Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000424/1997099 + (ML20211K877)
- ML20211K878 + (ML20211K878)
- IR 05000483/1997016 + (ML20211K879)
- LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase + (ML20211K880)
- ML20211K881 + (ML20211K881)
- TXX-4871, Interim Deficiency Rept CP-86-11 Re Cracks in Bingham-Willamette Impeller Casting of Rotating Element of Component Cooling Water Pumps.Initially Reported on 860224. Impellers Will Be Inspected.Next Rept by 860923 + (ML20211K882)
- ML20211K883 + (ML20211K883)
- ML20211K885 + (ML20211K885)
- ML20211K886 + (ML20211K886)
- ML20211K888 + (ML20211K888)
- IR 05000400/1986024 + (ML20211K889)
- IR 05000369/1999005 + (ML20211K891)
- ML20211K893 + (ML20211K893)
- IR 05000250/1986004 + (ML20211K894)
- ML20211K896 + (ML20211K896)
- 05000213/LER-1986-021, :on 860524,one of Four ex-core Channels Failed to Meet Acceptance Criteria for Dropped Rod Load Runback Setpoint.Caused by Setpoint Drift.Setpoint Recalibr & Weekly Surveillances Established + (ML20211K897)
- ML20211K899 + (ML20211K899)
- ML20211K900 + (ML20211K900)
- ML20211K901 + (ML20211K901)
- IR 05000324/1999005 + (ML20211K908)
- ML20211K910 + (ML20211K910)
- ML20211K911 + (ML20211K911)
- ML20211K913 + (ML20211K913)
- ML20211K914 + (ML20211K914)
- ML20211K916 + (ML20211K916)
- ML20211K919 + (ML20211K919)
- ML20211K924 + (ML20211K924)
- 05000440/LER-1986-079, :on 861109,Train B of Control Room HVAC Sys Started Unexpectedly in Emergency Recirculation Mode During Performance of Special Test Instruction.Caused by Procedural Deficiency + (ML20211K926)
- ML20211K934 + (ML20211K934)
- TXX-4863, Interim Deficiency Rept CP-85-54 Re Discrepancies in Supplier Provided HVAC Support Documents.Initially Reported on 851220.Engineering Evaluation Scheduled for Completion by Sept 1986.Next Rept Will Be Submitted by 860926 + (ML20211K935)
- ML20211K939 + (ML20211K939)
- ML20211K941 + (ML20211K941)
- ML20211K943 + (ML20211K943)
- ML20211K946 + (ML20211K946)
- ML20211K947 + (ML20211K947)
- ML20211K953 + (ML20211K953)
- IR 05000333/1986008 + (ML20211K954)
- ML20211K956 + (ML20211K956)
- ML20211K959 + (ML20211K959)
- ML20211K962 + (ML20211K962)
- 05000440/LER-1986-080, :on 861108 & 26,during Local Leak Rate Test Surveillances,Total Combined Allowable Primary Containment &/Or Secondary Containment Bypass Leakage Rates Exceeded Tech Spec 3.6.1.2.Caused by Failed Seats & Resilient Seal + (ML20211K964)
- ML20211K967 + (ML20211K967)
- ML20211K970 + (ML20211K970)
- ML20211K972 + (ML20211K972)
- ML20211K974 + (ML20211K974)
- ML20211K975 + (ML20211K975)
- 05000440/LER-1986-081, :on 861111,unexpected Main Steam Line Isolation Occurred During Performance of Surveillance Instruction (SVI)-C71-T0047.Caused by Deficiency in Surveillance Instruction.Instruction Revised + (ML20211K978)
- ML20211K981 + (ML20211K981)
- ML20211K983 + (ML20211K983)
- ML20211K984 + (ML20211K984)
- DCL-86-181, Forwards Changes to Rev 14 to Physical Security Plan in Response to Comments in NRC .Changes Withheld (Ref 10CFR73.21) + (ML20211K985)