Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211D114 + (ML20211D114)
- ML20211D115 + (ML20211D115)
- ML20211D116 + (ML20211D116)
- ML20211D117 + (ML20211D117)
- ML20211D119 + (ML20211D119)
- ML20211D120 + (ML20211D120)
- ML20211D123 + (ML20211D123)
- ML20211D124 + (ML20211D124)
- 05000312/LER-1987-003, :on 870120,welding Work Performed in Fire Zones 13 & 75 Required Continuous Fire Watch Post,But Only Hourly Fire Watch Performed by Fire Protection Staff.Caused by Personnel Error.Personnel Involved Reprimanded + (ML20211D126)
- ML20211D128 + (ML20211D128)
- ML20211D129 + (ML20211D129)
- ML20211D130 + (ML20211D130)
- 1CAN108607, Forwards Comparison of RCS Leak Detection Sys to Reg Guide 1.45 Guidelines,Per Rev to GDC 4.Util Intends to Remove Remaining Lateral Restraints Per GDC 4 + (ML20211D131)
- ML20211D132 + (ML20211D132)
- ML20211D134 + (ML20211D134)
- 05000321/LER-1987-003, :on 870109,personnel in Procedure Upgrade Program Performed Validation Review of Plant Procedures & Did Not Fully Satisfy All Surveillance Requirements.Caused by Personnel Error.Procedures Modified + (ML20211D135)
- 05000281/LER-1986-012-03, :on 860821,during Monthly Performance Test, Relay LM-REL-200A1 Found Failed & on 860826 Relay R-LM-REL-200A2 Found Failed.Caused by Intermittent Operation of Comparator.Relays Replaced & Tested + (ML20211D138)
- IR 05000346/1999009 + (ML20211D139)
- ML20211D140 + (ML20211D140)
- ML20211D142 + (ML20211D142)
- ML20211D144 + (ML20211D144)
- ML20211D146 + (ML20211D146)
- ML20211D148 + (ML20211D148)
- ML20211D149 + (ML20211D149)
- ML20211D152 + (ML20211D152)
- ML20211D155 + (ML20211D155)
- ML20211D158 + (ML20211D158)
- ML20211D159 + (ML20211D159)
- ML20211D160 + (ML20211D160)
- ML20211D161 + (ML20211D161)
- ML20211D164 + (ML20211D164)
- ML20211D165 + (ML20211D165)
- ML20211D169 + (ML20211D169)
- ML20211D170 + (ML20211D170)
- ML20211D172 + (ML20211D172)
- ML20211D173 + (ML20211D173)
- ML20211D174 + (ML20211D174)
- 1CAN108606, Forwards Proprietary B&W Rept 32-1147602-02, 177 Once- Through Steam Generator Tube/Sleeve Loads, in Response to Telcon Request for Addl Info in Support of 40% Plugging Criteria.Rept Withheld (Ref 10CFR2.790) + (ML20211D175)
- ML20211D178 + (ML20211D178)
- 3F0997-02, Forwards Summary of Plant App R Restart Design Items Covered Under Restart Item D-11,in Response to 970707 Rai.Schedule Shows That Most App R Related Construction Will Be Completed by Last Half of Nov 1997 + (ML20211D179)
- 3F0997-26, Notifies NRC of Completion of, Failure Modes & Effects Analysis for Crystal River Unit 3 Class 1E 250/125 Vdc Electrical Distribution Sys + (ML20211D181)
- 05000255/LER-1987-001-01, :on 870114,containment Penetrations Associated W/Containment Hydrogen Monitoring Sys Did Not Employ Redundant Isolation Logic.Caused by Sys Design Description Not Being Implemented as Prescribed + (ML20211D183)
- ML20211D186 + (ML20211D186)
- ML20211D187 + (ML20211D187)
- ML20211D189 + (ML20211D189)
- ML20211D191 + (ML20211D191)
- ML20211D194 + (ML20211D194)
- ML20211D198 + (ML20211D198)
- ML20211D202 + (ML20211D202)
- ML20211D203 + (ML20211D203)
- ML20211D204 + (ML20211D204)