Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198M190 + (ML20198M190)
- 05000409/LER-1986-015, :on 860506,while Reactor Shut Down,Spike Occurred on Nuclear Instrumentation Channel 6,generating Scram Signal.Caused by Burned Out Filament in Tube in Positive High Voltage Power Supply + (ML20198M192)
- ML20198M193 + (ML20198M193)
- ML20198M194 + (ML20198M194)
- ML20198M196 + (ML20198M196)
- ML20198M197 + (ML20198M197)
- ML20198M199 + (ML20198M199)
- ML20198M200 + (ML20198M200)
- ML20198M202 + (ML20198M202)
- ML20198M203 + (ML20198M203)
- ML20198M205 + (ML20198M205)
- ML20198M207 + (ML20198M207)
- NG-98-0017, Monthly Operating Rept for Dec 1997 for Duane Arnold Energy Center + (ML20198M209)
- ML20198M210 + (ML20198M210)
- 05000302/LER-1986-006, :on 860428,failure to Perform Containment Isolation Valve Leak Rate Test During 1985 Refueling Outage Discovered.Caused by Procedural Inadequacy.Valve Retested on 860514 & Leak Rate Test Procedure Revised + (ML20198M211)
- ML20198M212 + (ML20198M212)
- NPL-98-0020, Forwards Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2.Corrected Units 1 & 2 Operating Data Rept Sheets & Unit 2 Average Daily Power Level Summary Sheet for Nov 1997,also Encl + (ML20198M213)
- ML20198M214 + (ML20198M214)
- 05000219/LER-1986-009-01, :on 860501,full Scram Signal Received Due to Electronic Noise Induced Spikes on intermediate-range Monitors.Cause Unknown.Investigation Continuing + (ML20198M215)
- ML20198M217 + (ML20198M217)
- ML20198M219 + (ML20198M219)
- ML20198M221 + (ML20198M221)
- IA-97-358, Notice of Workshop Re 10CFR35, Medical Use of Byproduct Matl + (ML20198M223)
- ML20198M223 + (ML20198M223)
- ML20198M225 + (ML20198M225)
- ML20198M226 + (ML20198M226)
- ML20198M230 + (ML20198M230)
- ML20198M231 + (ML20198M231)
- ML20198M233 + (ML20198M233)
- ML20198M236 + (ML20198M236)
- 05000254/LER-1986-022, :on 860501,containment Atmosphere Monitoring Sys Piping Lines Found Not Meeting NUREG-0661 Acceptance Criteria.Caused by Preservice Design Error.Action Item Record 4-85-10 Issued + (ML20198M239)
- ML20198M240 + (ML20198M240)
- ML20198M244 + (ML20198M244)
- ML20198M245 + (ML20198M245)
- ML20198M248 + (ML20198M248)
- ML20198M249 + (ML20198M249)
- B16070, Provides Staff Update on Status of GL 89-13 Implementation, Including Discussion of Five Recommended Actions.Actions Util Taken to Date & Actions Which Util Will Perform Before GL 89-13 Considered Complete for Unit 1 + (ML20198M254)
- ML20198M257 + (ML20198M257)
- ML20198M260 + (ML20198M260)
- ML20198M262 + (ML20198M262)
- ML20198M263 + (ML20198M263)
- ML20198M267 + (ML20198M267)
- ML20198M269 + (ML20198M269)
- ML20198M275 + (ML20198M275)
- ML20198M276 + (ML20198M276)
- ML20198M280 + (ML20198M280)
- ULNRC-03667, Provides Util Responses to Questions & Requested Documentation Re Associated Waterhammer & two-phase Flow Analyses.W/O Encls + (ML20198M286)
- ML20198M287 + (ML20198M287)
- ML20198M288 + (ML20198M288)
- ML20198M292 + (ML20198M292)
- ML20198M293 + (ML20198M293)