Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195D422 + (ML20195D422)
- ML20195D425 + (ML20195D425)
- IR 05000344/1988034 + (ML20195D426)
- ML20195D427 + (ML20195D427)
- ML20195D428 + (ML20195D428)
- ML20195D429 + (ML20195D429)
- ML20195D431 + (ML20195D431)
- ML20195D435 + (ML20195D435)
- L-99-086, Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 1 + (ML20195D436)
- ML20195D437 + (ML20195D437)
- ML20195D439 + (ML20195D439)
- ML20195D440 + (ML20195D440)
- ML20195D442 + (ML20195D442)
- ML20195D443 + (ML20195D443)
- ML20195D444 + (ML20195D444)
- ML20195D445 + (ML20195D445)
- ML20195D447 + (ML20195D447)
- ML20195D449 + (ML20195D449)
- ML20195D450 + (ML20195D450)
- ML20195D451 + (ML20195D451)
- IR 05000334/1988034 + (ML20195D453)
- ML20195D454 + (ML20195D454)
- ML20195D455 + (ML20195D455)
- 0CAN119808, Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with + (ML20195D457)
- ML20195D458 + (ML20195D458)
- ML20195D460 + (ML20195D460)
- ML20195D461 + (ML20195D461)
- ML20195D462 + (ML20195D462)
- ML20195D463 + (ML20195D463)
- PNO-IV-88-051, failure of Westinghouse DS-416 Electrical Breakers.Failures Could Be Generic Problem.Westinghouse Representatives on Site Observing Testing,Insp & Installation of Subj Breakers + (ML20195D464)
- ML20195D465 + (ML20195D465)
- ML20195D466 + (ML20195D466)
- 05000498/LER-1988-034, :on 880517,discovered That Preoperational Test Procedures Did Not Include Test for One ESF Sequencer Actuations of Containment Spray Pumps.Caused by Procedural Inadequacy Due to Uniqueness of Signals + (ML20195D467)
- ML20195D468 + (ML20195D468)
- BVY-98-158, Submits Clarification & Correction to NRC SER for GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves + (ML20195D470)
- IR 05000344/1988036 + (ML20195D471)
- ML20195D472 + (ML20195D472)
- ML20195D474 + (ML20195D474)
- ML20195D476 + (ML20195D476)
- ML20195D477 + (ML20195D477)
- ML20195D478 + (ML20195D478)
- ML20195D479 + (ML20195D479)
- L-98-209, Submits Initial Response to GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition. Util Determined That Units 1 & 2 Are Not Susceptible to Subject GL Event + (ML20195D481)
- NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 + (ML20195D482)
- ML20195D483 + (ML20195D483)
- PNO-IV-98-053, on 981114,moisture Density Gauge Stolen from Vehicle Parked at Residence in Chandler,Az.Gauge Was Model 3411B Troxler Moisture/Density Gauge Which Was Temporarily Stored in Bed of Truck at Licensee Employee Residence + (ML20195D484)
- ML20195D487 + (ML20195D487)
- ML20195D489 + (ML20195D489)
- ML20195D491 + (ML20195D491)
- ML20195D492 + (ML20195D492)
- L-98-214, Requests Withdrawal of 981016 LAR 134,permitting Surveillance Interval Specified in SR 4.8.1.1.1.b.Subject Surveillance Was Completed on 981105 Following Unplanned Outage of Plant + (ML20195D493)