Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198E436 + (ML20198E436)
- ML20198E437 + (ML20198E437)
- IR 05000443/1986009 + (ML20198E440)
- ML20198E443 + (ML20198E443)
- ML20198E444 + (ML20198E444)
- ML20198E445 + (ML20198E445)
- ML20198E446 + (ML20198E446)
- ML20198E447 + (ML20198E447)
- RBG-23672, Special Rept:On 860418,invalid Failure Involving Receipt of Trip Indications Experienced on Div I Diesel Generator During Surveillance Testing.Caused by Stuck Relays in Diesel Generator Pneumatic Control Logic + (ML20198E448)
- ML20198E449 + (ML20198E449)
- TXX-4805, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.All Electrical Raceway Items Consolidated.Next Rept by 861021 + (ML20198E450)
- ML20198E452 + (ML20198E452)
- ML20198E453 + (ML20198E453)
- ML20198E454 + (ML20198E454)
- NPL-98-1041, Equipment Qualification Engineering Evaluation + (ML20198E455)
- ML20198E457 + (ML20198E457)
- ML20198E458 + (ML20198E458)
- ML20198E459 + (ML20198E459)
- ML20198E461 + (ML20198E461)
- ML20198E463 + (ML20198E463)
- ML20198E464 + (ML20198E464)
- ML20198E469 + (ML20198E469)
- ML20198E470 + (ML20198E470)
- ML20198E471 + (ML20198E471)
- IR 05000309/1985029 + (ML20198E472)
- ML20198E474 + (ML20198E474)
- ML20198E475 + (ML20198E475)
- ML20198E477 + (ML20198E477)
- ML20198E478 + (ML20198E478)
- ML20198E479 + (ML20198E479)
- TXX-4804, Interim Deficiency Rept CP-85-19 Re Nonrepresentative Sample Used in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 850515.Next Rept by 861021 + (ML20198E484)
- ML20198E486 + (ML20198E486)
- RBG-44769, Submits Final License Examination Matl for Feb 1999,license Examination for Rbs.Without Attachments + (ML20198E490)
- 05000528/LER-1986-029, :on 860422,surveillance Test of Pressurized Heater Capacity Incorrectly Performed Due to Procedural Deficiency.Caused by Personnel Error & Incorrect Calculation Method Specified in Procedures + (ML20198E491)
- ML20198E496 + (ML20198E496)
- ML20198E498 + (ML20198E498)
- ML20198E499 + (ML20198E499)
- U-600288, Emergency Response Facilities Design Rept + (ML20198E502)
- 05000309/LER-1986-002, :on 851106 & 860417,automatic Reactor Trip on Loss of Load Occurred Due to Main Turbine Trip on High Steam Generator Level.Caused by Controller Malfunction & Faulty Potentiometer.Controller Replaced + (ML20198E503)
- 05000302/LER-1997-044, :on 971209,breaker Trip Setpoint Resulted in Deenergizing of Sre.Caused by Inadequate Setpoint Criteria. Revised Electrical Design Criteria for CR-3 + (ML20198E506)
- ML20198E508 + (ML20198E508)
- TXX-4806, Interim Deficiency Rept CP-85-42 Re Possible Adverse Effects of Substituting Rectangular & Oversized Preformed Sections of Thermolag on Conduit Support Design Installations. Initially Reported on 850920 + (ML20198E509)
- IR 05000423/1986012 + (ML20198E511)
- NUREG/CR-5549, Forwards NUREG/CR-5549, Environmental Assessment Renewal of Materials Licenses for Alaron Corp Northeast Regional Service Facility,Wampum,Pa, for Placement Into Nudocs + (ML20198E514)
- PNO-II-98-001, on 980106,licensee Reported to Fl Bureau of Radiological Health That Troxler,Model 3430,moisture Density Gauge Stolen from Licensee pick-up Truck.State Will Require Licensee to Issue Press Release + (ML20198E517)
- RBG-44783, Provides Entergy Operations,Inc Input as Discussed in Call, for Consideration by NRC in Enforcement Process Re Insp Rept 50-458/98-13 + (ML20198E519)
- TXX-4808, Interim Deficiency Rept CP-84-12 Re Impact of high-energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Thermal Analysis Completed & Operability of Equipment Under Review.Next Rept by 860716 + (ML20198E521)
- ML20198E523 + (ML20198E523)
- ML20198E524 + (ML20198E524)
- 05000395/LER-1986-007, :on 860422,reactor Bldg Space Spray Pump B Inadvertently Started.Cause Not Determined.Spray Pump Discharge Valve Remained Closed & No Flow Introduced Into Reactor Bldg + (ML20198E525)
- ML20198E528 + (ML20198E528)