Provides Response to 971210 RAI for 970902 LAR Re Auxiliary Feedwater Sys.Attachment 1 Provides Response to Specific Questions Provided in .Attachment 2 Provides Replacement Pages,Clarifying Bases for 970902 LAR
ML20198P495
Person / Time
Site: Wolf Creek 
Issue date: 01/15/1998
From: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198P499 List:
References
WM-98-0001, WM-98-1, NUDOCS 9801220135
Download: ML20198P495 (5)


Text

__. _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _ - -

4 I

LF CREEK W@ NUCLEAR OPERATING COR Otto L Maynard President and Chief Executive Offcer January 15, 1998 WM 98-0001 U. S. Nuclear Regulatory Commission ATTN Document Centrol Desk Mail Station Pl-l'*7 Washington, D. C. 20555

Reference:

1. Letter ET 97-0050, dated May 15, 1997, from R. A. Muench, WCNOC to NRC
2. Letter ET 97-0075, dated September 2, 1997 from R. A. Muench, WCNOC to NRC
3. Letter dated December 10, 1997, from K. M. Thomas, NRC-to
0. L. Maynard, WCNOC

Subject:

Docket No.

50-482:

Response to Request for Additional Information on Auxiliary Feedwater System License Amendmert Request Gentlemen This letter provid+.s Wolf Creek Nuclear Operating Corporations response to the 7

Nuclear Regulatory Commissions request for additional information (Reference

3) for the license amendment request (Reference 2) pertaining to the Auxiliary Feedwater System. provides WCNOC's response to the specific questions provided in Reference 3. provides replacement pages to Reference 2.

The changes in Attachment 2'are being made to clarify the Bases.

In accordance with 10 CFR 50.91, a copy of this submittal, with attachments, is being provided to the designated Kansas State Official.

If you have any questions concerning this matter, please con.act me at (316) 364-8831, extension 4000, or Mr. Michael J. Angus, at extension 4077 Very truly yours, Otto L. Maynard 0111/f ad

,']

y Attachments y

cet V. L. Cooper (KDHE), W/a f

W. D. Johnson (NRC), w/a E. W. Merschoff (NRC), w/a f.]..'['(.

J.

F. Ringwald (NRC), w/a

.K. M. Thomas (NRC), w/a 9801220135 980115 PDft ADOCK 0500 2

P PO, Box 411/ Burbngton, KS S6839 / Phone (316) 3644831 An Equal Oppotturwty Eng*)yn, u r HOVE 1

. 4 4

STATE Or RANSAS

)

)-

Es courTr nr.corray-

)

Otto L. Maynard,'c,f lawful age, being first duly-sworn upon oath says that he

- is President and Chief Executive Officer of. Wolf - Creek Nuclear Operating Corporations. that he has read the f oregoing. document and knows' the, content thereof;- that he has executed that same for and.on behalf of said Corporation-

- with full power and authority-to do so; and that the facts therein stated are true and correct-to the best of his kncwledge,-information and belief.

W1. 0 ny (11/ / /

F111 Otto"L.' Tay6ard

[-

President and Chief Executive officer SUBSCRIBED and sworn to before me this

/50 day of Ja-3 1996.

, & {n.C% i LINDA M. OHMIE R4tary Public J

Notary Pubic. State of Kansas s -

[wwi tow..

g.Jl.9g Expiration Date J-3l -98 T

.a d

?

f i m

I 1.

1

-c to WM 90-0001 Page 1 of 3 J

. Response to Request for Additional Inforestion Pertaining to the Auxiliary

)

Feedwater (AMf) Systee Technical Specification Amendeent.

{

l Question 1 4

Define the physical beginning and end of the ESW

  • supply" or "flowpath" to the

!~

turbine-drf'in auxiliary feedwater (TDA W) pump _that would apply under the 7-day allow [ed outage time (A07).

Response

1 For' the purposes of Technical Specification 3.7.1.2 Action b.,

the Essential l

~

Service Water (ESW) supply flow path to the turbine _ driven AFW _ pump is considered the piping and components from the branch connection (to the motor-1-

, _ driven AW pump) to the auction of the turbine-driven AFW pump.

Figure 1 provides a schematic of the system with the ESW supply flow path " clouded."

The'ESW-supply flow path to *be turbine-driven AFW pump includes the piping upstreem of-the suction isolation - valves (ALHV-32 or ALHV-33) because there

.may be a need to install a freeze seal to allow maintenance on the valve in the event of a mechanical problem.

