Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209H422 + (ML20209H422)
- ML20209H423 + (ML20209H423)
- ML20209H424 + (ML20209H424)
- ML20209H426 + (ML20209H426)
- ML20209H428 + (ML20209H428)
- ML20209H429 + (ML20209H429)
- BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With + (ML20209H431)
- IR 05000352/1985040 + (ML20209H433)
- ML20209H435 + (ML20209H435)
- ML20209H437 + (ML20209H437)
- ML20209H438 + (ML20209H438)
- ML20209H439 + (ML20209H439)
- ML20209H440 + (ML20209H440)
- ML20209H442 + (ML20209H442)
- ML20209H443 + (ML20209H443)
- 05000440/LER-1986-046, :on 860813 & 14,independent Sample Analysis & Release Rate Calculation/Discharge Line Valving Verifications Not Performed Prior to Commencing Liquid Radwaste Batch Discharge Releases.Caused by Personnel Error + (ML20209H444)
- ML20209H446 + (ML20209H446)
- ML20209H447 + (ML20209H447)
- ML20209H450 + (ML20209H450)
- ML20209H452 + (ML20209H452)
- 05000327/LER-1986-034, :on 860814 & 15,Surveillance Instructions SI-238.1 & SI-302.2 Discovered Not Conducted within Time Limits.Caused by Personnel Errors.Instructions Conducted & Personnel Counseled + (ML20209H453)
- PNO-I-85-084, on 851101,plant Scrammed from 100% Power Due to Loss of Instrument Air & Failure of Feed Regulator Valves to Lockup.Licensee Will Install Correct Cable to One Dc Emergency Isolation Valve + (ML20209H454)
- ML20209H455 + (ML20209H455)
- ML20209H456 + (ML20209H456)
- IR 05000295/1986028 + (ML20209H457)
- ML20209H460 + (ML20209H460)
- BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with + (ML20209H462)
- ML20209H464 + (ML20209H464)
- 3F1185-08, Requests That ESFAS Components Be Deleted from Requirement for ESFAS Actuation.Requests Response by 851231 to Permit Proper Refuel VI Project Scheduling + (ML20209H465)
- ML20209H466 + (ML20209H466)
- SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With + (ML20209H467)
- ML20209H469 + (ML20209H469)
- ML20209H470 + (ML20209H470)
- L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 + (ML20209H472)
- ML20209H472 + (ML20209H472)
- ML20209H473 + (ML20209H473)
- ML20209H474 + (ML20209H474)
- ML20209H477 + (ML20209H477)
- ML20209H479 + (ML20209H479)
- ML20209H480 + (ML20209H480)
- ML20209H481 + (ML20209H481)
- ML20209H483 + (ML20209H483)
- ML20209H485 + (ML20209H485)
- ML20209H489 + (ML20209H489)
- ML20209H490 + (ML20209H490)
- ML20209H491 + (ML20209H491)
- ML20209H493 + (ML20209H493)
- ML20209H494 + (ML20209H494)
- IR 05000334/1985020 + (ML20209H496)
- ML20209H498 + (ML20209H498)
- ML20209H499 + (ML20209H499)