Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206T274 + (ML20206T274)
- IR 05000498/1986004 + (ML20206T275)
- ML20206T277 + (ML20206T277)
- IR 05000361/1986008 + (ML20206T278)
- ML20206T283 + (ML20206T283)
- NOC-AE-000532, Requests from ASME Section XI Code Exam Scheduling Requirements of Exam Category B-A Item B1.30 (Reactor Pressure Vessel shell-to-flange Weld) for Second ISI Interval.Relief Request RR-ENG-2-13 Encl + (ML20206T286)
- ML20206T287 + (ML20206T287)
- ML20206T288 + (ML20206T288)
- ML20206T290 + (ML20206T290)
- NOC-AE-000531, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-2300 Applicable to Qualification & Certification of VT-2 Visual Exam Personnel for Second ISI Interval.Relief Request RR-ENG-2-9 Encl.Without Page 3 of 3 + (ML20206T291)
- ML20206T292 + (ML20206T292)
- 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 + (ML20206T294)
- ML20206T296 + (ML20206T296)
- ML20206T298 + (ML20206T298)
- ML20206T299 + (ML20206T299)
- ML20206T300 + (ML20206T300)
- 05000353/LER-1999-002-03, :on 990419,various ESF Actuations Due to Loss of Power to 2A Rps/Ups Distribution Panel,Occurred.Caused by Loose Bus Bar Connection in RPS Breaker panel.Bus-bar Connection Inspected,Cleaned & re-tightened + (ML20206T301)
- ML20206T304 + (ML20206T304)
- 0CAN068607, Forwards Vols I-III of IEEE 634-1978 Std Cable Penetration Fire Stop Qualification Test:Arkansas Nuclear Units 1 & 2, Russellville,Ar - Site Specific,Arkansas Power & Light Co Spec APL-2434, Final Rept + (ML20206T305)
- ML20206T309 + (ML20206T309)
- ML20206T311 + (ML20206T311)
- 1CAN068606, Requests Util 801031 Tech Spec Change Request Re Electromatic Relief Valve Be Withdrawn from Consideration, Per Conversation W/Vissing + (ML20206T314)
- ML20206T318 + (ML20206T318)
- ML20206T319 + (ML20206T319)
- 05000395/LER-1999-006, :on 990502,identified Substantial Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Caused by Cotter Pin Striking Latch Check Switch Mounting Bracket & Bending It Forward.Subject Switch Was Removed,Per 10CFR21.21.a(1) + (ML20206T321)
- ML20206T323 + (ML20206T323)
- 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl + (ML20206T324)
- ML20206T326 + (ML20206T326)
- ML20206T327 + (ML20206T327)
- ML20206T332 + (ML20206T332)
- ML20206T335 + (ML20206T335)
- ML20206T336 + (ML20206T336)
- BECO-86-089, Estimates That Unit Will Be Ready to Return to Svc by End of Aug Following RHR Pump Insp.Adverse Affect of Current Unplanned Outage on long-term App R Fire Protection Program & Util Understanding of 10CFR50.48 Provision Discussed + (ML20206T340)
- ML20206T344 + (ML20206T344)
- ML20206T345 + (ML20206T345)
- ML20206T349 + (ML20206T349)
- ML20206T350 + (ML20206T350)
- ML20206T357 + (ML20206T357)
- ML20206T362 + (ML20206T362)
- ML20206T363 + (ML20206T363)
- ML20206T364 + (ML20206T364)
- ML20206T365 + (ML20206T365)
- ML20206T369 + (ML20206T369)
- ML20206T370 + (ML20206T370)
- ML20206T374 + (ML20206T374)
- ML20206T377 + (ML20206T377)
- ML20206T378 + (ML20206T378)
- ML20206T380 + (ML20206T380)
- ML20206T381 + (ML20206T381)
- B17768, Forwards First Quarter 1999 Performance Rept, for Jan-Mar 1999,addressing Performance of Station Key Issues & Backlog Mgt.Document Contains Status of ICAVP Level 4 Drs & Sargent & Lundy ICAVP Final Rept Findings + (ML20206T382)
- ML20206T384 + (ML20206T384)