Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199H943 + (ML20199H943)
- ML20199H944 + (ML20199H944)
- ML20199H946 + (ML20199H946)
- IR 05000482/1997023 + (ML20199H950)
- 05000354/LER-1986-025, :on 860530,console Indication for Train a Svc Water Pump,Safety Auxiliary Cooling Pump & Emergency Diesel Generator Lost & Some Chillers Tripped.Caused by Design Deficiency Re Electrical Cabinet + (ML20199H952)
- ML20199H953 + (ML20199H953)
- ML20199H955 + (ML20199H955)
- ML20199H956 + (ML20199H956)
- ML20199H958 + (ML20199H958)
- ML20199H959 + (ML20199H959)
- ML20199H960 + (ML20199H960)
- ML20199H963 + (ML20199H963)
- ML20199H965 + (ML20199H965)
- ML20199H968 + (ML20199H968)
- ML20199H969 + (ML20199H969)
- NSD-NRC-98-5541, Provides Westinghouse Responses to FSER Open Items on AP600. Summary of Encl Responses Provided in Table 1.NRC Should Review Encls & Inform Westinghouse of Status to Be Designated in NRC Status Column of Oits + (ML20199H972)
- ML20199H974 + (ML20199H974)
- ML20199H975 + (ML20199H975)
- ML20199H976 + (ML20199H976)
- ML20199H978 + (ML20199H978)
- ML20199H981 + (ML20199H981)
- ML20199H983 + (ML20199H983)
- ML20199H986 + (ML20199H986)
- ML20199H990 + (ML20199H990)
- ML20199H992 + (ML20199H992)
- ML20199H995 + (ML20199H995)
- ML20199H998 + (ML20199H998)
- ML20199H999 + (ML20199H999)
- ML20199J003 + (ML20199J003)
- ML20199J005 + (ML20199J005)
- 05000277/LER-1997-010-02, :on 971229,2A RFPT Failed to Trip When RO Pushed CR 2A RFPT Trip push-button.Caused by Intermittent Failure Mechanism.Repaired,Reinstalled & Tested Operability of 2A RFPT + (ML20199J006)
- NPL-97-0751, Special Rept:On 971023,low Temp Overpressure Protection Sys Operation Occurred.Caused by Starting Reactor Coolant Pump w/water-solid Reactor Coolant Sys.Operating Personnel Will Be Briefed on Event + (ML20199J009)
- ML20199J010 + (ML20199J010)
- ML20199J012 + (ML20199J012)
- W3P86-1845, Discusses Progress on Procurement & Installation of plant- Specific Simulator for Training & Other Tasks.Simulator Will Not Be Ready for Training Use Until 870301 Due to Vendor Singer Co (Link) Problems + (ML20199J014)
- ML20199J015 + (ML20199J015)
- RC-97-0240, Provides Confirmation of Completion of Actions Taken in Response to GL 96-01, Testing of Safety-Related Logic Circuits, Per 10CFR50.54(f) + (ML20199J017)
- ML20199J018 + (ML20199J018)
- ML20199J022 + (ML20199J022)
- ML20199J024 + (ML20199J024)
- ML20199J025 + (ML20199J025)
- ML20199J026 + (ML20199J026)
- ML20199J027 + (ML20199J027)
- ML20199J028 + (ML20199J028)
- ML20199J030 + (ML20199J030)
- ML20199J031 + (ML20199J031)
- LR-N970746, Informs That Util Is Revising Commitment to Determine Total Sludge Loading from Current Refueling Outage to Next Refueling Outage,Currently Scheduled to Begin in mid-Feb 1999,re Ieb 96-003, Potential Plugging of ECC Suction.. + (ML20199J033)
- ML20199J035 + (ML20199J035)
- ML20199J037 + (ML20199J037)
- ML20199J038 + (ML20199J038)
- ML20199J041 + (ML20199J041)