Question 2:

In the background section, "ESW Flow Path Required Action," of Attachment I, WCGS justifies the 7-day A0T, in part, because of the remaining operable motor-driven - (HD) AFW pump.

This statement. refers to a singular MDAW pump, not.to two pumps.

If one E7M supply to the TDAFW pump is inoperable, is the

' associated MDAFW pump operable or inoperable?

If the ESW supply to the MDAFW pump la inoperable, explain why the AOT should not be 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> due to one inoperable A W train.

Response

The i_noperability of a single ESW supply flow path to the turbine driven AFW pump -(as defined above) causes a loss of redundancy in ESW supply to the turbine-driven AFW pump but does not render the turbine-driven AFW pump or the motor-driven A W pump inoperable.

Therefore, the allowed outage time is not required to be 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> since one AFW train is not inoperable.

With one ESW train (consisting of a self cleaning strainer, prelube tank, one 100% capacity pump, piping, valving, and instrumentation) inoperable,. the associated motor-driven AFW train is considered inoperable and_one ESW supply

' flow path to the; turbine-driven AFW pump is considered inoperable.

With one ESW train inoperable, Technical Specification 3.7.4, 3.7.1.2 Action a and

-proposed Action b would be entered. The turbine-driven AFW pump and one motor-L dr.iven ATW pump is OPERABLE based on the remaining OPERADLE-ESW train.

_ Additional changes are being provided in Attachment 2 to reflect-this clarification.

. Question 3:

In SectionLBL3.7 3.C.1 of Attachment V,.WCGS proposes, in part,x to change the TS" Bases to' state that one inoperable A W train includes the loss ofLtwo ESW

-; supply lines-to:the.TDAF5' pump.

From1this statement, ona concludes that if the two'ESW supply 11ines are -lost,to the' TDAFW pump, W h MDAFW pumps are Lunaffected and can; provide the required amount of ESW to the steam generators.

Is?thi_s conclusion correct?-

If:not, please provide clarification.

If so,

how does WCGS ensure.that the-inoperable ESW supply to the TDA W pump does not t

1 affect the ESW supply to the MDA W pumps?

n k

Attachment I to WM 98-0001 Page 2 of 3 f

4

Response

At toc' fne nt V of Reference 2 prooosed changts to the Improved Tec'r*;al Specifications (ITS) that were submitted by Reference 1.

The ITS Bases for ACTION C.1 are reviseu to indicate that ACTION C.1 would te entered if two ESW cupply lines (flow path) to the turbine-driven Art pump were inoperable.

As discussed above in the Response to Question 2, 11 the inoperability applies only to the ESW supply lines l flow path), the motor-driven AFW pumps would be uncffected and capable of supplying 100 percent of the feedwater flow required for removal of decay heat.

The piping from the branch connection (to the motor-driven AFW pump) to the suction of the AFW pumps is equipped with a motor-3perated bettecfly valve, an isolation valve, and a check valve.

From an OPERABILITY standpoint, the motor-operated suction isolation valves (ALHV-32 or ALHV-33) for the turbine-driven AFW pump are of most concern and do not af focc ihe OPERABILITY of the motor-driven AFW trains.

Additional changes are be i..

ovided in Attachment II to reflect this clarification

)

5

. to WM 99-0001 Page 3 of 3 AL.HV.34 MOTOR b

X

)

)

To Steam Generators A & D B TRAIN

((

ESSEWTIAL 16-y 1

SERVICE fj gg,gy,3g WATIR T5 GPM i

A TRAltJ

[

((

ESSENTIAL 16-

)

'f

))

Gemple LERVtCE WATER Ag.gy,31

'Y I

s-d '

15 GPM l'

\\

l AL-HV 35 MOTOR i

PUMP A 500 GPM

@I N

rC>Q-- ---4

)

s I

To Steam l

Generators B & C g

,,. ' I' MAIN MAIN l

i PTEAM STEAM C

6

  • ^*

c i

{

AB4f'.!****;

{ * * * * ] AB-Hy.

I I

49

  • FO
  • 48 AB Hv.5 F8 T

., F S i.

i....,

n Hv-32

$7"$

Fc.Hv.

+%AJ!

C~ LsP%

10

' (CSTw rc.Hv-y

$ %< 3; w -5 k w,3 2

~ s 3

- -Q_f wM m ;) w*,*g;;

4.m.

N

>4-T~ ~)

v a

,....c-.-.

1=< p-A...c. D RECIRCULATION Piqure 1

m 9

Replacement Pages to Reference 2

\\

1 E

[*1 4:

_