Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205C545 + (ML20205C545)
- ML20205C546 + (ML20205C546)
- ML20205C547 + (ML20205C547)
- IR 05000498/1987011 + (ML20205C549)
- ML20205C551 + (ML20205C551)
- 05000416/LER-1985-031, :on 850816,cell in Div 1 Battery Bank Found to Be Inoperable Based on 850813 Specific Gravity Measurements. Caused by Personnel Error.Surveillance Procedure Being Revised to Clarify When Battery Inoperable + (ML20205C552)
- SVP-99-054, Forwards Quad Cities Simulator Four-Yr Certification Rept, IAW 10CFR55.45,Section (b)(5)(ii).Rept Summarizes Simulator Testing Performed Since Last Certification Rept Submitted on 950310 + (ML20205C554)
- ML20205C555 + (ML20205C555)
- ML20205C558 + (ML20205C558)
- ML20205C560 + (ML20205C560)
- ST-HL-AE-1347, Final Deficiency Rept Re Auxiliary Feedwater Sys Pipe Spools Supplied W/Incorrect Wall Thicknesses.Initially Reported on 850524.Spools Being Refabricated by Southwest Fabricating. Bechtel & Fabricator Agreed to Enforce Correct Process + (ML20205C561)
- ML20205C563 + (ML20205C563)
- ML20205C565 + (ML20205C565)
- 05000267/LER-1985-013, :on 850813,Loop 2 Steam Generator Penetration Interspaces Not Maintained Above Cold Reheat Steam Pressure W/Reactor Shut Down.Caused by Operator Error.Procedure OPOP-IB1 for Raising Pressure Revised + (ML20205C566)
- ML20205C567 + (ML20205C567)
- ML20205C568 + (ML20205C568)
- IR 05000322/1986012 + (ML20205C569)
- ML20205C570 + (ML20205C570)
- IA-88-463, Final Response to FOIA Request for Documents.App a Documents Totally Withheld (Ref FOIA Exemption 5) + (ML20205C572)
- ML20205C572 + (ML20205C572)
- ML20205C573 + (ML20205C573)
- PNO-V-86-052, on 860805,reactor Trip Initiated by Turbine Load Rejection When Control Valves Closed,Causing Insurge of Water Into Pressurizer.Cause Under Investigation + (ML20205C574)
- ST-HL-AE-1324, Final Deficiency Rept Re Phoenix Steel Thin Wall Pipe. Initially Reported on 850506.Suspect Pipe Released from Storage Yard Being Relocated & Scrapped.Ultrasonic Test Thickness Verification Will Be Performed on Installed Pipe + (ML20205C575)
- ML20205C576 + (ML20205C576)
- ML20205C577 + (ML20205C577)
- ML20205C579 + (ML20205C579)
- ML20205C580 + (ML20205C580)
- ML20205C581 + (ML20205C581)
- NG-99-0273, Forwards 1999 DAEC Simulator Certification Rept, Per 10CFR55.45 Every Four Years on Anniversary of Certification. Required Info Contained in Attachments 1-7 + (ML20205C583)
- ML20205C584 + (ML20205C584)
- TXX-4552, Interim Deficiency Rept SDAR-190 Re Inadequate Consideration of Nonseismic to Seismic Effects in Architectural Features Design.Engineering Program Established Involving Field Verification & Damage Study Evaluation + (ML20205C586)
- ML20205C588 + (ML20205C588)
- ML20205C589 + (ML20205C589)
- ML20205C592 + (ML20205C592)
- ML20205C593 + (ML20205C593)
- ML20205C594 + (ML20205C594)
- ML20205C597 + (ML20205C597)
- ML20205C598 + (ML20205C598)
- ML20205C599 + (ML20205C599)
- ML20205C600 + (ML20205C600)
- ML20205C601 + (ML20205C601)
- ML20205C603 + (ML20205C603)
- ML20205C604 + (ML20205C604)
- ML20205C605 + (ML20205C605)
- ML20205C606 + (ML20205C606)
- ML20205C610 + (ML20205C610)
- B17713, Informs That There No Longer Exists Need to Maintain Millstone,Unit 1 Reactor Operator Licenses for Listed Individuals,Effective 990404 + (ML20205C611)
- ML20205C612 + (ML20205C612)
- ML20205C613 + (ML20205C613)
- SNRC-1324, Forwards Listing of Nuclear Property Insurance + (ML20205C614)
- ML20205C616 + (ML20205C616)