Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A814 + (ML20199A814)
- ML20199A815 + (ML20199A815)
- 05000440/LER-1997-017, :on 970715,HPCS Suppression Pool Water level- High Logic Actuation Occurred.Caused by Incomplete Assessment of Suppression Pool Level Instrumentation Channels.Discussed Event W/Sros Involved + (ML20199A816)
- ML20199A817 + (ML20199A817)
- ML20199A821 + (ML20199A821)
- ML20199A822 + (ML20199A822)
- ML20199A823 + (ML20199A823)
- ML20199A824 + (ML20199A824)
- ML20199A825 + (ML20199A825)
- ML20199A827 + (ML20199A827)
- ML20199A829 + (ML20199A829)
- ML20199A831 + (ML20199A831)
- ML20199A832 + (ML20199A832)
- ML20199A833 + (ML20199A833)
- ML20199A834 + (ML20199A834)
- ML20199A836 + (ML20199A836)
- ML20199A837 + (ML20199A837)
- ML20199A838 + (ML20199A838)
- ML20199A844 + (ML20199A844)
- ML20199A845 + (ML20199A845)
- ML20199A846 + (ML20199A846)
- ML20199A847 + (ML20199A847)
- ML20199A848 + (ML20199A848)
- ML20199A849 + (ML20199A849)
- ML20199A850 + (ML20199A850)
- ML20199A852 + (ML20199A852)
- IR 05000346/1997014 + (ML20199A853)
- ML20199A855 + (ML20199A855)
- RBG-44352, Submits Response to Violations Noted in Insp Rept 50-458/97-15 & Payment of $55,000 for Proposed Civil Penalty.Corrective Actions:Condition Rept Generated to Document Event & Root Cause Analysis Team to Investigate + (ML20199A858)
- ML20199A864 + (ML20199A864)
- ML20199A868 + (ML20199A868)
- ML20199A869 + (ML20199A869)
- SVP-98-005, Forwards Response to Violations Noted in Insp Repts 50-254/97-14 & 50-265/97-14.CAs:on 970906,operations Directed Chemistry to Begin Sampling at 4 H Intervals & Implemented Measures to Ensure Hydrogen Grab Sample + (ML20199A870)
- ML20199A872 + (ML20199A872)
- ML20199A874 + (ML20199A874)
- NSD-NRC-98-5535, Forwards Revised Response to FSER Open Item 480.1084F Related to Comments on Passive Containment Cooling Sys from Containment Sys Branch Re Rev 3 of AP600 Certified Design Matl,Including ITAAC + (ML20199A875)
- ML20199A876 + (ML20199A876)
- ML20199A877 + (ML20199A877)
- ML20199A879 + (ML20199A879)
- ML20199A880 + (ML20199A880)
- IR 05000289/1985027 + (ML20199A881)
- ML20199A882 + (ML20199A882)
- ML20199A883 + (ML20199A883)
- ML20199A885 + (ML20199A885)
- ML20199A887 + (ML20199A887)
- ML20199A889 + (ML20199A889)
- ML20199A890 + (ML20199A890)
- ML20199A891 + (ML20199A891)
- 05000414/LER-1986-012-01, :on 860511,main Feedwater Sys Isolation Occurred.Caused by Main Feedwater Sys Control Bypass Valve Controller Card for Automatic Operation Being Out of Adjustment.Trip Reset.Valves Realigned + (ML20199A892)
- ML20199A893 + (ML20199A893)
- BVY-97-151, Requests That 970609 SER Re Exemption from Requirements of 10CFR50,App R,Section Iii.G,To Permit Use of Fireproof Cable in Plant Areas That Require Enclosing Cables in Fire Barrier Having 1-hour Fire Rating,Be Revised to Show Clarificatio + (ML20199A894)