Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199J692 + (ML20199J692)
- 05000483/LER-1986-019, :on 860606,during Mode 1,reactor Trip Occurred on Low Pressurizer Pressure.Caused by Technician Deviation from Calibr Procedure.Progressive Discipline Administered. Guidelines Given to Technicians + (ML20199J694)
- ML20199J695 + (ML20199J695)
- ML20199J696 + (ML20199J696)
- ML20199J698 + (ML20199J698)
- ML20199J699 + (ML20199J699)
- 05000269/LER-1986-007-02, :on 860502,discovered That Two Channels of Reactor Protective Sys (RPS) Inoperable at Same Time During Adjustment of hi-flux Trip Setpoint.Caused by Failure to Properly Tag Inoperable Module in RPS Cabinet + (ML20199J700)
- ML20199J701 + (ML20199J701)
- ML20199J706 + (ML20199J706)
- 05000482/LER-1986-073-01, Forwards LER 86-073-01,re Event in Which Wolf Creek TSs Were Not Met.Commitments Made by Util,Encl + (ML20199J709)
- ML20199J710 + (ML20199J710)
- ML20199J711 + (ML20199J711)
- ML20199J713 + (ML20199J713)
- ML20199J717 + (ML20199J717)
- ML20199J718 + (ML20199J718)
- ML20199J719 + (ML20199J719)
- ML20199J721 + (ML20199J721)
- ML20199J724 + (ML20199J724)
- ML20199J725 + (ML20199J725)
- ML20199J727 + (ML20199J727)
- 05000482/LER-1986-073, :on 860102,leak Rate Testing of Containment H Purge Sys Was Not Performed IAW All Requirements of TS 3.6.1.7.Cause Identified as Mindset.Revised Procedure & SAR Changes + (ML20199J728)
- GO2-98-016, Informs That Commitment to Perform Chemical Decontamination of Reactor Recirculation Sys Discharge Piping During R13 Outage in Spring 1998,is Modified.Chemical Decontamination Will Not Be Performed During R13 Outage + (ML20199J730)
- ML20199J731 + (ML20199J731)
- 05000346/LER-1986-005, :on 851221,discovered Inadequate Axial Seam Overlap on 93 as-installed Bisco Boot Seals.Caused by Lack of Clarity in Bisco Procedure Sp 505.New Installation Procedure MP 1700.29 Approved + (ML20199J732)
- ML20199J733 + (ML20199J733)
- ML20199J736 + (ML20199J736)
- ML20199J737 + (ML20199J737)
- ML20199J738 + (ML20199J738)
- ML20199J739 + (ML20199J739)
- ML20199J740 + (ML20199J740)
- ML20199J741 + (ML20199J741)
- ML20199J743 + (ML20199J743)
- ML20199J744 + (ML20199J744)
- BSEP-97-0535, Submits Changes to Two Enclosures in Re Reactor Vessel Matl Surveillance Program + (ML20199J746)
- ML20199J748 + (ML20199J748)
- ML20199J749 + (ML20199J749)
- ML20199J754 + (ML20199J754)
- HL-5564, Comment on Draft NUREG 1555, Updated Environ Standard Review Plan + (ML20199J755)
- ML20199J756 + (ML20199J756)
- ML20199J757 + (ML20199J757)
- ML20199J758 + (ML20199J758)
- BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries + (ML20199J761)
- ML20199J765 + (ML20199J765)
- ML20199J766 + (ML20199J766)
- ML20199J770 + (ML20199J770)
- ML20199J772 + (ML20199J772)
- ML20199J773 + (ML20199J773)
- ML20199J774 + (ML20199J774)
- ML20199J776 + (ML20199J776)
- ML20199J777 + (ML20199J777)
- ML20199J781 + (ML20199J781)