Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B943 + (ML20215B943)
- ML20215B949 + (ML20215B949)
- ML20215B952 + (ML20215B952)
- ML20215B955 + (ML20215B955)
- ML20215B956 + (ML20215B956)
- ML20215B957 + (ML20215B957)
- ML20215B961 + (ML20215B961)
- ML20215B962 + (ML20215B962)
- ML20215B963 + (ML20215B963)
- ML20215B964 + (ML20215B964)
- ML20215B965 + (ML20215B965)
- ML20215B968 + (ML20215B968)
- ML20215B971 + (ML20215B971)
- ML20215B974 + (ML20215B974)
- ML20215B976 + (ML20215B976)
- ML20215B979 + (ML20215B979)
- ML20215B980 + (ML20215B980)
- IR 05000344/1986034 + (ML20215B981)
- ML20215B983 + (ML20215B983)
- ML20215B987 + (ML20215B987)
- ML20215B991 + (ML20215B991)
- ML20215B994 + (ML20215B994)
- ML20215B998 + (ML20215B998)
- ML20215C001 + (ML20215C001)
- ML20215C003 + (ML20215C003)
- ML20215C005 + (ML20215C005)
- ML20215C010 + (ML20215C010)
- SNRC-1342, Responds to NRC Re Violations Noted in Insp Rept 50-322/87-05.Corrective Actions:Procedure Revised to Improve Technical Review of Facility Mods by Inclusion of Technical Review Check Sheet + (ML20215C011)
- ML20215C012 + (ML20215C012)
- ML20215C013 + (ML20215C013)
- ML20215C014 + (ML20215C014)
- TXX-5050, Interim Deficiency Rept CP-86-57 Re Reinforcing Steel in Reactor Cavity Wall.Initially Reported on 860829.Addl Reinforcing Steel Added to Drawing & Deleted W/O Design Calculation Records.Next Rept Anticipated by 861101 + (ML20215C015)
- ML20215C017 + (ML20215C017)
- ML20215C019 + (ML20215C019)
- IR 05000424/1986115 + (ML20215C020)
- ML20215C021 + (ML20215C021)
- ML20215C022 + (ML20215C022)
- TXX-6497, Interim Deficiency Rept CP-86-73 Re Installation of ASME Snubber Attachment Brackets.Initially Reported on 870320. Results of Evaluation of 165 Supports Listed.Project Procedures Under Evaluation.Next Rept by 870918 + (ML20215C023)
- ML20215C025 + (ML20215C025)
- ST-HL-AE-2242, Final Deficiency Rept Re Electrical Splices Using Raychem Heat Shrink Insulation Matl.Craft,Field Engineers & Field QC Personnel Reinstructed on Use of Raychem Matl & Site Std Procedure 26, Termination of Electrical Cables, Revised + (ML20215C026)
- ML20215C027 + (ML20215C027)
- ML20215C031 + (ML20215C031)
- ML20215C032 + (ML20215C032)
- ML20215C033 + (ML20215C033)
- IR 05000280/1986039 + (ML20215C035)
- ML20215C037 + (ML20215C037)
- ML20215C038 + (ML20215C038)
- ML20215C039 + (ML20215C039)
- ML20215C040 + (ML20215C040)
- IR 05000413/1986039 + (ML20215C041)
- ST-HL-AE-1767, Comparison of Treat & Notrump Small Break LOCA Transient Results + (ML20215C043)