Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B17538, Forwards Revised NRC Form 396, Certification of Medical Examination by Facility Licensee, & Supporting Physicians Rept for Licensed Operator.Encl Withheld,Per 10CFR2.790(a)(6) + (ML20195G031)
- ML20195G033 + (ML20195G033)
- ML20195G034 + (ML20195G034)
- ML20195G035 + (ML20195G035)
- B17536, Forwards Revised NRC Form 396, Certification of Medical Examination by Facility Licensee, & Supporting Physicians Rept for Licensed Operator.Encl Withheld,Per 10CFR2.790(a)(6) + (ML20195G036)
- IA-88-541, Package of Blank Application Forms for AEC Source Matl License + (ML20195G038)
- ML20195G038 + (ML20195G038)
- ML20195G039 + (ML20195G039)
- ML20195G040 + (ML20195G040)
- ML20195G041 + (ML20195G041)
- ML20195G042 + (ML20195G042)
- ML20195G043 + (ML20195G043)
- ML20195G045 + (ML20195G045)
- ML20195G048 + (ML20195G048)
- ML20195G050 + (ML20195G050)
- ML20195G053 + (ML20195G053)
- ML20195G054 + (ML20195G054)
- ML20195G055 + (ML20195G055)
- ML20195G056 + (ML20195G056)
- 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 + (ML20195G059)
- ML20195G061 + (ML20195G061)
- ML20195G062 + (ML20195G062)
- ML20195G064 + (ML20195G064)
- ML20195G066 + (ML20195G066)
- 05000445/LER-1999-001-01, :on 990510,discovered That Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures.Caused by Less than Adequate Procedures.Revised Circuit Testing Procedures + (ML20195G067)
- ML20195G068 + (ML20195G068)
- ML20195G070 + (ML20195G070)
- ML20195G071 + (ML20195G071)
- ML20195G073 + (ML20195G073)
- ML20195G074 + (ML20195G074)
- B17785, Responds to NRC 990405 Verbal RAI Re Util Corrective Action Plan for Maintaining Leak Tightness of Containment Enclosure Bldg + (ML20195G075)
- B17528, Forwards Revised NRC Form 396, Certification of Medical Examination by Facility Licensee, & Supporting Physicians Rept for Licensed Operator.Encl Withheld,Per 10CFR2.790(a)(6) + (ML20195G076)
- ML20195G078 + (ML20195G078)
- ML20195G079 + (ML20195G079)
- 05000395/LER-1999-007, :on 990511,missed Surveillance Re Tadot Was Noted.Caused by Conflict in Requirements Between Surveillance Frequency & Actual Mode Requirment for Tadot. Revised Procedure STP-142.005.With + (ML20195G080)
- ML20195G081 + (ML20195G081)
- ML20195G083 + (ML20195G083)
- 05000445/LER-1999-002-01, :on 990518,missed TS Surveillance for SG Gross Activity Composite Sampling Was Noted.Caused by Cognizant Personnel Being Distracted from Normal Duties.Sg Sample Was Taken IAW TS Appropriate TS Requirement.With + (ML20195G084)
- ML20195G086 + (ML20195G086)
- ML20195G087 + (ML20195G087)
- ML20195G090 + (ML20195G090)
- 05000423/LER-1998-040, :on 981017,entry Into TS 3.0.3 Occurred Due to Both Quench Spray Sys Pumps Being Placed in pull-to-lock Position.Caused by Human Error.Operator Involved in Event Removed from Shift & Disciplinary Action Taken + (ML20195G091)
- ML20195G092 + (ML20195G092)
- ML20195G093 + (ML20195G093)
- ML20195G094 + (ML20195G094)
- ML20195G095 + (ML20195G095)
- 05000445/LER-1999-003-01, :on 990519,discovered Battery Surveillances Were Not Performed with Proper Periodicity as Required by Ts.Caused by Misinterpretation of Sr.Resistance Readings Taken,Noed Requested & LAR Requested.With + (ML20195G096)
- ML20195G098 + (ML20195G098)
- PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area + (ML20195G099)
- ML20195G100 + (ML20195G100)
- ML20195G102 + (ML20195G102)