Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199A033 + (ML20199A033)
- ML20199A036 + (ML20199A036)
- ML20199A040 + (ML20199A040)
- B16783, Provides NNECO Response to Clarifications of Info Communicated by Little Harbor Consultants,Inc During 970722 Meeting.Listed Commitments Contained within Ltr + (ML20199A041)
- ML20199A042 + (ML20199A042)
- 05000440/LER-1997-013, :on 971009,control Rod Drive Hydraulic Sys Maintenance Activities Resulted in Reactor Protection Sys Actuation.Caused by Personnel Error.Sro Responsible for Clearance of Tagout Was Counseled + (ML20199A044)
- ML20199A045 + (ML20199A045)
- B16958, Forwards Util Response to Recommendations Made by Little Harbor Consultants,Inc Re Employee Concerns Program.Encl Table Identifies Actions Committed by Util + (ML20199A046)
- ML20199A047 + (ML20199A047)
- ML20199A048 + (ML20199A048)
- ML20199A049 + (ML20199A049)
- BECO-LTR-97-108, Forwards 1996 Annual Rept,Form 10-Q for Quarter Ended Sept 1996 as Filed W/Securities & Exchange Commission,Cash Flow Forecast for 1998 & Narrative Statement of Curtailment of Capital Expenditures + (ML20199A051)
- ML20199A054 + (ML20199A054)
- ML20199A058 + (ML20199A058)
- ML20199A060 + (ML20199A060)
- 05000373/LER-1997-045, :on 971223,PAMS Instrumentation Was Noted Outside Design Basis.Caused by Personnel Error.Revised EQ Life Calculation for Affected Components + (ML20199A061)
- ML20199A064 + (ML20199A064)
- ML20199A067 + (ML20199A067)
- ML20199A069 + (ML20199A069)
- 0CAN019802, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/97-18 & 50-368/97-18.Corrective actions:50.59 Evaluation for Rev 8 to 1000.120, ANO Fire Watch Program, Was Approved by ANO Plant Safety Committee on 971209 + (ML20199A070)
- ML20199A073 + (ML20199A073)
- 05000321/LER-1997-005-03, :on 971014,control Rod Partially Withdrawn W/O Pressure in Scram Accumulator,Occurred.Caused by Personnel Error.Individuals Involved Counselled,Out of Svc HCUs Tagged Out & Inoperable HCUs Disabled + (ML20199A074)
- ML20199A078 + (ML20199A078)
- NSD-NRC-98-5533, Forwards Correspondence Previously Sent Informally Over Period 971027-980108 + (ML20199A082)
- ML20199A083 + (ML20199A083)
- ML20199A084 + (ML20199A084)
- ML20199A085 + (ML20199A085)
- ML20199A088 + (ML20199A088)
- ML20199A090 + (ML20199A090)
- ML20199A092 + (ML20199A092)
- ML20199A094 + (ML20199A094)
- 05000282/LER-1997-012-01, :on 971009,chemical & Volume Control Sys Malfunction,Occurred.Caused by Failure to Recognize Shutdown Margin Requirements in Usar.Procedures Modified to Maintain Increased Shutdown Margin + (ML20199A096)
- ML20199A099 + (ML20199A099)
- ML20199A100 + (ML20199A100)
- ML20199A102 + (ML20199A102)
- ML20199A103 + (ML20199A103)
- ML20199A104 + (ML20199A104)
- ML20199A108 + (ML20199A108)
- ML20199A109 + (ML20199A109)
- ML20199A110 + (ML20199A110)
- ML20199A111 + (ML20199A111)
- ML20199A113 + (ML20199A113)
- ML20199A114 + (ML20199A114)
- 05000424/LER-1997-008-02, :on 971011,noted That Turbine Stop Valves Closure Setpoints Were Not Properly Set.Caused by Procedure Inadequacy.Readjusted Limit Switches Utilizing Methodology of Adjusting Trip Setpoint While Valve Closes + (ML20199A115)
- ML20199A117 + (ML20199A117)
- LR-N970814, Forwards Proposed Rev 11 to Security Plan & Proposed Rev 4 to Training & Qualifications Plan for Plants.Plan Withheld + (ML20199A120)
- ML20199A123 + (ML20199A123)
- ML20199A124 + (ML20199A124)
- ML20199A125 + (ML20199A125)
- ML20199A126 + (ML20199A126)
- ML20199A129 + (ML20199A129)