8 D
Novernbar 6,1997
^
MEMORANDUM TO: Thomas H. Essig, Acting Chief i
Generic lasues and Environmental Projects Branch 1
Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Melinda Malloy, Senior Reactor Engineer Original Signed By:
Generic lasues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF JULY 14,1997, MEETING WITH THE NUCLEAR INDUSTRY'S 4TH ANNUAL CONFIGURATION MANAGEMENT CONFERENCE On July 14,1997, David Matthews, Deputy Director of the Division of Reactor Program Management, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, met with attendees at the nuclear industry's 4th Annual Configuration Management -
Conference at the Embassy Suites Hotelin Chicago, Illinois.
Mr. Matthews spoke to the conference attendees on the state of configuration management in the nuclear industry from a regulatory perspective, with an emphasis on issues related to design bases and implementation of 10 CFR 50.59 (Changes, tests and experiments). His presentation slides are provided in the attachment.
Attachment:
Presentation Slides cc: Mr. Robert Renuart Chief, ConCguration Management and Engineering Assurance Commonwealth Edison Company 1400 Opus Place Downers Grove, IL 60515 5701 p/J38 Dittnbution:
Hard Copy (w/att.)
E-Mail (w/o att.)
Centrol F#es SCollins JRoe RSpessard
$)
PUBLIC FMiraglia DMatthews SRichards
' PGEB r/f --
BSheron TEssig WDean, DEDR MMalloy FGillespie FAkstulewicz TTMartin, AEOD
\\) M
_IT
' SMagruder RZimmerman MMalloy ACRS MLeach, Rlli Document Name: g:\\mxm\\MSUM0714J7
,)
I SC:PGEJ pRk (A)Q'MGEhDRPM OFFICE PGEB:DRPM NAME NMalh FAkstdhicz TlIAihM DATE 11/P /97 11/ b /97 11/h /b7 9711 90145 971106 OFFICIAL RECORD COPY ei
&; ty(, N PDR ORG NRRA PDR l((['lGll\\\\ll \\\\l\\\\\\\\l\\\\
Q gq
.audD u
November 6, 1997 L
MEMORANDUM TO: Thomas H. Essig, Acting Chief Generic losues and Environmental Projects Branch Division of Reactor Program Management 1
Office of Nuclear Reactor Regulation FROM:
Melinda Malloy, Senior Reactor Engineer Original Signed By:
Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF JULY 14,1997, MEETING WITH THE NUCLEAR INDUSTRY'S 4TH ANNUAL CONFIGURATION MANAGEMENT CONFERENCE On July 14,1997, David Matthews, Deputy Director of the Division of Reactor Program Management, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, met with attendees at the nuclear industry's 4th Annual Configuration Management Conference at the Embassy Suites Hotelin Chicago, Illinois.
Mr. Matthews spoke to the conference attendees on the state of configuration management in the nuclear industry from a regulatory perspective, with an emphasis on issues related to design bases and implementation of 10 CFR 50.59 (Chnnges, tests and experiments). His presentation slides are provided in the attachment.
Attachment:
Presentation Slides cc: Mr. Robert Renuart Chief, Configuration Management and Engineering Assurance Commonwealth Edison Company 1400 Opus Place Downers Grove, IL 60515-5701 Distribution:
Hard Coov (wlatt.)
E Map (w/o att )
Central Files SCollins JRoe RSpessard PUBLIC FMiraglia DMatthews SRichards PGEB r/f BSheron TEssig WDean, DEDR MMalloy FGillespie FAkstulewicz TTMartin, AEOD SMagruder RZimmerman MMalloy ACRS MLeach, Rlli Document Name: g:\\mxm\\MSUM0714 97 a
SC:PGEfpk (A)Q GEhRPM Y
OFFICE PGEB:DRPM NAME idNath FAkstalbez Thiigh DATE 11/:-
/97 11/ b /97 11/h /b7 OFFICIAL RECORD COPY
i a es;g ya
\\
UNITED STATES P
NUCLEAR REGULATORY COMMISSION
- j;'
WASHINGTON, D.C. 300M 'm01 i
's4*****,&
November 6, 1997 MEMORANDUM TO: Thomas H. Essig Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Melinda Malloy, Senior Reactor Engin.r Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF JULY 14,1997, MEETING WITH THE NUCLEAR INDUSTRY'S 4TH ANNUAL CONFIGURATION MANAGEMENT CONFERENCE On July 14,1997, David Matthews, Deputy Director of the Division of Reactor Program Management, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, met with attendees at the nuclear industry's 4th Annual Configuration Management Conference at the Embassy Suites Hotelin Chicago, Illinois.
