6.. m JM 2 71986 Docket No. 50-293 MEMORANDUM FOR: Harry Kister, Chief Projects Branch No. 1 FROM: Jack R. Strosnider, Chief Reactor Projects Section IB

SUBJECT:

PILGRIM STATUS REPORT FOR THE PERIOD JUNE 18 - JUNE 25,1986

Enclosed is the Pilgrim weekly status report from the NRC Resident Office at Pilgrim. Three NRC Resident Inspectors monitored routine activities at the plant during the report period. The reactor was in cold shutdown throughout the period for a maintenance outage.

These status reports are intended to provide NRC management and the public with an overview of plant activities and NRC inspection activities. Subsequent in-spection reports will address many of these topics in more detail.

Original' Signed By

, Jack R. Strosnider, Chief Reactor Projects Section IB

Enclosure:

As Stated cc w/ encl:

T. Murley, NRC, RI R. Starostecki, NRR, RI S. Ebneter, NRC, RI T. Martin, NRR, RI J. Partlow, NRC, IE W. Kane, NRR, RI J. Zwolinski, NRC, NRR J. Lydon, Chief Operating Officer, BECO L. Oxsen, Vice President, Nuclear Operations, BECO A. Pedersen, Station Manager, BECO Paul Levy, Chairman, Department of Public Utilities Chairman, Board of Selectmen Rep. Peter Forman J. D. Keyes Plymouth Civil Defense Director Senator Edward P. Kirby l Public Document Room (POR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Massachusetts (2) BDg 8607080423 860627 1FFICIAL RECORD COPY PILGRIM STATUS RPT - 0001.0.0 PDR ADOCK 05000293 I E.31 R PDR y

. ,L ^

I -

Memorandum for H. B. Kister 2 i

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

, DRP Section Chief W. Raymond, SRI, Vermont Yankee i T. Shedlosky, SRI, Millstone 1&2 .

H. Eichenholz, SRI, Yankee P. Leech, LPM, NRR PA0 (2) i 1

i i

J i

7 i

S RI:DRP Strosnider/mjd 6/11/86 OFFICIAL RECORD COPY PILGRIM STATUS RPT - 0002.0.0 l

06/27/86 j 1

l 1

i

,- ,~ ._..___.1-- _ . , _ , . _ . . _ , .~, . _ . . . . . - , _ . _

w s ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD JUNE 18 - JUNE 25, 1986 1.0 Plant Status As of 8:00 a.m. on June 25, 1986, the reactor was in cold shutdown with

. moderator temperature about 110 degrees Fahrenheit.

2.0 Facility Operations Summary The plant has been shut down for maintenance and to make program improve-ments since April 12, 1986. Boston Edison Company announced that planned inspections of Residual Heat Removal pumps in the Emergency Core Cooling System may lengthen the current outage.

3.0 Items of Special Interest j Management Change On June 20, 1986, the licensee announced a change in senior management structure. Effective July 1,1986, the Senior Vice President-Nuclear is leaving that position and becoming the Senior Vice President in charge of fossil generation operations. The Senior Vice President-Nuclear position will be eliminated and the Vice Presidents for Nuclear Operations and Engineering and Quality Assurance will report directly to the newly created position of Chief Operating Officer who in turn will report to the Chief Executive Officer.

Plymouth Area Chamber of Commerce Meeting On June 24, 1986, Dr. McBride met with the Board of Directors of the Plymouth Area Chamber of Commerce to discuss recent NRC action concerning Pilgrim Station. Representatives from the Plymouth County Nuclear Infor-mation Inc. organization and Boston Edison also participated in the meeting.

Overdue Surveillance Tests On June 21, 1986, the licensee reported that surveillance tests of under-voltage relays in safety-related electrical equipment may be overdue. The tests are required by the NRC to be conducted at a frequency of once per operating cycle.

The relays monitor voltage on an electrical transformer and one of two safety electrical buses. The relay on the second safety bus was apparent-ly still within the required testing time interval. In the event that low-voltage is sensed the relays are designed to actuate, thereby starting the emergency diesel generators, initiating the logic sequence by which the emergency diesel generators pick up electrical loads, and starting emer-gency core cooling equipment in the event of a loss of offsite power. The apparently overdue tests were identified during a followup investigation 1

1 0FFICIAL RECORD COPY PILGRIM STATUS RPT - 0003.0.0 1 11/29/80 j

p.

a Enclosure 2 j of other overdue tests (see June 10 to 18, 1986 weekly status report).

The licensee is continuing to evaluate the test scheduling problems. The
resolution of the problems will be reviewed by the NRC prior to startup. >

1 j 4.0 NRC Staff Status during the Period I Three NRC Resident Inspectors monitored pir.nt activities between June 18 1

and 25, 1986. Currently, the resident inspector staff at Pilgrim consists -

l of the following:

Martin McBride, Ph.D. --- Senior Resident Inspector Jeffrey Lyash --- Resident Inspector i

Gregory Nejfelt --- Resident Inspector i

l Two NRC inspection reports, 50-293/86-07 and 50-293/86-13, were issued j during the past week. The reports contained no violations.

1 ,

}

}

}

l l

a i

1 J

1 i

j i

1 I

l 0FFICIAL RECORD COPY PILGRIM STATUS RPT - 0003.1.0

, 11/29/80

4 I

I

}

_ _ - - - _ - - -,_,-,.,.,,,,,m, - - - - _ - - . , , , , . , , , , _ , , , , , - - , . , ._.,_m. . - , . _ _,_ , , , . , . . - . ,4 -m__--, _ , . ,- _ - ,