Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214M503 + (ML20214M503)
- W3P87-1376, Forwards Draft Waterford 3 Nuclear Plant Island Structure Basemat Summary Rept, Per 870331 Agreement.Final Rept Will Be Submitted by 870701 + (ML20214M505)
- ML20214M508 + (ML20214M508)
- ML20214M511 + (ML20214M511)
- ML20214M513 + (ML20214M513)
- ML20214M517 + (ML20214M517)
- ML20214M519 + (ML20214M519)
- ML20214M522 + (ML20214M522)
- ML20214M525 + (ML20214M525)
- ML20214M528 + (ML20214M528)
- PNO-V-86-060, on 860903,reactor Feedwater Pump B Tripped Due to Failure of Overspeed Controls.Caused by Partial Control Valve Closure Re Tripping of Hydraulic Power Units. Investigation Underway + (ML20214M530)
- ML20214M531 + (ML20214M531)
- RBG-24023, Monthly Operating Rept for June 1986 + (ML20214M534)
- ML20214M535 + (ML20214M535)
- ML20214M538 + (ML20214M538)
- ML20214M541 + (ML20214M541)
- ML20214M542 + (ML20214M542)
- ML20214M545 + (ML20214M545)
- ML20214M546 + (ML20214M546)
- ML20214M548 + (ML20214M548)
- ML20214M550 + (ML20214M550)
- RBG-25995, Responds to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. Leak Testing Performed Every 18 Months at Facility,Including High Pressure Tests at 1,025 Psig,Per Tech Specs + (ML20214M551)
- ML20214M553 + (ML20214M553)
- ML20214M554 + (ML20214M554)
- ML20214M556 + (ML20214M556)
- ML20214M557 + (ML20214M557)
- ML20214M559 + (ML20214M559)
- ML20214M561 + (ML20214M561)
- ML20214M563 + (ML20214M563)
- 05000206/LER-1986-008-03, :on 860805,all Turbine Governor Valves Spuriously Closed,Terminating Main Steam Flow to Turbine. Possibly Caused by Particulate in Hydraulic Controls.Oil Filters Replaced + (ML20214M578)
- ML20214M581 + (ML20214M581)
- ML20214M584 + (ML20214M584)
- ML20214M585 + (ML20214M585)
- ML20214M589 + (ML20214M589)
- PNO-I-86-070, on 860905,telephone Bomb Threat Received for Unit 2.Fuel Bldgs of Both Units Evacuated & Searched.No Bomb Found.Info Assessment Team & Commonwealth of PA Notified + (ML20214M593)
- ML20214M595 + (ML20214M595)
- ML20214M597 + (ML20214M597)
- IR 05000424/1986059 + (ML20214M599)
- 05000312/LER-1987-017, :on 870209 & 0320,discrepancies in Local Leak Rate Test (LLRT) Discovered.Caused by Personnel Error.Tech Specs,Updated Sar,Integrated Leak Rate Tests & LLRT Will Be Revised to Reflect Addl Test Requirements + (ML20214M601)
- ML20214M602 + (ML20214M602)
- ML20214M603 + (ML20214M603)
- IR 05000298/1986015 + (ML20214M605)
- ML20214M608 + (ML20214M608)
- IR 05000498/1986024 + (ML20214M614)
- ML20214M619 + (ML20214M619)
- PNO-I-87-045, on 870523,reactor Taken Critical for First Time.After Completion of Initial Fuel Load on 861115,power Ascension Delayed Due to Excessive Leakage Problems W/Ball Type Msivs.Valves Replaced W/Wye Pattern Glove Valves + (ML20214M621)
- ML20214M625 + (ML20214M625)
- ML20214M630 + (ML20214M630)
- ML20214M634 + (ML20214M634)
- ML20214M637 + (ML20214M637)
- ML20214M640 + (ML20214M640)