Mr. Matthews spoke to the conference attendees on the state of configuration management in the nuclear industry from a regulatory perspective, with an emphasis on issues related to design bases and implementation of 10 CFR 50.59 (Changes, tests and experiments). His presentation slides are provided in the attachment.
Attachment:
Presentation Slides cc: Mr. Robert Renuart Chief, Configuration Management and Engineering Assurance Commonwealth Edison Company l
1400 Opus Place Downers Grove, IL 60515 5701
[
c
,#**'*oq,
%**+
REGULATORY ISSUES RELATED TO DESIGN BASES AND 10 CFR 50.59 l
l i
i 1
l Presentation to Configuration Management Conference l
July 14,1997 l
David B. Matthews, Chief l
Generic issues and Environmental Projects Branch Division of Reactor Program Management 4
Office of Nuclear Reactor Regulation
~
i l)
Attachment i
l!i:li!
,[l!Ii t!
,tl!ll i!r nee d
b e
d c
e s
u s
a d
a E
h e
e G E r
r 5
d c
e n
e A C 8
c e
d 9
u e
d R N 1
d b
e s
EA e
e s
a r
e a
h c
v e
VM n
n a
r e
e h
c r
AR is e
e u
Y O y
b s
d s
t n
o g
F e
e o
e p
n R
f v
v x
i R
a a
t i
1 T
s h
a a
e s
E u
h a
n e
S P a
s t
l s
o r
c U
n m
a n
t c
t i
D Y o
a e
a n
i m
v d
s i
i t
r N T a
c r
s e
e a
i E
e t
r F
p c
s t
y I
y n
e t
i i
o t
.A a
s a
v l
i S. S i
c t
b n
m y
if c
a o
t l
e i
U o
e n
ia l
s t
f l
g o
v u
u a
i c e A
S S
C A
v oi ft c Ce Rff Ne l1il1l:
lj!l!!i
- l ll l
i!
I
~
NRC SAFETY FOCUS l
4 l
i l
With increased focus on operational safety, by l
l 1990's, NRC reduced efforts evaluating adequacy, availability, and control of design and licensing bases information i
i In 1995, issues identified at several plants sparked l
concerns about the regulatory processes associated j
with design and licensing bases information Although few immediate safety concerns have been identified, identification of process concerns alters our confidence in overall industry performance i
l t
2 i
i
LESSONS-LEARNED REVIEW On November 30,1995, Commission requested i
lessons-learned review i
Review performed in two parts i
i Considered other ongoing efforts:
}
i Survey of refueling practices at all plants i
Review of Maine Yankee issues Inspections on FSAR compliance
{
Evaluation of implementation of 10 CFR 50.59 l
Csafety evaluation of proposed changes, tests, j
and experiments) l Re-emphasis on design-basis oversight activities i
i l
l l
3
l l
LESSONS-LEARNED REVIEW Report on Part 1 of review issued in
{
September.1996 i
Recommendations provided on licensing, inspection, i
enforcement, licensee reporting, management oversight l
Identified policy questions on design and licensing bases, FSARs,10 CFR 50.59 What information does NRC need to fulfill its 1
l regulatory responsibilities?
l 9
l j
i 4
l
l f.
LESSONS-LEARNED REVIEW Report on Part 2 of the review issued in February 1997 (SECY-97-036) 1 l
Staff actions developed from further examination of l
key policy questions l
t Staff proposed regulatory guidance on i
l implementation of 10 CFR 50.59 5 February 1997 (SECY-97-035), published as NUREG-1606 1
in May 1997 i
4 Staff advised Commission of need to consider the i
recommendations contained in the two SECY papers in an integrated fashion l
i l
i
\\
5 j
l NEAR TERM NRC PROGRAM CHANGES 1
Re-emphasis on design bases information in inspection activities Improvements to FSAR l
Improvements to regulatory processes to define l
licensing requirements i
l i
i i
1 I
?
I t
I s
4 i
6 i
I
l LONGER TERM NRC ACTIONS SECY-97-035 and SECY-97-036 discuss a number of regulatory issues and staff actans regarding l
knowledge of and control of changes to design j
bases and licensing basis information Staff has proposed a follow-on report to the l
l Commission which would integrate these issues, and actions to result in a effective strategy for l
l regulatory process improvements l
Commission recently provided preliminary views on l
the issues and actions and endorsed staff plans to l
submit integrated recommendations Follow-on " integration" paper due to Commission in j
September 1997 7
l'
-