Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198E396 + (ML20198E396)
- VPN-080-98, Forwards Updated ISFSI Emergency Plan,Per 981123 & Discussion in Meeting with NRC on 981119.Description of Changes Encl + (ML20198E398)
- IR 05000245/1986008 + (ML20198E399)
- ML20198E402 + (ML20198E402)
- ML20198E409 + (ML20198E409)
- ML20198E411 + (ML20198E411)
- ML20198E418 + (ML20198E418)
- 3F0586-22, Confirms 860519 Telcon Re Emergency Response Data Sys.Nrc Visit to Obtain Info During Wk of 860623 Suggested. Knowledgeable Personnel Will Be Available to Discuss Recall Sys.Agenda & List of Attendees Requested + (ML20198E419)
- 05000298/LER-1998-010, :on 981118,inadvertent Reactor Protection Sys Half Trip Was Noted.Caused by Defective Electrical Protection Assembly Logic Card.Defective Logic Card Was Replaced with Refurbished Card.With + (ML20198E420)
- ML20198E421 + (ML20198E421)
- ML20198E422 + (ML20198E422)
- ML20198E424 + (ML20198E424)
- ML20198E426 + (ML20198E426)
- TXX-4807, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for high-energy Piping.Initially Reported on 860305. Next Rept by 860613 + (ML20198E428)
- ML20198E430 + (ML20198E430)
- ML20198E431 + (ML20198E431)
- ML20198E433 + (ML20198E433)
- LIC-98-0167, Informs That Implementation of Severe Accident Mgt Guidelines at FCS Was Completed on 981210 & Includes Listed Items + (ML20198E434)
- ML20198E435 + (ML20198E435)
- ML20198E436 + (ML20198E436)
- ML20198E437 + (ML20198E437)
- IR 05000443/1986009 + (ML20198E440)
- ML20198E443 + (ML20198E443)
- ML20198E444 + (ML20198E444)
- ML20198E445 + (ML20198E445)
- ML20198E446 + (ML20198E446)
- ML20198E447 + (ML20198E447)
- RBG-23672, Special Rept:On 860418,invalid Failure Involving Receipt of Trip Indications Experienced on Div I Diesel Generator During Surveillance Testing.Caused by Stuck Relays in Diesel Generator Pneumatic Control Logic + (ML20198E448)
- ML20198E449 + (ML20198E449)
- TXX-4805, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.All Electrical Raceway Items Consolidated.Next Rept by 861021 + (ML20198E450)
- ML20198E452 + (ML20198E452)
- ML20198E453 + (ML20198E453)
- ML20198E454 + (ML20198E454)
- NPL-98-1041, Equipment Qualification Engineering Evaluation + (ML20198E455)
- ML20198E457 + (ML20198E457)
- ML20198E458 + (ML20198E458)
- ML20198E459 + (ML20198E459)
- ML20198E461 + (ML20198E461)
- ML20198E463 + (ML20198E463)
- ML20198E464 + (ML20198E464)
- ML20198E469 + (ML20198E469)
- ML20198E470 + (ML20198E470)
- ML20198E471 + (ML20198E471)
- IR 05000309/1985029 + (ML20198E472)
- ML20198E474 + (ML20198E474)
- ML20198E475 + (ML20198E475)
- ML20198E477 + (ML20198E477)
- ML20198E478 + (ML20198E478)
- ML20198E479 + (ML20198E479)
- TXX-4804, Interim Deficiency Rept CP-85-19 Re Nonrepresentative Sample Used in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 850515.Next Rept by 861021 + (ML20198E484)
- ML20198E486 + (ML20198E486)