Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A042 + (ML20199A042)
- 05000440/LER-1997-013, :on 971009,control Rod Drive Hydraulic Sys Maintenance Activities Resulted in Reactor Protection Sys Actuation.Caused by Personnel Error.Sro Responsible for Clearance of Tagout Was Counseled + (ML20199A044)
- ML20199A045 + (ML20199A045)
- B16958, Forwards Util Response to Recommendations Made by Little Harbor Consultants,Inc Re Employee Concerns Program.Encl Table Identifies Actions Committed by Util + (ML20199A046)
- ML20199A047 + (ML20199A047)
- ML20199A048 + (ML20199A048)
- ML20199A049 + (ML20199A049)
- BECO-LTR-97-108, Forwards 1996 Annual Rept,Form 10-Q for Quarter Ended Sept 1996 as Filed W/Securities & Exchange Commission,Cash Flow Forecast for 1998 & Narrative Statement of Curtailment of Capital Expenditures + (ML20199A051)
- ML20199A054 + (ML20199A054)
- ML20199A058 + (ML20199A058)
- ML20199A060 + (ML20199A060)
- 05000373/LER-1997-045, :on 971223,PAMS Instrumentation Was Noted Outside Design Basis.Caused by Personnel Error.Revised EQ Life Calculation for Affected Components + (ML20199A061)
- ML20199A064 + (ML20199A064)
- ML20199A067 + (ML20199A067)
- ML20199A069 + (ML20199A069)
- 0CAN019802, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/97-18 & 50-368/97-18.Corrective actions:50.59 Evaluation for Rev 8 to 1000.120, ANO Fire Watch Program, Was Approved by ANO Plant Safety Committee on 971209 + (ML20199A070)
- ML20199A073 + (ML20199A073)
- 05000321/LER-1997-005-03, :on 971014,control Rod Partially Withdrawn W/O Pressure in Scram Accumulator,Occurred.Caused by Personnel Error.Individuals Involved Counselled,Out of Svc HCUs Tagged Out & Inoperable HCUs Disabled + (ML20199A074)
- ML20199A078 + (ML20199A078)
- NSD-NRC-98-5533, Forwards Correspondence Previously Sent Informally Over Period 971027-980108 + (ML20199A082)
- ML20199A083 + (ML20199A083)
- ML20199A084 + (ML20199A084)
- ML20199A085 + (ML20199A085)
- ML20199A088 + (ML20199A088)
- ML20199A090 + (ML20199A090)
- ML20199A092 + (ML20199A092)
- ML20199A094 + (ML20199A094)
- 05000282/LER-1997-012-01, :on 971009,chemical & Volume Control Sys Malfunction,Occurred.Caused by Failure to Recognize Shutdown Margin Requirements in Usar.Procedures Modified to Maintain Increased Shutdown Margin + (ML20199A096)
- ML20199A099 + (ML20199A099)
- ML20199A100 + (ML20199A100)
- ML20199A102 + (ML20199A102)
- ML20199A103 + (ML20199A103)
- ML20199A104 + (ML20199A104)
- ML20199A108 + (ML20199A108)
- ML20199A109 + (ML20199A109)
- ML20199A110 + (ML20199A110)
- ML20199A111 + (ML20199A111)
- ML20199A113 + (ML20199A113)
- ML20199A114 + (ML20199A114)
- 05000424/LER-1997-008-02, :on 971011,noted That Turbine Stop Valves Closure Setpoints Were Not Properly Set.Caused by Procedure Inadequacy.Readjusted Limit Switches Utilizing Methodology of Adjusting Trip Setpoint While Valve Closes + (ML20199A115)
- ML20199A117 + (ML20199A117)
- LR-N970814, Forwards Proposed Rev 11 to Security Plan & Proposed Rev 4 to Training & Qualifications Plan for Plants.Plan Withheld + (ML20199A120)
- ML20199A123 + (ML20199A123)
- ML20199A124 + (ML20199A124)
- ML20199A125 + (ML20199A125)
- ML20199A126 + (ML20199A126)
- ML20199A129 + (ML20199A129)
- IR 05000440/1997017 + (ML20199A130)
- ML20199A131 + (ML20199A131)
- BVY-97-148, Documents Request for Extension of 60 Days to Respond to NRCs Rai,Dtd 971007,which Resulted from Staff Review of Utils Proposed TS Change 185,dtd 960911.Addl Time Is Necessary Due to Scope of RAI + (ML20199A132)
- ML20199A135 + (ML20199A135)