Forwards Rev 1 to IST Plan Pumps & Valves for Byron Nuclear Generating Station,Units 1 & 2. No Relief Requests Requiring Approval Included W/Rev
ML20199J749
Person / Time
Site: Byron  Constellation icon.png
Issue date: 01/29/1998
From: Gracesser K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199J753 List:
References
BYRON-98-5022, NUDOCS 9802060030
Download: ML20199J749 (1)


Text

. _ _

Ormmonwtalth l Ahmn Company

11) run (k nerating Station -

4 450 North (,trinan Church Itoad

11) run. II. b101(k9N i Tel Hi% M4 544I january 29,1998 LTR: BYRON 98 5022 FILE: 3.11.0530 U. S. Nuclear Regulatory Commission ATfN. Document Control Desk Washington, D.C 20535

Subject:

Revision I of the Byron 2" Interval insenice Testing Program for Pumps and Valves

Reference:

Robert A. Capra (Office of Nuclear Reactor Regulation), Letter to Irene bl.

Johnson (Comed) dated November 18,1996, Transmitting the NRC Safety Evaluation Report for Revision 0 of The Byron Station 2" Interval insenice Testing Plan for Pumps and Valves.

d Attached for your information is Revision 1 of the Byron 2 Interval insenice Testing Program for Pumps and Valves, There are no Relief Requests requiring approvalincluded with this Revision. Revision I consists of updates resulting from the NRC Safety Evaluation Report for Revision 0 of this program plan (see Reference), changes to the program due to plant modifications and minor administrative changes. The most significant of the changes covered by this revision are: Removal of the Partial Stroke Tests of 1/2FWOO9A-D and 1/2h1S00l A-D in accordance with Cold Shutdown Justification VC-2; deletion of valves IFW043A-D which were removed in the Unit i Steara Generator Modifications; addition of valves 0WWO49A/B electively incorporated into the program per Note 16; withdrawal of Relief Request VR-7 due to removal of OSX127A/B from the system; and addition of Refuel Outage Justification (ROJ-15) established for certain valves due to NPC denial of Relief Request VR-1.

If you need any additional information concerning this document, please contact hlarcia Lesniak, Nuclear Licensing Administrator, at (630) 6634184.

- Sincerely, s

/)&Q/

K. L. Graesser Site Vice President f

Byron Nuclear Power Station 9802060030 900129 I fQ ~/

Attachment PDR ADOCK 05000454 P PDR cc: Regional Administrator - Rlli Byron Project hianager - NRR Byron Senior Resident inspector ,

,L gy 1 )y lh g "{1]"'

L .

Office of Nuclear Safety - IDNS A t!nicom Compan) l

._