Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210E740 + (ML20210E740)
- ML20210E742 + (ML20210E742)
- ML20210E743 + (ML20210E743)
- ML20210E744 + (ML20210E744)
- ML20210E745 + (ML20210E745)
- ML20210E747 + (ML20210E747)
- SVP-99-151, Responds to NRC 990701 Telcon RAI Re Licensee Amend Request Re Use of Containment Overpressure to Support NPSH Available for ECCS at Quad Cities Nuclear Power Station,Units 1 & 2 + (ML20210E748)
- ML20210E749 + (ML20210E749)
- ML20210E752 + (ML20210E752)
- ML20210E755 + (ML20210E755)
- ML20210E756 + (ML20210E756)
- DCL-84-031, Forwards Util Response to Allegations 25,58 & 96 Described in Sser 21 Re Expansion Anchors.Util Responses Re HP Foley Procedure for Installation of Anchor Bolts Will Be Submitted Next Wk + (ML20210E757)
- ST-HL-AE-1900, First Interim Deficiency Rept Re Liquidtight Flexible Conduit.Initially Reported on 870106.Tests Conducted to Demonstrate That Anaconda Sealtight Flexible Conduit Meets Requirements of Reg Guide 1.75.Next Rept Expected by 870313 + (ML20210E758)
- ML20210E763 + (ML20210E763)
- DCL-84-023, Forwards Summary of Former Bostrom-Bergen/Meddco Metals Employees Allegations (Sser 21,Allegation 99) Per 840116 Request.Util Currently Confirming Each Allegation W/Respective Alleger + (ML20210E764)
- ML20210E765 + (ML20210E765)
- ML20210E767 + (ML20210E767)
- DCL-84-030, Forwards Bostrom-Bergen/Meddco Metals Allegations Investigations Interim Rept, Per 840116 Commitment.Rept Provides Status of Investigation of Sser 21,Allegation 99 + (ML20210E768)
- ML20210E773 + (ML20210E773)
- ML20210E774 + (ML20210E774)
- ML20210E775 + (ML20210E775)
- ML20210E777 + (ML20210E777)
- TXX-6271, Interim Deficiency Rept CP-86-81 Re Calculations for balance-of-plant safety-related Instrument Setpoints. Initially Reported on 861107.Evaluation of Issue Being Conducted by S&W.Next Rept Expected by 870729 + (ML20210E778)
- 05000374/LER-1986-015-06, :on 860823,RWCU Sys Isolated on High Differential Flow.Caused by Flow Losses Through Stuck Open Relief Valve on Shell Side of Regenerative Hx.Relief Valve Repaired & Sys Restarted + (ML20210E781)
- ML20210E782 + (ML20210E782)
- ML20210E784 + (ML20210E784)
- ML20210E787 + (ML20210E787)
- ML20210E790 + (ML20210E790)
- ML20210E791 + (ML20210E791)
- ML20210E792 + (ML20210E792)
- ML20210E793 + (ML20210E793)
- ML20210E794 + (ML20210E794)
- AECM-87-0028, Forwards Replacement Check Per 10CFR170.21.R Diggs Advised Util That Original Check Lost During Processing + (ML20210E796)
- ML20210E798 + (ML20210E798)
- ML20210E799 + (ML20210E799)
- ML20210E801 + (ML20210E801)
- ML20210E802 + (ML20210E802)
- ML20210E805 + (ML20210E805)
- ML20210E806 + (ML20210E806)
- ML20210E808 + (ML20210E808)
- ML20210E810 + (ML20210E810)
- ML20210E811 + (ML20210E811)
- ML20210E812 + (ML20210E812)
- ML20210E817 + (ML20210E817)
- PNO-V-87-009, on 870202,plant Worker Repeatedly Caused Portal Radiation Monitor to Alarm on Exit from Work Activities in Containment Bldg.Radioactive Matl Found on Inside Sleeve of Shirt.Survey Procedures Improved to Control Exposure + (ML20210E819)
- ML20210E821 + (ML20210E821)
- ML20210E822 + (ML20210E822)
- ML20210E823 + (ML20210E823)
- ML20210E824 + (ML20210E824)
- ML20210E825 + (ML20210E825)
- ML20210E827 + (ML20210E827)