Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000267/LER-1986-009, :on 860125,one of Three Helium Circulator a Steam/Water Drain Malfunction Trip Channels Inoperable. Caused by Spare Wire Shorted to Ground Causing Power Supply Fuse Failure.Spare Wire Terminated + (ML20205K376)
- ML20205K380 + (ML20205K380)
- IA-88-378, Forwards Draft Rept, Shipping Container Response to Severe Highway & Railroad Accident Conditions. W/O Encl + (ML20205K381)
- ML20205K381 + (ML20205K381)
- ML20205K383 + (ML20205K383)
- ML20205K385 + (ML20205K385)
- ML20205K387 + (ML20205K387)
- ML20205K388 + (ML20205K388)
- B11937, Discusses Reactor Cavity Pool Seal Status.Plant Procedures Used to Respond to Decreasing Reactor Cavity Water Level Remain Valid.New Permanent Seal Design Reviewed Against IE Bulletin 84-03 & All Appropriate Plant Procedures + (ML20205K389)
- ML20205K391 + (ML20205K391)
- ML20205K392 + (ML20205K392)
- ML20205K394 + (ML20205K394)
- ML20205K395 + (ML20205K395)
- ML20205K396 + (ML20205K396)
- ML20205K397 + (ML20205K397)
- ML20205K398 + (ML20205K398)
- 0CAN108804, Forwards Rev 14 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20205K399)
- ML20205K400 + (ML20205K400)
- ML20205K401 + (ML20205K401)
- ML20205K403 + (ML20205K403)
- IR 05000341/1985027 + (ML20205K407)
- ML20205K408 + (ML20205K408)
- 05000219/LER-1998-015-01, Forwards LER 98-015-01,as Original Submittal on 981028 Inadvertently Indicated That Suppl Would Be Submitted.Suppl Should Not Have Been Required as Only Change Is on Cover Page + (ML20205K409)
- ML20205K410 + (ML20205K410)
- 05000304/LER-1986-006-01, :on 860122,during Logic Testing,Train B Breaker Rather than Train a Opened.Caused by Miswiring of Reactor Trip Switchgear During Mod.Investigation of Shut Trip Mod Activities in Progress.Testing Completed + (ML20205K413)
- ML20205K417 + (ML20205K417)
- ML20205K419 + (ML20205K419)
- LG-85-002, Forwards Actions Taken to Improve Regulatory Performance in Fire Protection & in Areas in Which Activity Continuing & SALP 1 Goal Not Achieved,Per SALP 6 Board Rept 50-341/85-27 + (ML20205K420)
- ML20205K421 + (ML20205K421)
- 05000304/LER-1986-007, :on 860123,before Trip Breakers Opened Manually,Reactor Trip Occurred After Switching Instrument Power Supply.Caused by Failure to Communicate Station Policy.Supervisor Will Receive Addl Training + (ML20205K424)
- ML20205K425 + (ML20205K425)
- 05000388/LER-1986-003, :on 860124,Tech Spec Motherhood Clause Entered Due to Malfunctioning Which Provides ECCS Initiation Signals.Caused by Broken Adjustment Locking Screw Replaced + (ML20205K428)
- ML20205K430 + (ML20205K430)
- ML20205K431 + (ML20205K431)
- ML20205K432 + (ML20205K432)
- ML20205K434 + (ML20205K434)
- NUREG-0518, Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants + (ML20205K436)
- ML20205K437 + (ML20205K437)
- ML20205K441 + (ML20205K441)
- IR 05000245/1987003 + (ML20205K444)
- ML20205K445 + (ML20205K445)
- ML20205K448 + (ML20205K448)
- ML20205K452 + (ML20205K452)
- ML20205K454 + (ML20205K454)
- ML20205K457 + (ML20205K457)
- ML20205K462 + (ML20205K462)
- ML20205K467 + (ML20205K467)
- 05000267/LER-1986-008, :on 860124,during Shutdown,Mechanical Snubber Surveillance Tests Determined That 28 Snubbers Inoperable When Removed from Svc.Caused by Internal Dirt & Corrosion. Snubbers Reworked,Recertified & Reinstalled + (ML20205K468)
- PNO-III-99-019, on 990408,informed NRC Operations Ctr of 990407 Contamination Event Resulting from Package Picked Up by Medi-Physics Pharmacy Driver at West Suburban Hosp in Il.Il Conducting Investigation at West Suburban Hosp + (ML20205K470)
- ST-HL-AE-2837, Responds to NRC Re Violations Noted in Insp Rept 50-498/88-54.Corrective actions:off-normal Procedure Enhancement Program Instituted to Upgrade Overall Quality of Procedures.Program Scheduled to Be Completed by 881231 + (ML20205K471)
- ML20205K473 + (ML20205K473)