Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A879 + (ML20199A879)
- ML20199A880 + (ML20199A880)
- IR 05000289/1985027 + (ML20199A881)
- ML20199A882 + (ML20199A882)
- ML20199A883 + (ML20199A883)
- ML20199A885 + (ML20199A885)
- ML20199A887 + (ML20199A887)
- ML20199A889 + (ML20199A889)
- ML20199A890 + (ML20199A890)
- ML20199A891 + (ML20199A891)
- 05000414/LER-1986-012-01, :on 860511,main Feedwater Sys Isolation Occurred.Caused by Main Feedwater Sys Control Bypass Valve Controller Card for Automatic Operation Being Out of Adjustment.Trip Reset.Valves Realigned + (ML20199A892)
- ML20199A893 + (ML20199A893)
- BVY-97-151, Requests That 970609 SER Re Exemption from Requirements of 10CFR50,App R,Section Iii.G,To Permit Use of Fireproof Cable in Plant Areas That Require Enclosing Cables in Fire Barrier Having 1-hour Fire Rating,Be Revised to Show Clarificatio + (ML20199A894)
- ML20199A895 + (ML20199A895)
- ML20199A896 + (ML20199A896)
- RC-98-0011, Informs of Utils Intention to Adopt & Implement Rev 1 to NUREG-1431,W Standardized Ts.Initiation of Project Will Commence in 1998,w/implementation Projected for Refuel Outage 12 Scheduled for Fall of 2000 + (ML20199A897)
- PLA-4795, Forwards Supplemental Info to Change LL of SSES Physical Security Plan.Plan Withheld from Public Disclosure,Per 10CFR73.21.W/o Encl + (ML20199A898)
- ML20199A899 + (ML20199A899)
- 05000341/LER-1986-013, :on 860513,10 of 15 RCS Safety/Relief Valves Failed Pressure Tolerance Surveillance Tech Spec Requirements.Cause Unknown.Valves Refurbished & Retested + (ML20199A900)
- ML20199A901 + (ML20199A901)
- ML20199A902 + (ML20199A902)
- ML20199A903 + (ML20199A903)
- ML20199A905 + (ML20199A905)
- ML20199A906 + (ML20199A906)
- BSEP-97-0484, Forwards Rev 1 to ESR 97-00034, Engineering Evaluations B213R1 Core Shroud Insps. Util Will Keep NRC Advised of Any Significant Changes Resulting from Review,However,None Expected + (ML20199A907)
- ML20199A908 + (ML20199A908)
- NPL-98-0039, Forwards Response to Violations Noted in Insp Rept 50-266/97-21 & 50-301/97-21.Corrective Actions:On 971128, Operability Determination Developed Which Provided Reasonable Assurance as to Operability of CCW Sys + (ML20199A910)
- ML20199A912 + (ML20199A912)
- ML20199A913 + (ML20199A913)
- NPL-97-0743, Forwards Rev to Pbnp Security Plan Section 2.4,dtd 971114 IAW Provisions Outlined in 10CFR50.54(p).Security Plan Withheld as Subject Matter Contains Safeguards Info + (ML20199A914)
- ML20199A917 + (ML20199A917)
- 05000295/LER-1986-022-01, :on 860512,auto-start of Auxiliary Feedwater Pumps Occurred During Draining of Steam Generator During Water Chemistry Mods.Caused by Lack of Procedure for Draining.Procedures Revised + (ML20199A919)
- BSEP-98-0015, Provides Plans for re-inspection of Core Shroud for Unit 1. Reinspections Planned for Upcoming Refueling Outage 11,which Is Presently Scheduled to Begin on 980425,per GL 94-03 + (ML20199A920)
- ML20199A924 + (ML20199A924)
- ML20199A925 + (ML20199A925)
- ML20199A927 + (ML20199A927)
- ML20199A928 + (ML20199A928)
- ML20199A929 + (ML20199A929)
- ML20199A930 + (ML20199A930)
- ML20199A933 + (ML20199A933)
- ML20199A935 + (ML20199A935)
- ML20199A938 + (ML20199A938)
- ML20199A942 + (ML20199A942)
- IR 05000220/1997007 + (ML20199A945)
- ML20199A946 + (ML20199A946)
- ML20199A947 + (ML20199A947)
- IR 05000409/1997001 + (ML20199A950)
- ML20199A951 + (ML20199A951)
- BECO-LTR-97-110, Forwards Addendum to Rept of Changes,Tests & Experiments Performed at Pilgrim Nuclear Power Station for Period 960101-970421.Addendum Includes Remaining Items for Original Rept + (ML20199A952)
- ML20199A953 + (ML20199A953)
- ML20199A954 + (ML20199A954)