F BYRON NUCLEAR POWER STATION UNIT 1 MONTHLY PERFORMANCE REPORT CC N TH EDISON COMPANY NRC DOCKET NO. 050-454 LICENSE NO. NPF-37 8509230053 850911 PDR ADOCK 05000454 R
- s
)[IN)
L
-ifF
g..
g
,I.
Monthly Rsport for Byron Unit 1 A.
Summary of Opsrating Experienca for Unit 1 Byron Station's Unit 1 continued in its 100% power startup testing sequence.
The Unit began this reporting period in a maintenance outage following the 100*4 plant trip test in late July. The unit started to return to power on August 1, but was administratively shutdown due to a failed surveillance on the containment hatch. After repairs, the Unit was bought to 98% power and remained there until August 7th.
On the 7th the Unit was tripped by a 2 out of 4 coincidence of high negative flux rate. The cause was an error by Instrument Mechanics performing a power range channel calibration. The Unit was returned to power and remained there until August 25th.
On August 25th, power was reduced to 25% to facilitate repairs on the Feed Water Reg. Valves. Afterwards, on the 29th, the Unit was administratively shutdown due to weld concerns on certain Safety Injection valves. The Unit remained shutdown through the end of the reporting period.
I l
Y
,B.
OPERATING DATA REPORT DOCKET NO.:
050-454 UNIT: Byron One DATE: 9/11/85 COMPILED BY:
J.E. Langan TELEPHONE:
(815)234-5441 x2825 OPERATING STATUS 1.
Reporting Period: August 1985 Gross Hours in Reporting Period:
744 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross )
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED 3.
Power Level to Which Restricted (If Any): 1075 (MWe-gross) 4.
Reasons for Restriction (If Any): S/G Moisture Carryover High THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactor was Critical 660.6 3375.4 3375.4 6.
Reactor Reserve Shutdown Hours 0
0 0
7.
Hours Generator on Line 632.8 2755.8 2755.8 8.
Unit Reserve Shutdown Hours 0
0 0
9.
Gross Thermal Energy Generated (MWH) 1720850 5663371 5663371
- 10. Gross Elec. Energy Generated (MWH) 559704 1777457 1777457
- 11. Net Elec. Energy Generated (MWH) 520929 1586916 1586916
- 12. Reactor Service Factor 0
0 0
- 13. Reactor Availability Factor 0
0 0
- 14. Unit Service Factor 0
0 0
- 15. Unit Availability Factor 0
0 0
- 16. Unit Capacity Factor (Using MDC) 0 0
0
- 17. Unit Capacity Factor (Using Design MWe) 0 0
0
- 18. Unit Forced Outage Rate 0
0 0
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each) N/A
- 20. If Shutdown at End of Report Period, Estimated Date of Startup:
September 1, 1985
- 21. Units in Test Status (Prior to Commercial Operation): Unit 1 FORECAST ACHIEVED Initial Criticality 1-25-85_
2-2-85 Initial Electricity 3-1-85 Commercial Operation
.C.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron Ons DATE:
9/11/85 COMPILED BY:
J.E. Langan TELEPHONE:
(815)234-5441 x2825 MONTH: August, 1985 1.
O MW 17.
856 MW 2.
95 MW 18.
1031 MW 3.
1012 MW 19.
1021 MW 4.
1065 MW 20.
1013 MW 5.
1067 'MW 21.
1014 MW 6.
1065 MW 22.
939 MW 7.
386 MW 23.
887 MW 8.
291 MW 24.
982 MW 9.
1032 MW 25.
769 MW 10.
1004 MW 26.
165 MW 12.
973 MW 28.
165 MW 13.
1010 MW 29.
58 MW 14.
1009 MW 30.
O MW 15.
1009 MW 31.
O MW 16.
942 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical ruting of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
E.
UNIQUE REPORTING REQUIREMENTS 1.
Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None u.
o
- -. =.
, F.
LICENSEE EVENT REPORTS l
Th1 following in a tabular summary of all licensco sv:nt reports for Byron l
l Nuclear Power Station, Unit One, submitted during the reporting period, August 1 through August 31, 1985. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Licensee Event Report Number Date Title of Occurrence 84-043-01 8-23-85 Failure to Perform ASME Section XI Testing.
85-011-01 8-20-85 Inoperability of Both SI Trains.
85-062-00*
7-26-85 Over Temperature Delta T Reactor Trip / Loss of Two Cire Water Pumps.
85-063-00 8-7-85 Reactor Trip due to Turbine Trip above P-7.
i 85-064-00*
7-25-85 Unit 1 Containment Ventilation.
85-065-00 8-7-85 Auto Start of OBVC Makeup Fan 85-066-00 8-12-85 Rx Trip on Load Rejection.
85-067-00 8-9-85 O2 Concentration Exceeding 2%.
t 85-068-00 8-12-85 Reactor Trip on High Negative Flux Rate.
85-069-00 8-13-85 Reactor Trip by SSPS Train B,-
While Troubleshooting Rod Control.
85-070-00 8-23-85 Failure of IB RH Pump Due to High Vibration.
85-071-00 8-14-85 Main Steamline Isolation During Surveillance Testing.
85-072-00 8-15-85 Non Qualified Lubricant in Valve l
1CC9438.
85-073-00 8-21-85 Feedwater Isolation During Plant l
Startup.
l i
(
85-074-00 8-29-85 Automatic Actuation of Fuel l
Handling Building Charcoal r
Booster Fan.
t F
l i
i i
I L
t l
t
,Lic n~7 Ev nt R port Numb r Dato Titlo of Occurrenes 85-075-00 8-28-85 Pcilure of L:sk R te Surveillance on Containment Airlock.
85-077-00 8-28-85 Auto Start of OB Fl! Booster Fan.
85-081-00 8-23-85 RI! System Inoperable Due to Surveillance Lineup.
l Inadvertently omitted from July Report.
.