ML20195G073
| ML20195G073 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/06/1988 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-53FR16435, RULE-PR-50 53FR16435-00484, 53FR16435-484, NUDOCS 8806270219 | |
| Download: ML20195G073 (1) | |
Text
r-DOCKET N!JMBER
~
PROPOSED ndLE' S E
[53 FA/bY353-U5NHC 1B JIN -9 P5 :39 June 6, 1988 Samuel J. Chilk QFJitt. d ID.rt an '
Secretary of the Commission WCKEi
& ! NVICf.' At t ent ion : Docketing U.S. Nuclear Regulatory Commission and Service Branch 1717 H Street, N.W.
Washington, D.C.
20555 Dear Sir On May 9, 1988, the Nuclear Regulatory Commission (NRC) published a proposed change to its emergency planning requirements for fuel loading and lew-power operation of nuclear power plants.
The propor<'.u k change would eliminate many existing low power 4'
licensing. quirements, including offsite emergency response plans, any public-notification systems (including sirens), and the training of offsite emergency response personnel.
As a resident of the Seabrook nuclear plant area, I vigorously oppose the proposed amendment to existing safety requirements.
The proposed rule has been developed with only the utility's interests in mind.
The NRC is once again moving to place the public at risk for the sole purpose of allowing Seabrook Station to obtain a low-power license, even though the question of whether it will ever be granted a full-power license is seriously in doubt.
In the interest of public safety, I urge' the Commission to reject the proposed rule change.
All offsite emergency response planning requirements must be in place before allowing any degree of risk to the public, ineluding r1sks from low power operation.
Sincerely,
. c,
- t..
r Name and Address:
s u...
t
'"""m w sy y w o m
..: n
..t 8806270219 000606 PDR PR SO 53FR16435 PDR b s to
-