Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211D272 + (ML20211D272)
- ML20211D275 + (ML20211D275)
- ML20211D277 + (ML20211D277)
- ML20211D282 + (ML20211D282)
- ST-HL-AE-1877, Forwards marked-up FSAR Pages 3.9-84 (Table 3.9-1.1) & 3.9-88b (Table 3.9-1.2) Re Lists of Active Components & Valves Reflecting Revs from Update & Consistency Check,To Be Incorporated Into Future Amend + (ML20211D283)
- 05000354/LER-1997-021, :on 970821,standby Liquid Control Sys Tank Concentration Was Below TS Limits.Caused by Leaking Valves in Demineralized Water Makeup Lines.Standby Liquid Control Tank Concentration Was Restored + (ML20211D284)
- ML20211D287 + (ML20211D287)
- ML20211D292 + (ML20211D292)
- ML20211D295 + (ML20211D295)
- ST-HL-AE-1912, Requests That SER (NUREG-0781),Section 13.2.1.1.3 Be Revised Re Number of Senior Reactor Operators & Reactor Operators. Util Expects 60 Employees to Complete License Training Prior to Issuance of OL in June 1987 + (ML20211D297)
- ML20211D300 + (ML20211D300)
- ML20211D302 + (ML20211D302)
- 05000346/LER-1986-040, :on 860908,during Annual Fire Protection Audit, Fire Detection Instruments Inside Containment & Containment Annulus Declared Inoperable & Fire Watches Confirmed.Caused by Misinterpretation of Tech Spec 4.3.3.8.2 + (ML20211D304)
- ML20211D305 + (ML20211D305)
- ML20211D307 + (ML20211D307)
- ML20211D310 + (ML20211D310)
- ML20211D315 + (ML20211D315)
- ML20211D321 + (ML20211D321)
- ML20211D324 + (ML20211D324)
- 05000280/LER-1986-023-01, :on 860820,containment Sump Trip Valve Found Leaking from Inside Containment Isolation Valve.Caused by Loose Valve Position Indication Arm.Valve Manually Isolated & Screw Set Tightened in Indication Arm + (ML20211D326)
- ML20211D330 + (ML20211D330)
- ML20211D332 + (ML20211D332)
- ML20211D334 + (ML20211D334)
- NSD-NRC-97-5336, Advises NRC of Implementation of AP600 Design Change Re Pressurizer Heater Control Logic.No SSAR Design Description Is Affected by Change.Current PRA Results Remain Conservative W/Respect to Reanalysis Considering Change + (ML20211D335)
- ML20211D339 + (ML20211D339)
- ML20211D342 + (ML20211D342)
- ML20211D345 + (ML20211D345)
- ML20211D347 + (ML20211D347)
- ML20211D348 + (ML20211D348)
- ML20211D351 + (ML20211D351)
- ML20211D353 + (ML20211D353)
- ML20211D354 + (ML20211D354)
- ML20211D356 + (ML20211D356)
- ML20211D358 + (ML20211D358)
- ML20211D360 + (ML20211D360)
- ML20211D363 + (ML20211D363)
- ML20211D365 + (ML20211D365)
- ML20211D366 + (ML20211D366)
- ML20211D367 + (ML20211D367)
- ML20211D368 + (ML20211D368)
- ML20211D369 + (ML20211D369)
- ML20211D372 + (ML20211D372)
- 05000251/LER-1986-021-01, :on 860916,unit Shut Down Due to Malfunction in Rod Position Indication (RPI) Sys.Caused by Failed Line Voltage Regulator in RPI Power Sys.Regulator Replaced & RPI Inverter Output Checked + (ML20211D373)
- ML20211D374 + (ML20211D374)
- ML20211D376 + (ML20211D376)
- ML20211D377 + (ML20211D377)
- ML20211D379 + (ML20211D379)
- ML20211D383 + (ML20211D383)
- ML20211D385 + (ML20211D385)
- 05000280/LER-1986-025, :on 860918 & 19,control Rods P-6 & P-10 Dropped Into Core,Respectively & Reactor Manually Tripped.Caused by Failed Stationary Gripper Coil & Loose Female Connector Pin. Parts Replaced & Control Rods Tested + (ML20211D387)
- ML20211D388 + (ML20211D388)