Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205C558 + (ML20205C558)
- ML20205C560 + (ML20205C560)
- ST-HL-AE-1347, Final Deficiency Rept Re Auxiliary Feedwater Sys Pipe Spools Supplied W/Incorrect Wall Thicknesses.Initially Reported on 850524.Spools Being Refabricated by Southwest Fabricating. Bechtel & Fabricator Agreed to Enforce Correct Process + (ML20205C561)
- ML20205C563 + (ML20205C563)
- ML20205C565 + (ML20205C565)
- 05000267/LER-1985-013, :on 850813,Loop 2 Steam Generator Penetration Interspaces Not Maintained Above Cold Reheat Steam Pressure W/Reactor Shut Down.Caused by Operator Error.Procedure OPOP-IB1 for Raising Pressure Revised + (ML20205C566)
- ML20205C567 + (ML20205C567)
- ML20205C568 + (ML20205C568)
- IR 05000322/1986012 + (ML20205C569)
- ML20205C570 + (ML20205C570)
- IA-88-463, Final Response to FOIA Request for Documents.App a Documents Totally Withheld (Ref FOIA Exemption 5) + (ML20205C572)
- ML20205C572 + (ML20205C572)
- ML20205C573 + (ML20205C573)
- PNO-V-86-052, on 860805,reactor Trip Initiated by Turbine Load Rejection When Control Valves Closed,Causing Insurge of Water Into Pressurizer.Cause Under Investigation + (ML20205C574)
- ST-HL-AE-1324, Final Deficiency Rept Re Phoenix Steel Thin Wall Pipe. Initially Reported on 850506.Suspect Pipe Released from Storage Yard Being Relocated & Scrapped.Ultrasonic Test Thickness Verification Will Be Performed on Installed Pipe + (ML20205C575)
- ML20205C576 + (ML20205C576)
- ML20205C577 + (ML20205C577)
- ML20205C579 + (ML20205C579)
- ML20205C580 + (ML20205C580)
- ML20205C581 + (ML20205C581)
- NG-99-0273, Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-7 + (ML20205C583)
- ML20205C584 + (ML20205C584)
- TXX-4552, Interim Deficiency Rept SDAR-190 Re Inadequate Consideration of Nonseismic to Seismic Effects in Architectural Features Design.Engineering Program Established Involving Field Verification & Damage Study Evaluation + (ML20205C586)
- ML20205C588 + (ML20205C588)
- ML20205C589 + (ML20205C589)
- ML20205C592 + (ML20205C592)
- ML20205C593 + (ML20205C593)
- ML20205C594 + (ML20205C594)
- ML20205C597 + (ML20205C597)
- ML20205C598 + (ML20205C598)
- ML20205C599 + (ML20205C599)
- ML20205C600 + (ML20205C600)
- ML20205C601 + (ML20205C601)
- ML20205C603 + (ML20205C603)
- ML20205C604 + (ML20205C604)
- ML20205C605 + (ML20205C605)
- ML20205C606 + (ML20205C606)
- ML20205C610 + (ML20205C610)
- B17713, Informs That There No Longer Exists Need to Maintain Millstone,Unit 1 Reactor Operator Licenses for Listed Individuals,Effective 990404 + (ML20205C611)
- ML20205C612 + (ML20205C612)
- ML20205C613 + (ML20205C613)
- SNRC-1324, Forwards Listing of Nuclear Property Insurance + (ML20205C614)
- ML20205C616 + (ML20205C616)
- ML20205C617 + (ML20205C617)
- PY-CEI-NRR-2380, Requests Approval of Attached Repair Plan for Feedwater Nozzle to safe-end Weld N4C-KB.Proposed Weld Overlay Design & Installation Plan Details Included in Attachment 1. Attachment 2 Provides Applicable Preliminary Weld Procedure + (ML20205C618)
- IA-88-310, Final Response to FOIA Request for Documents.App a Records Partially Withheld (Ref FOIA Exemption 5) + (ML20205C619)
- ML20205C619 + (ML20205C619)
- 05000250/LER-1986-027, :on 860619,five Tech Spec Required Calibrs & Channel Functional Tests Not Performed.Caused by Personnel Error.Procedures Revised,New Procedures Implemented & Weekly Planning Meetings Instituted + (ML20205C623)
- ML20205C625 + (ML20205C625)
- ML20205C627 + (ML20205C627)
- ML20205C628 + (ML20205C628)