Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205H758 + (ML20205H758)
- ML20205H759 + (ML20205H759)
- ML20205H763 + (ML20205H763)
- ML20205H767 + (ML20205H767)
- ML20205H768 + (ML20205H768)
- TXX-4937, Responds to IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps. Procedures Developed for Monitoring Fluid Conditions within Automatic Feedwater Sys,For Recognizing Steam Binding & for Restoring Sys to Operable Status + (ML20205H769)
- 05000327/LER-1988-035-01, :on 880927,auxiliary Bldg Isolation Occurred When Operator Inadvertently Tripped Circuit Breaker A. Cause Not Determined.Training Ltr Issued to All Licensed Operators Detailing Event + (ML20205H770)
- ML20205H771 + (ML20205H771)
- ML20205H781 + (ML20205H781)
- ML20205H783 + (ML20205H783)
- 05000311/LER-1986-005-02, :on 860715,during Reactor Startup,Voltage Spike Occurred on Vital Instrument Inverter 2B.Caused by Technician Connecting Leads Incorrectly.Technician Counseled.Procedure Revised + (ML20205H786)
- ML20205H792 + (ML20205H792)
- ML20205H794 + (ML20205H794)
- 05000302/LER-1986-011, :on 860722,control Rod Rendered Inoperable When Electricians Replaced Three Relays That Transfer Rod Position Indication Between Absolute & Relative.Tech Specs Voluntarily Entered Due to Planned Maint + (ML20205H797)
- ML20205H798 + (ML20205H798)
- ML20205H799 + (ML20205H799)
- ML20205H801 + (ML20205H801)
- ML20205H805 + (ML20205H805)
- IR 05000286/1986014 + (ML20205H808)
- TXX-4950, Interim Deficiency Rept CP-86-49 Re Effects of polar-organic Solvents on Sealants in Conax Adaptor Modules & Electrical Penetrations.Initially Reported on 860711.Site Procedure Being Reviewed.Next Rept Will Be Submitted by 860916 + (ML20205H812)
- 05000259/LER-1988-032-02, :on 880914,electrical Separation Requirements Violated.Caused by Inadequate Design Controls.Discrepancies Will Be Evaluated for Impact on Sys Required to Be Operational in Refueling Mode + (ML20205H813)
- ML20205H816 + (ML20205H816)
- ML20205H817 + (ML20205H817)
- ML20205H818 + (ML20205H818)
- ML20205H819 + (ML20205H819)
- ML20205H820 + (ML20205H820)
- ML20205H823 + (ML20205H823)
- ML20205H826 + (ML20205H826)
- ML20205H828 + (ML20205H828)
- DCL-86-235, Submits Accurate Description of Wastewater Holding Pond for Best Mgt Practices Plan Item B.6.Pond Used Only Occasionally to Temporarily Store Wastewater That Cannot Be Discharged. Plan Rev Being Prepared for Adoption by 870131 + (ML20205H829)
- ML20205H831 + (ML20205H831)
- ML20205H833 + (ML20205H833)
- ML20205H834 + (ML20205H834)
- ML20205H836 + (ML20205H836)
- ML20205H838 + (ML20205H838)
- ML20205H840 + (ML20205H840)
- ML20205H841 + (ML20205H841)
- ML20205H842 + (ML20205H842)
- ML20205H845 + (ML20205H845)
- ML20205H846 + (ML20205H846)
- ML20205H850 + (ML20205H850)
- ML20205H851 + (ML20205H851)
- PNO-I-88-110, on 881021,delay in Restart of Units 2 & 3 Until Second & Third Quarter 1989,respectively,to Allow Further Upgrade in Operator Training,Managerial & Supervisory Effectiveness & Plant Security + (ML20205H853)
- ML20205H855 + (ML20205H855)
- ML20205H856 + (ML20205H856)
- ML20205H860 + (ML20205H860)
- ML20205H863 + (ML20205H863)
- ML20205H864 + (ML20205H864)
- ML20205H869 + (ML20205H869)
- ML20205H872 + (ML20205H872)
- ML20205H875 + (ML20205H875)