Concurs Conditionally on Final Remedial Action Plan & Site Design for Stabilization of Inactive U Mill Tailings Site. Design of Radon Barrier,Groundwater & Contaminated Woodchip Cleanup & Subcontracts LKV-3 & LVK-4 Need NRC Review
ML20199J777
Person / Time
Issue date: 06/09/1986
From: Rich Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Themelis J
ENERGY, DEPT. OF
References
REF-WM-64 NUDOCS 8607080430
Download: ML20199J777 (4)


Text

O

6 DISTRIBUTION

~

Docket. File WM-64

^

PDR/DCS-DBangart, RIV WM-64/TT0/86/05/29/0 T01sen HRose RBrich PGarcia JUN 0 9 N06 EHawkins LLW Branch, WMLU URF0 r/f URF0:TTO Docket No. WM-64 040WM181301E Mr. John G. Themelis, U.S. Department of Energy l

Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Themelis:

..,_.........This letter.is.our_ conditional concurrence on the. F.inal Remedial Action-

,.,.... Plan.and. Site. Design for-Stabilization-of the Inactive, Uranium. Mill ~. -

...m m.---Teilings-Site at-Lakeview, Oregon. -This" conditional concurrence'would ~ ~ ~ " ""*" K allow-remedial uction-activities -to' include excavatten and ' construction"-~~ -~

.of the disposal cell (excluding radon barrier placement and cell closure) and transfer and placement of contaminated tailings within the disposal cell. The conditional concurrence is based on review and acceptance to date of the following documents:

)

Remedial Action Plan and Site Design for Stabilization of Inactive Uranium Mill Tailings Site at Lakeview, Oregon - April,1986; Responses to comments on Final RAP - Lakeview Site, Ma3 7, 1986; t

Lakeview Main Construction Subcontract, LKV-1, Final Design for Construction, March,1986, to include letter of responses to NRC Review Comments on Subcontract Documents for LKV-1, April 10,1986, transmitted from Morrison-Knudsen Engineers, Inc., San Francisco, California; Lakeview Main Construction Subcontract, LKV-1, Final Design for Construction - Addendum No. 2, April 28,1986, and - Addendum No. 3, l

April 30, 1986-l Lakeview Main Site - Calculation Revision, April 30, 1986; 1.

Calculation No. 13-727-01-03, Erosion Protection, Revision D, I

OFC :

,NAME :

'DATE :86/06/02 8607080430 860609 PDR WASTE WM-64 PDR

4 1

I WM-64/TT0/86/05/29/0

_2-JUN 0e1E 2.

Calculation No. 13-769-01-01, Quality Estimates, Revision C, Remedial Action Inspection Plan for the Lakeview, Oregon, UMTRA Site, January 31, 1986, to include letter of May 2,1986, referring to radon barrier moisture content and telecopier transmittal from Morrison-Knudsen, May 22, 1986, referring to Seasonal Shutdown.

l Exceptions and outstanding items that still need review and concurrence l

by NRC are as follows:

Final design of the radon barrier.

This concurrence will follow after all locations for radon barrier material have been selected, j

the soil properties tested, the design finalized considering these actual soil properties, and the design submitted for approval.

Placement of radon barrier should not proceed prior to our concurrence in the design.

~ Ground-water strategy and-cleanup. -Construction'of'the disposal" '

., ~.-.~,

-cell,-transport of contaminated materials, and cleanup of'the'-

^-

processing site, vicinity properties and windblown tailings can proceed without resolution of this item.

Contaminated woodchips - survey, cleanup, placement and l

stabilization. Disposal of all contaminated materials should not

)

proceed until the volume of contaminated woodchips has been determined and any redesign of the disposal hos been completed and approved by this office.

Lakeview Uncontaminated Woodchips Subcontract, LKV-3, Final Design for Construction, May,1986.

Completion of this review and concurrence will be necessary before material is transported, or I

otherwise disposed of, from the processing site.

Mill Area Windblown Tailings Subcontract, LVK-4, Final Design for Review, May, 1986. Concurrence on this item should be completed prior to any cleanup of windblown tailings in the area of the processing site.

l l

l l0FC l_____:____________:____..______: _____ _____:.___________:____________: ___________:____._____

lNAME:

l_____:

lDATE :86/06/02 I

y WM-64/TT0/86/05/29/0 JUN 0 91986

' If you haie any questions, please contact Tom Olsen at FTS 776-2813 or Ed Hawkins or me at FTS 776-2805.

Sincerely,

/s/

R. Dale Smith, Director Uranium Recovery Field Office Region IV

Enclosure:

Copy of Signature /Coacurrence e

cc:

F. R. Miera, State of Oregon 4

r


:------[----:

0FC : URF0

URF

'*URF0 l

T01sen/1v EHawkins
  • RDSmith r

DkTE b6fb6fb2

.] [qf fh'~.~~~f[ '9-~~~~'[~~~~~~~~~~~~[~~-~~~-~~~~~l-~~--

7

1 l

~

V

~..

U.S. Department cf Energy Agreement No. DE-FC04-84AL20534 Appendix 8 SIGNATURE PAGE j

THE UNITED STATES OF AMERICA THE STATE OF OREGON OEPARTMENT OF ENERGY DEPARTMENT OF ENERGY BY:

BY:

James G. Hoyal Jr.

Lynn D. Frank, Director Contracting Officer Albuquerque Operations Office Pi BY:

, 0, a f Jo

~G. Thethelis",a Pro @jectManager, Uranium

~

~'

~

Mill Tailings Project Office Y

w CONCURRENCE NUCLEAR REGULATORY COMMISSION e-BY:

R. Dale Smith Director Uranium Recovery Field Office, Region 4 I