Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196E270 + (ML20196E270)
- 05000366/LER-1988-017, :on 880527,air Bubble Released Into Condensate Sys Tripping Condensate Booster Pumps & Reactor Feed Pumps on Low Suction Pressure.Caused by Deficient Condensate & Feedwater Sys Operating Procedure + (ML20196E271)
- 05000409/LER-1988-002, :on 880129,temporary Absence of Duty Shift Supervisor from Shift.Scheduled Shift Supervisor Realized Absence & Assumed Duty Himself.Cause Unstated.Proper Shift Turnover Conducted + (ML20196E272)
- ML20196E274 + (ML20196E274)
- ML20196E275 + (ML20196E275)
- ML20196E276 + (ML20196E276)
- ML20196E278 + (ML20196E278)
- ML20196E279 + (ML20196E279)
- ML20196E280 + (ML20196E280)
- ML20196E282 + (ML20196E282)
- VPN-076-98, Forwards Final Rept of Matl Properties of Neutron Shielding Matl to Be Used in Trojan ISFSI & Test Repts That Verified Matl Properties + (ML20196E285)
- ML20196E286 + (ML20196E286)
- ML20196E287 + (ML20196E287)
- ML20196E289 + (ML20196E289)
- ML20196E290 + (ML20196E290)
- ML20196E291 + (ML20196E291)
- ML20196E293 + (ML20196E293)
- ML20196E294 + (ML20196E294)
- ML20196E295 + (ML20196E295)
- 05000254/LER-1988-001, Sanitized Version of LER 88-001-00:on 880114,records Review Found Two Apparent Overexposures of Contractor Personnel During Fourth Quarter 1980.Caused by Inaccurate Secondary &/ or Primary Dosimetry.Dosimetry Sys Upgraded + (ML20196E296)
- ML20196E297 + (ML20196E297)
- ML20196E301 + (ML20196E301)
- ML20196E302 + (ML20196E302)
- ML20196E303 + (ML20196E303)
- ML20196E304 + (ML20196E304)
- ML20196E305 + (ML20196E305)
- ML20196E308 + (ML20196E308)
- ML20196E309 + (ML20196E309)
- ML20196E310 + (ML20196E310)
- ML20196E313 + (ML20196E313)
- ML20196E317 + (ML20196E317)
- IR 05000302/1988032 + (ML20196E318)
- ML20196E319 + (ML20196E319)
- IR 05000387/1988002 + (ML20196E324)
- ML20196E326 + (ML20196E326)
- ML20196E327 + (ML20196E327)
- ML20196E328 + (ML20196E328)
- ML20196E329 + (ML20196E329)
- ML20196E330 + (ML20196E330)
- PNO-V-88-014, on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored + (ML20196E332)
- ML20196E333 + (ML20196E333)
- ML20196E334 + (ML20196E334)
- SNRC-1431, Shoreham Nuclear Power Station Annual Operating Rept,Jan- Dec 1987 + (ML20196E336)
- ML20196E337 + (ML20196E337)
- ML20196E338 + (ML20196E338)
- ML20196E339 + (ML20196E339)
- ML20196E340 + (ML20196E340)
- ML20196E341 + (ML20196E341)
- ML20196E342 + (ML20196E342)
- ML20196E344 + (ML20196E344)
- ML20196E349 + (ML20196E349)