Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P401 + (ML20198P401)
- ML20198P407 + (ML20198P407)
- ML20198P408 + (ML20198P408)
- ML20198P409 + (ML20198P409)
- ML20198P412 + (ML20198P412)
- ML20198P414 + (ML20198P414)
- ML20198P415 + (ML20198P415)
- ML20198P417 + (ML20198P417)
- 05000249/LER-1986-004-07, :on 860501,weekly Continuous Particulate Filter Sample from Ventilation Sampling Sys Found Broken.Possibly Caused by Personnel Error.Technicians Will Be Retrained Re Filter Handling & Gas Sampling + (ML20198P419)
- ML20198P425 + (ML20198P425)
- ML20198P432 + (ML20198P432)
- ML20198P434 + (ML20198P434)
- ML20198P435 + (ML20198P435)
- ML20198P436 + (ML20198P436)
- ML20198P443 + (ML20198P443)
- ML20198P445 + (ML20198P445)
- ML20198P449 + (ML20198P449)
- 05000346/LER-1997-013, :on 971002,potential Condition Adverse to Quality Rept Documented Failure to Perform Surveillance Test Before TS Surveillance Late Date.Caused by Administrative Error.Missed Surveillance Completed + (ML20198P450)
- ML20198P456 + (ML20198P456)
- ML20198P460 + (ML20198P460)
- ML20198P461 + (ML20198P461)
- ML20198P462 + (ML20198P462)
- ML20198P466 + (ML20198P466)
- BVY-98-171, Submits Annual 10CFR50.46(a)(3)(ii) Rept for 1998,re Changes in Peak Cladding Temp (PCT) for ECCS LOCA Analysis + (ML20198P467)
- ML20198P469 + (ML20198P469)
- ML20198P470 + (ML20198P470)
- ML20198P471 + (ML20198P471)
- BSEP-97-0477, Forwards Revised Core Shroud Insp Plan,Including Addl Info Requested by NRC During 970915 Telcon + (ML20198P474)
- ML20198P476 + (ML20198P476)
- ML20198P477 + (ML20198P477)
- ML20198P483 + (ML20198P483)
- ML20198P484 + (ML20198P484)
- NRC-95-4581, Forwards Nonproprietary Rev 1 to WCAP-14113, ADS Test Specification + (ML20198P486)
- ML20198P487 + (ML20198P487)
- ML20198P488 + (ML20198P488)
- ML20198P490 + (ML20198P490)
- ML20198P495 + (ML20198P495)
- ML20198P497 + (ML20198P497)
- ML20198P498 + (ML20198P498)
- ML20198P500 + (ML20198P500)
- ML20198P503 + (ML20198P503)
- ML20198P507 + (ML20198P507)
- BVY-97-144, Reaffirms Util Intention to Perform Listed Tasks in Support of GL 89-10, MOV Testing & Surveillance, as Verbally Conveyed to NRC at Closure Insp Exit Meeting Held at VYNPS on 971017 + (ML20198P508)
- ML20198P510 + (ML20198P510)
- ML20198P512 + (ML20198P512)
- ML20198P514 + (ML20198P514)
- ML20198P517 + (ML20198P517)
- ML20198P518 + (ML20198P518)
- BSEP-97-0480, Requests Approval to Use ASME Section XI Code Case N-547 as Alternative to ASME Boiler & Pressure Vessel Code Requirements for ASME Code Class 1,2,3 Components,Including Supports.Basis for Request & Commitments Provided + (ML20198P523)
- ML20198P526 + (ML20198P526)
- IR 07100031/2012006 + (ML20198P527)