Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198T525 + (ML20198T525)
- ML20198T530 + (ML20198T530)
- 3F0198-15, Provides Response to RAI Dtd 971209,re LAR 218 Concerning Rev of Makeup Sys Letdown Line Failure Accident Analysis + (ML20198T532)
- ML20198T534 + (ML20198T534)
- B16767, Documents Util Response to NRC Request for Addl Info Re Unit 3 EDG Exhaust Stack.Expected Results of Addl Analyses Will Be Forwarded to NRC by 980215.Rev 1 to Calculation NUC-176 Encl + (ML20198T536)
- ML20198T537 + (ML20198T537)
- ML20199A001 + (ML20199A001)
- ML20199A003 + (ML20199A003)
- ML20199A005 + (ML20199A005)
- 05000302/LER-1997-035, :on 971016,discovered Inability to Provide RCS Inventory Makeup During Postulated App R Event.Caused by Design Error.Will Provide Alternate Means of Restoring Power to HPI Valves & Will Revise Procedures & Design Drawings + (ML20199A006)
- ML20199A008 + (ML20199A008)
- ML20199A010 + (ML20199A010)
- ML20199A011 + (ML20199A011)
- ML20199A013 + (ML20199A013)
- ML20199A016 + (ML20199A016)
- ML20199A017 + (ML20199A017)
- ML20199A018 + (ML20199A018)
- ML20199A019 + (ML20199A019)
- ML20199A020 + (ML20199A020)
- LIC-97-0158, Forwards Public Version of Revs to Radiological Emergency Plan & EPIPs.W/971112 Release Memo + (ML20199A023)
- ML20199A024 + (ML20199A024)
- ML20199A025 + (ML20199A025)
- ML20199A026 + (ML20199A026)
- ML20199A030 + (ML20199A030)
- ML20199A031 + (ML20199A031)
- ML20199A033 + (ML20199A033)
- ML20199A036 + (ML20199A036)
- ML20199A040 + (ML20199A040)
- B16783, Provides NNECO Response to Clarifications of Info Communicated by Little Harbor Consultants,Inc During 970722 Meeting.Listed Commitments Contained within Ltr + (ML20199A041)
- ML20199A042 + (ML20199A042)
- 05000440/LER-1997-013, :on 971009,control Rod Drive Hydraulic Sys Maintenance Activities Resulted in Reactor Protection Sys Actuation.Caused by Personnel Error.Sro Responsible for Clearance of Tagout Was Counseled + (ML20199A044)
- ML20199A045 + (ML20199A045)
- B16958, Forwards Util Response to Recommendations Made by Little Harbor Consultants,Inc Re Employee Concerns Program.Encl Table Identifies Actions Committed by Util + (ML20199A046)
- ML20199A047 + (ML20199A047)
- ML20199A048 + (ML20199A048)
- ML20199A049 + (ML20199A049)
- BECO-LTR-97-108, Forwards 1996 Annual Rept,Form 10-Q for Quarter Ended Sept 1996 as Filed W/Securities & Exchange Commission,Cash Flow Forecast for 1998 & Narrative Statement of Curtailment of Capital Expenditures + (ML20199A051)
- ML20199A054 + (ML20199A054)
- ML20199A058 + (ML20199A058)
- ML20199A060 + (ML20199A060)
- 05000373/LER-1997-045, :on 971223,PAMS Instrumentation Was Noted Outside Design Basis.Caused by Personnel Error.Revised EQ Life Calculation for Affected Components + (ML20199A061)
- ML20199A064 + (ML20199A064)
- ML20199A067 + (ML20199A067)
- ML20199A069 + (ML20199A069)
- 0CAN019802, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/97-18 & 50-368/97-18.Corrective actions:50.59 Evaluation for Rev 8 to 1000.120, ANO Fire Watch Program, Was Approved by ANO Plant Safety Committee on 971209 + (ML20199A070)
- ML20199A073 + (ML20199A073)
- 05000321/LER-1997-005-03, :on 971014,control Rod Partially Withdrawn W/O Pressure in Scram Accumulator,Occurred.Caused by Personnel Error.Individuals Involved Counselled,Out of Svc HCUs Tagged Out & Inoperable HCUs Disabled + (ML20199A074)
- ML20199A078 + (ML20199A078)
- NSD-NRC-98-5533, Forwards Correspondence Previously Sent Informally Over Period 971027-980108 + (ML20199A082)
- ML20199A083 + (ML20199A083)
- ML20199A084 + (ML20199A084)