Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203L334 + (ML20203L334)
- ML20203L335 + (ML20203L335)
- ML20203L337 + (ML20203L337)
- ML20203L338 + (ML20203L338)
- ML20203L339 + (ML20203L339)
- ML20203L340 + (ML20203L340)
- ML20203L341 + (ML20203L341)
- 1CAN088606, Provides Schedule for Adding PORV & Block Valves to Facility Integral Simulation Test Program,In Response to . Program Scheduled for Implementation by 870101 + (ML20203L343)
- ML20203L345 + (ML20203L345)
- ML20203L346 + (ML20203L346)
- ML20203L349 + (ML20203L349)
- ML20203L350 + (ML20203L350)
- W3P86-0191, Advises That Since Requirements of Condition 2.C.16b of License NPF-18 Satisfied Per Ref Ltr,Nrc Approval to Implement Described Changes to Modified Lessons Learned Training Program Effective on 860501 Unnecessary + (ML20203L352)
- ML20203L353 + (ML20203L353)
- SVP-98-068, Transmits Long Term Plan to Assure Continued Integrity of Reactor Pressure Vessel Closure Studs as Discussed in Response to NRC Insp Repts 50-254/97-18 & 50-265/97-18 + (ML20203L354)
- ML20203L355 + (ML20203L355)
- AECM-86-0210, Forwards Degraded Core Accident Hydrogen Control Program, Quarterly Status Rept for Quarter Ending 860630 + (ML20203L356)
- ML20203L358 + (ML20203L358)
- AECM-86-0252, Forwards Fee for 860714 Application Revising Relief Request I-00008,per NRC 860804 Request + (ML20203L359)
- ML20203L360 + (ML20203L360)
- SVP-98-062, Informs NRC of Change of Committed Due Date in Submitted Ltr .Station Changing Due Date of Item to 980918 + (ML20203L361)
- ML20203L362 + (ML20203L362)
- B12175, Forwards Request for Exemption from 10CFR50.62(c) Requirements Re Initiation of Turbine Trip Under ATWS Conditions.Installation of Addl Trip Relays in Auxiliary Feedwater Initiation Circuitry Unwarranted.Fee Paid + (ML20203L364)
- ML20203L365 + (ML20203L365)
- ML20203L366 + (ML20203L366)
- ML20203L367 + (ML20203L367)
- ML20203L369 + (ML20203L369)
- IA-98-050, Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Made Available in PDR + (ML20203L370)
- ML20203L370 + (ML20203L370)
- ML20203L371 + (ML20203L371)
- ML20203L373 + (ML20203L373)
- ML20203L374 + (ML20203L374)
- B12203, Confirms That Current pressure-temp Operating Limit Curves Valid Until at Least 870702,per 860708 & 16 Telcons.License Amend Request Re Revised pressure-temp Curves Will Be Submitted by 861031 + (ML20203L376)
- 05000482/LER-1986-015, :on 860326,control Room Ventilation Isolation Signal Occurred as Result of Chlorine Monitor GK-AITS-3 Signal.Caused by Blown Fuse in Monitor Due to Punched Power Lead in Sample Pump.Pump & Fuse Replaced + (ML20203L377)
- ML20203L378 + (ML20203L378)
- ML20203L379 + (ML20203L379)
- ML20203L383 + (ML20203L383)
- ML20203L384 + (ML20203L384)
- ML20203L385 + (ML20203L385)
- ML20203L386 + (ML20203L386)
- ML20203L389 + (ML20203L389)
- ML20203L391 + (ML20203L391)
- ML20203L392 + (ML20203L392)
- ML20203L394 + (ML20203L394)
- ML20203L395 + (ML20203L395)
- ML20203L397 + (ML20203L397)
- ML20203L400 + (ML20203L400)
- ML20203L401 + (ML20203L401)
- ML20203L402 + (ML20203L402)
- ML20203L404 + (ML20203L404)
- ML20203L405 + (ML20203L405)