Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195K170 + (ML20195K170)
- 05000341/LER-1999-002, :on 990518,RRP Trip Resulted in Manual Reactor Scram.Caused by Previous Actions Taken to Minimize Risk for RRP Trip Were Not Effective.Preventive Maint Activity to Change RRP MG Set Brushes Has Been Revised.With + (ML20195K171)
- ML20195K172 + (ML20195K172)
- ML20195K175 + (ML20195K175)
- L-99-100, Forwards Typed,Final TS Pages for LAR 109 Re Rcs.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages Is Provided in Attachment B-109 + (ML20195K176)
- ML20195K177 + (ML20195K177)
- ML20195K182 + (ML20195K182)
- ML20195K183 + (ML20195K183)
- IR 05000413/1988018 + (ML20195K184)
- ML20195K185 + (ML20195K185)
- ML20195K186 + (ML20195K186)
- ML20195K188 + (ML20195K188)
- L-99-095, Provides Addl Info to Support LARs 262 & 135,in Response to NRC 990527 Verbal Request.Info Describes Performance of Unit 1 Rod Position Indication Sys & Provides Some Background Info Re Normal Operation of Sys + (ML20195K190)
- ML20195K191 + (ML20195K191)
- 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below + (ML20195K193)
- ML20195K194 + (ML20195K194)
- ML20195K196 + (ML20195K196)
- ML20195K199 + (ML20195K199)
- ML20195K201 + (ML20195K201)
- ML20195K202 + (ML20195K202)
- ML20195K203 + (ML20195K203)
- 05000457/LER-1999-003-03, :on 990519,spurious Spiking of Indication on Intermediate Range Neutron Flux Channel N36 Resulted in Unit 2 Reactor Trip.Cause Unknown.Personnel Stabilized Reactor in Shutdown Condition Using Appropriate Emergency Procedures + (ML20195K204)
- ML20195K206 + (ML20195K206)
- ML20195K207 + (ML20195K207)
- ML20195K210 + (ML20195K210)
- ML20195K211 + (ML20195K211)
- ML20195K212 + (ML20195K212)
- ML20195K214 + (ML20195K214)
- ML20195K215 + (ML20195K215)
- ML20195K216 + (ML20195K216)
- ML20195K219 + (ML20195K219)
- ML20195K223 + (ML20195K223)
- ML20195K224 + (ML20195K224)
- ML20195K225 + (ML20195K225)
- ML20195K228 + (ML20195K228)
- 05000282/LER-1999-006, :on 990519,discovered That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Caused by Inadequate Procedure.Util Has Quarantined Sps 1083 & 2083 Until Revs Are Completed + (ML20195K231)
- ML20195K235 + (ML20195K235)
- PY-CEI-NRR-0935, Application for Amend to License NPF-58,revising Tech Specs 2.1.2,3.2.1,3.2.2 & 3.2.3 Re Safety Limit Min Critical Power Ratio & Associated Power Distribution Limits for Fuel to Be Loaded Into Core for Second Cycle.Fee Paid + (ML20195K236)
- ML20195K238 + (ML20195K238)
- IR 05000277/1999004 + (ML20195K239)
- ML20195K240 + (ML20195K240)
- ML20195K242 + (ML20195K242)
- ML20195K243 + (ML20195K243)
- 05000265/LER-1988-012, :on 880524,existing Pipe Supports on Line 2-1265-2 Do Not Meet Design Requirements.Caused by Improper Design Analysis During Earlier Mod of Line.Supports Modified to Bring Line within FSAR Allowables + (ML20195K244)
- IA-87-700, Partial Response to FOIA Request.Documents in App C Already Available in PDR + (ML20195K245)
- ML20195K245 + (ML20195K245)
- ML20195K246 + (ML20195K246)
- ML20195K247 + (ML20195K247)
- ML20195K248 + (ML20195K248)
- ML20195K249 + (ML20195K249)
- NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With + (ML20195K250)