DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-86 008
_------ 1986 DATE Se 9
-- Etembe_r COMPLETED BY R.
H
- - _a r _t i n -
M - -------
_---- Zs_t_ ems _--_EnA._
Sr.
S TITLE TELEPHONE 635-6094 X2672 MONTH AUGUST 1986 DAY AVERACE DAILY POWER LEVEL
- DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
- 1. -_---__----_849 17.
__0 584 18.
0 2.
3 914 19.
0 936 20.
0 4
921 21.
0 5.. --------------------------
6.
913 22.
0 7.
_9 23.
0 92 936 24.
10 8.
898 25.
658 9.
10, 924 26.
915 936 27, 917
- 11. --------------. ----------
926 28.
935
- 12. --------------------------
929 29.
936
- 13. ---------------------
14.
- - - - - - - - _ - _9 2 6 30, 917
y_----------
15.
788 31.
267 16 0
- Based on CSU dispatch.
8609170166 860831 PDR ADOCK 05000458
~1.9" Ddk.
R PDH h
.A
l l
1 DOCKET NO.
50/458 i
RIVER BEND STATION UNIT 1 REPORT NO.
R-86-008 DATE
_ SEPTEMBER _92,1986 COMPLETED BY R.
H.
Martin
'IITLE
_Sr._Systeas_Eng2_
TELEPRONE
_635-6094_X2672___
PAGE 1
0F -----
2 9EE3&IINg_SIfIES 1.
REPORTING PERIOD: _ AUGUST _1986 GROSS HOURS IN REPORTING PERIOD:
__744___
2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt):
__2894__
MAX. DEPEND CAPACITY (MWe-Net):
___N/A____
DESIGN ELECTRICAL RATING (Mwe-Net):
__936,__
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
__MfA___
4 REASONS FOR PESTRICTION '(IF ANY):N/A l
l THIS YR TO CUMU-MONTH DATE LATIVE
{
5.
NUHBER OF HOURS REACTOR WAS CRITICAL... ----------. -----------
'53.6 3750.5 4920.9 5
6.
REACTOR RESERVE SHUTDOWN HOURS.........
_____0____
_____0_____
_____0_____
7.
HOURS GENERATOR ON LINE...............
___517235_
__3144215__
___3299225_
. 8 UNIT RESERVE SHUTDOWN HOURS...........
0 0
0 l
l 9
GROSS THERMAL ENERGY GENERATED- (MWH)..
1 422 097_
6 184 882 6 339 802__
2 2
2 2
2 2
!10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 484 549 91 2 043 760.7 2 063 120.7 2
2 2
2 2
2
'11.
NET ELECTRICAL ENERGY GENERATED (MWH).
448 853.2 1 870 097 2 1 887 597 2 2
2 1
2 2
2 2
l
DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
_R-86;008_________
DATE SEPTEMBER 9 1986 x-----
COMPLETED BY
_R
_H _ Martin _____
TITLE
_Srg_ Systems _Eng _
TELEPHONE 635-6094 X2672 PAGE _ - _2--
0F
___2__
2PERhllNg_SIflgS
.i THIS YR TO CUMU-MONTH DATE LATIVE
__7434__
__70 4__
__70 4__
12
' REACTOR SERVICE FACTOR 13.
REACTOR AVAILABILITY FACTOR
__74:4__
__7034__
__70 4__
__69.5,_
__60.3,_
__6033,_
14 UNIT SERVICE FACTOR
__69 5,_
__6033,_
__60 3,_
15.
UNIT AVAILABILITY FACTOR
- 16 UNIT CAPACITY FACTOR (Using MDC)
N/A N/A N/A 17.
UNIT-CAPACITY FACTOR (Using Design MWe).
__6435__
__54.7__
__5437__
___239,_
__3139___.__3139__
18.
UNIT FORCED OUTAGE RATE 19 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
4 weeks Local Leak Rate testing October 4,
1986 20 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 09/03f86 21 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A 10-31-85 0037 INITIAL ELECTRICITY
__N/A___
12 03-85 0344
- COMMERCIAL OPERATION
__N/A___
_6;16-86
- ' Completion of S/U testing and proposed date for declaration of in-service before the Public Utility Commission of Texas.
1
i UNIT SHUTDOWNS AND POWER REDUCTIONS 1
- l I
- l y.
- l l
l l
1 1
I i
1 1
i TIME l -TIME I
l I
'l l
l START 1 RECOVER I l
l il I OF l
FROM l DURATIONI TYPE REASON l METHOD l CORRECTIVE ACTIONS / COMMENTS I
l 1 NO DATE OCCURANCE OCCURANCEI fHOURS)
NOTE fil NOTE (21 NOTE (311 4
l l
i I
1-l 860815 i
1823l211.35l l 1, 2302 S
B 2
Planned as part.of Turbine Vibration
-l l
l I860824 I I
I I
testing.
l
- I 1
l l
1 l
l I
'l2 l860831 0842l 2400l 15.30!
'l I
l l2.
F A
3-l Resulted from faulted transformer.
See l
l 1
1 1
1 1
LER 886-054.
I I
l l
I l
i I
I I
I I
I I
I i
1 l
i I
I I
I l
-l i
I l
l 11 l
1 i
SUMMARY
l l
l l
l 1
I l
i l
i I NOTE (1) TYPE OF OCCURANCE:
ENTER CODE i
l DOCKET NO. 50/458 l
1 F:
FORCED RIVER BEND STATICN UNIT 1 1
l St SCHEDULED REPORT NO.
R-86-008 I
i l
I I
I NOTE (2) REASON FOR OCCURANCE:
ENTER CODE 1
1 l
A:
EQUIPMENT FAILURE (EXPLA1N 1N CORRECTIVE ACTlONS/ COMMENTS) l REPORT MONTH Augus t 1986 l
l 8: MAINTENANCE OR TEST
~
l l
l C: REFUELING l
l D: REGULATORY RESTRICTION I
l l
E.
OPERATOR TRAINING AND LICENSE EXAMINATION I
DATE September 9, 1986 I
j l
F ADMINISTRATIVE l
li
!l C: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) 11 R.
H.. Martin l
.1 H: OTHER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) ll C
LET D Y PRI l
l N1)TE(3)METHODOFSH0YTINGDOWNREACTORORREDUCINGPOWER: ENTER CODE
. N.
l l
1: MANUAL Il SIGNATURE I
.1 2: MANUAL SCRAM ll I
ll 3
AUTOMATIC SCRAM ll Sr. Systems Engineer l
1 4
OTHER (EXPLAIN IN CORRECTIVE ACTION / COMMENTS) ll TITLE I
'l Il il l
11 TELEPHONE (504) 635-6094 X2672 l ORM-SOM-024 cEV. O
g GULF STATATS UTILITIES COMPANY RIVER 8END STATION POST OFFICE 80X 220 ST. FRANCISVILLE, LOUISIANA 70775 ARE A CODE 504 635 6094 348 8651 September 11, 1986 RBG-24359 File Nos. G9.5, G9.25.1.5 Mr. Ronald M. Scroggins Director, Office of Resource Management U.
S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Scroggins:
River Bend Station - Unit 1 Docket No. 50-458 Enclosed is Gulf States Utilities Company's Monthly Operating Report for August 1986 for River Bend Station (RBS)
Unit 1.
This report is submitted in accordance with RBS Technical Specification 6.9.1.6.
Sincerely,
.fh 1A,
7 J.
E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/
/DAS/je Enclosure cc: Regional Administrator U. S.~ Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011' U. S. NRC Document Control Desk d
1 i