Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000062/1986003 + (ML20214N850)
- IR 05000458/1985009 + (ML20214N852)
- W3P86-2940, Forwards Application Fee for Reload Analysis Rept,Per 861105 Request + (ML20214N854)
- ML20214N855 + (ML20214N855)
- ML20214N856 + (ML20214N856)
- ML20214N857 + (ML20214N857)
- RBG-23306, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-09.Corrective Actions:Computer Model for Reactor Bldg Support Case R3 Corrected & Reanalyzed & Structural Engineers Retrained + (ML20214N861)
- ML20214N863 + (ML20214N863)
- ML20214N864 + (ML20214N864)
- ML20214N870 + (ML20214N870)
- ML20214N873 + (ML20214N873)
- ML20214N879 + (ML20214N879)
- ML20214N881 + (ML20214N881)
- ML20214N882 + (ML20214N882)
- ML20214N886 + (ML20214N886)
- ML20214N887 + (ML20214N887)
- 05000334/LER-1987-009, :on 870428,hi & hi-hi Alarm Received on Auxiliary Bldg Train B Ventilation Radiation Monitor RM-VS-102B.Caused by Inadequate Sampling Procedures & Inexperienced Chemist.Procedures Revised + (ML20214N889)
- ML20214N890 + (ML20214N890)
- ML20214N891 + (ML20214N891)
- ML20214N892 + (ML20214N892)
- ML20214N897 + (ML20214N897)
- ML20214N904 + (ML20214N904)
- ML20214N909 + (ML20214N909)
- ML20214N911 + (ML20214N911)
- 05000325/LER-1986-028, :on 861029,reactor Bldg Fire Hose Station Rendered Inoperable Due to Inadvertent Isolation of Fire Suppression Source.Caused by Procedural Weakness Involving Installation of Mechanical Jumper + (ML20214N915)
- ML20214N919 + (ML20214N919)
- ML20214N920 + (ML20214N920)
- RBG-24359, Monthly Operating Rept for Aug 1986 + (ML20214N921)
- ML20214N922 + (ML20214N922)
- ML20214N924 + (ML20214N924)
- ML20214N925 + (ML20214N925)
- ML20214N926 + (ML20214N926)
- ML20214N930 + (ML20214N930)
- ML20214N933 + (ML20214N933)
- ML20214N934 + (ML20214N934)
- 05000254/LER-1986-024-03, :on 860811,RHR Svc Water Supports Exceeded Allowable Stress During Safe Shutdown Earthquake Loading. Caused by Inadequate Design Control.Rhr Svc Water Supports Modified + (ML20214N935)
- ML20214N937 + (ML20214N937)
- ML20214N938 + (ML20214N938)
- ML20214N941 + (ML20214N941)
- ML20214N943 + (ML20214N943)
- ML20214N947 + (ML20214N947)
- ML20214N949 + (ML20214N949)
- ML20214N953 + (ML20214N953)
- ML20214N954 + (ML20214N954)
- RBG-24865, Forwards Proposed Changes to Physical Security Plan.Changes Described in Rev 9 Not Implemented,Pending Approval by Commission.Changes Withheld (Ref 10CFR73.21) + (ML20214N956)
- IR 05000461/1987018 + (ML20214N957)
- ML20214N958 + (ML20214N958)
- ML20214N960 + (ML20214N960)
- ML20214N965 + (ML20214N965)
- ML20214N968 + (ML20214N968)
- ML20214N969 + (ML20214N969)