Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197E620 + (ML20197E620)
- ML20197E622 + (ML20197E622)
- IR 05000395/1997003 + (ML20197E624)
- ML20197E626 + (ML20197E626)
- IA-86-189, Marked-up Draft IE Info Notice 85-XXX, Licensee Control of Consulting Svcs Providing Training + (ML20197E634)
- ML20197E634 + (ML20197E634)
- NPL-97-0825, Informs That Testing of Safety Injection Check Valve, SI 867A,will Be Delayed Until Early 1998,per Request for Relief VRR-4A from ASME Section XI IST Program + (ML20197E635)
- ML20197E639 + (ML20197E639)
- ML20197E643 + (ML20197E643)
- ML20197E644 + (ML20197E644)
- ML20197E648 + (ML20197E648)
- ML20197E652 + (ML20197E652)
- ML20197E653 + (ML20197E653)
- ML20197E660 + (ML20197E660)
- 05000373/LER-1988-007-07, :on 880503,ESF Isolation Occurred Due to Jumper Falling Off Terminal & Shorting Isolation Sys.Temporary Jumper Device Built to Prevent Recurrence.Blown Fuse Replaced + (ML20197E665)
- IR 05000456/1986017 + (ML20197E666)
- ML20197E669 + (ML20197E669)
- ML20197E675 + (ML20197E675)
- ML20197E678 + (ML20197E678)
- ML20197E685 + (ML20197E685)
- 05000213/LER-1988-013, :on 880502,vol Control Tank Isolation Valve Failed to Close During Surveillance Testing.Caused by Binding of Mechanical Interlock within Reversing Starter Assembly.Starter Replaced W/New Model + (ML20197E686)
- ML20197E689 + (ML20197E689)
- ML20197E692 + (ML20197E692)
- IR 05000382/1986007 + (ML20197E694)
- ML20197E696 + (ML20197E696)
- ML20197E697 + (ML20197E697)
- ML20197E699 + (ML20197E699)
- ML20197E700 + (ML20197E700)
- ML20197E707 + (ML20197E707)
- ML20197E708 + (ML20197E708)
- ML20197E709 + (ML20197E709)
- ML20197E712 + (ML20197E712)
- ML20197E715 + (ML20197E715)
- ML20197E717 + (ML20197E717)
- 05000344/LER-1985-013-01, Forwards Rev 0 to 01-0300-1471, Preliminary Thermal Expansion Evaluation of Reactor Coolant Loop for Trojan Nuclear Plant, as Clarification of LER 85-013-01 in Response to 860430 Telcon + (ML20197E719)
- 05000455/LER-1988-004-10, :on 880506,main Feedwater Pump 2C Tripped Due to Low Electrohydraulic Fluid Supply to Pump.Caused by Personnel Failing to Recognize Consequences of Returning Pump to out-of-svc Condition + (ML20197E720)
- ML20197E721 + (ML20197E721)
- ML20197E727 + (ML20197E727)
- ML20197E733 + (ML20197E733)
- U-600578, Responds to NRC Re Violations & Deviations Noted in Insp Rept 50-461/86-13.Extension of Response Date Requested Due to Need for Addl Time to Develop Adequate Corrective Action Plan.Response Will Be Submitted by 860519 + (ML20197E734)
- ML20197E738 + (ML20197E738)
- ML20197E741 + (ML20197E741)
- ML20197E745 + (ML20197E745)
- ML20197E748 + (ML20197E748)
- ML20197E750 + (ML20197E750)
- ML20197E756 + (ML20197E756)
- ML20197E758 + (ML20197E758)
- ML20197E763 + (ML20197E763)
- ML20197E766 + (ML20197E766)
- ML20197E769 + (ML20197E769)
- ML20197E771 + (ML20197E771)