML20215C971 + (ML20215C971)
- ML20215C975 + (ML20215C975)
- ML20215C979 + (ML20215C979)
- ML20215C981 + (ML20215C981)
- ML20215C985 + (ML20215C985)
- B12545, Informs NRC of Actions Taken to Date Re Piping Insp Programs to Detect Erosion/Corrosion Wear.Work Will Begin w/1987 Outage to Devise Effective Pipe Wall Thickness Measurement Program to Eliminate Potential Piping Sys Concerns + (ML20215C986)
- ML20215C987 + (ML20215C987)
- ML20215C988 + (ML20215C988)
- 05000482/LER-1986-044, :on 860902,partial Loss of Offsite Power Occurred.Caused by Personnel Error During Routine Substation Switchyard Maint Activity.Increase in Testing Frequency of Valve Ef HV-38 Implemented + (ML20215C990)
- ML20215C991 + (ML20215C991)
- ML20215C992 + (ML20215C992)
- ML20215C995 + (ML20215C995)
- ML20215C996 + (ML20215C996)
- ML20215C997 + (ML20215C997)
- ML20215C998 + (ML20215C998)
- ML20215C999 + (ML20215C999)
- ML20215D000 + (ML20215D000)
- ML20215D001 + (ML20215D001)
- 05000352/LER-1986-052, :on 861110,HPCI Inboard Steam Supply Isolation Valve Closed Due to Nuclear Steam Supply Shutoff Sys Div 4 Isolation Signal.Caused by Technician Error.Isolation Reset + (ML20215D002)
- ML20215D004 + (ML20215D004)
- ML20215D005 + (ML20215D005)
- ML20215D006 + (ML20215D006)
- ML20215D008 + (ML20215D008)
- U-600679, Forwards Clinton Single Loop Operation Analysis. Proposed Tech Spec Changes,Necessary to Implement Operation,Also Encl + (ML20215D011)
- ML20215D012 + (ML20215D012)
- ML20215D014 + (ML20215D014)
- ML20215D015 + (ML20215D015)
- ML20215D016 + (ML20215D016)
- ML20215D017 + (ML20215D017)
- ML20215D020 + (ML20215D020)
- AECM-86-0287, Requests NRC Review & Concurrence W/Proposed Purge Criteria Discussed in Encl Rept Re Containment Air Quality & Use of Containment Purge During Cycle 1 Operation.Fee Paid + (ML20215D021)
- ML20215D022 + (ML20215D022)
- ML20215D023 + (ML20215D023)
- ML20215D024 + (ML20215D024)
- ML20215D026 + (ML20215D026)
- ML20215D027 + (ML20215D027)
- ML20215D028 + (ML20215D028)