AUG 11 1986 Docket No. 50-286 Power Authority of the State of New York
Indian Point 3 Nuclear Power Plant ATTN: Mr. William Josiger l
Resident Manager P. O. Box 215
Buchanan, New York 10511 i
Gentlemen:
.
Subject: EXAMINATION REPORT 50-286/86-14(OL)
i j
On June 11, 1986, the NRC administered an examination to an employee of your company who had applied for a license to operate your Indian Point Unit 3 i
Facility. At the conclusion of the examination, preliminary findings were discussed with a member of your staf f identified in the enclosed report.
i
In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
No reply to this letter is required. Your cooperation in this matter is appreciated.
!
Original Signed ]hrg'
l
{
Samuel J. Collins, Chief
'
Projects Branch No. 2 i
Division of Reactor Projects l
Enclosure:
!
Examination Report No. 50-286/86-14(0L)
!
cc w/ encl:
L W. SincM President j,
J. " Bayne, First Executive Vice President and Chief Operations Officer J
Brons, Senior Vice President - Nuclear Generation
'
G. c. Goldstein, Assistant General Counsel
.
A. Klausmann, Vice President - Quality Assurance
F. X. Pindar, Quality Assurance Superintendent G. M. Wilverding, Chairman, Safety Review Committee
M. Blatt, Director, Regulatory Affairs (Com Ed)
'
NRC Licensing Project Manager j
Deptrtment of Public Service, State of New York j
R. Tansky, Training. Superintendent
>
8608200153 860911 FICIAL RECORD COPY OLER IP3 - 0001.0.0
+=
PDR ADOCK 00000 e6*
07/28/86 jf4EV)-
'
(
'
..-
.
-
_..=
--
.
Indian Point Unit 3 Facility
,
Public Document Room (PDR)
Local Public Document Room Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York bec w/ encl:
Region I Docket Room (w/ concurrences)
Management Assistant, DRMA (w/o encl)
Examiner Chief, OLB DHFT, NRR Master Exam File OL File (w/ concurrences)
/
h
$
RI:
RI:El:P, RI:DRP
- DRP P
Dud l r/emw Kell o Kister nville 111 7/
V86 7/of/86
//b/86
/Il/86 3/3/86 0FFICIAL RECORD COPY OLER IP3 - 0001.1.0 07/28/86 l
l
'
_
.-
F
,
.
.
REPCRT DETAILS TYPE OF EXAM:
Replacement EXAM RESULTS:
(
,
SRO Pass /Failr Simulator Exam 0/1 Overall 0/1 1.
CHIEF EXAMINER AT SITE:
N. Dudley 2.
Weaknesses noted during the simulator examination:
DifficultieswereobservebinfollowingtheEmergencyOperatingProcedures (EOP). Steps were performed out of sequence and transitions were not made i
properly from one procedure to another. As a result, in one scenario the
'
severity of the transient was increased.
Weaknesses were also observed in providing clear and concise directions to operators. These problems indicate that more emphasis should be placed on use of the E0P's and on supervisory skills.
3.
Problems experienced with the Indian Point 2 simulator:
Problems were experienced with the Indian Point 2 simulator, which was used for the simulator examination. The simulator was unable to operate longer than five minutes at 100% power steady state conditions without tripping on a spurious high flux signal. The simulator was unable to simulate dual failures in single-systems.
~ '
'
For example, the simulator,cculd not simulate an ejected rod and sub-sequent failure of rods to fasert;on the resulting reactor trip. Also the simulator was unable to prope'rly simulate a steam generator which was both ruptured and faulted.
,
These deficiencies are in addition to specific simulator problems noted in Examination Reports Nos. 50-247/85-16(0L) and 50-247/85-28(0L).
The candidate was not evaluated with respect to the simulator deficien-cies.
.
OFFICIAL RECORD COPY
'OLER IP3 - 0003.0.0 07/29/86
,
. +.>.
I n
,
e
<
w
.
-..
-
_ _ ____ _.
.
.
.
4.
Personnel Present at Exit Interview:
NRC Personnel N. Dudley Facility Personnel B. Ray 5.
Summary of NRC Comments made at exit interview:
The type of examination administered was reviewed and a commitment to provide examination results in 30 days was made.