_q N i;;
y r
-7 January.14, 1998 m
l Mr. Richard R. Grigg, President and '
a Chief Operating Officer.
Wisconsin Electric Power Companyj j
a 231 W. Michigan --
Milwaukee,WI 53201-i
SUBJECT:
COMPLETION OF THE NRC OVERSIGHT PANEL FOR POINT BEACH -
]
'I
Dear Mr. Grigg:
a Irra letter I sent to you dated February 12,1997, I announced the formation of an NRC.
. Oversight Panel to closely monitor implementation of Wisconsin Electr!c's extensive i
- performance improvement initiatives. This panel consisted of senior NRC managers and; stechnical staff from Region lll and the Office of Nuclear Regulation. The activities of the panel f were based on the Oversight Plan documented in that letter, and supported by extensive 1 p
t routine and special team inspections. The ststus of the Oversight Panel's assessment of Point -
1 Beach progress on its improvement initiatives was discussed during several public meetings -
between the Panel and Point Beach management.
? Our review has'shown that adequate progress has been made on the Point Beach Improvement initiatives. The successful and generally event-free restart of Unit 2 in August a
i 1997 and Unit 1 in November 1997 gave us further confidence that the initiatives have resulted -
in performance improvement. Based on these results, I have decided that the additional NRC 4
management oversight provided by the Oversight Panel is no longer needed. _We understand 4
your continuing commitment to the implementation of improvement initiatives and we will
- closely monitor those activities at the Point Beach facility.
l t
Sincerely, q
original signed by A. B. Beach A. Bill Beach Regional Administrator Docket No. 50-266 Docket No.. 50-301 JGee Attached Distribution l
i e
' DOCUMENT NAME:. G:DRS POIO1148.LTR-
- To seceive e ao py of thle documegt, Indleate in the bou "C'
- Copy wIo attach /end "E" = Co w w/ attach /enci T = No copy OFFICE - Rlli:DRP a C-Rill:DRP:
Rlli:DRS L r4 RllfBAO
-l E
NAME '
McCormiM c' Grant c 30, Grobe(JC Befah-l.
m DATE= 1 1/lW98 '
ill f/98 0 /f 1/W98 l 1/14/9 8 L
LOFFICIAL RECORD COPY:
i b
- R.~ Grigg 2
January:14, 1998 cc:
S.' A. Patuiski Site Vice President' A. J. Cayla, Plant Manager B. D. Burks, P.E., Director Bureau of h.!d Operations Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer Distribution
- Docket File -
Rlli PRR
' Rlli Enf. Coordinator t PUBLIC IE-01 SRI, Pt. Beach -
TSS LPM,NRR J. L. Caldwell, Rill DOCDESK DRP A. B. Beach, Rlli CAA1 DRS 4
4 4
M
,