Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195C557 + (ML20195C557)
- ML20195C558 + (ML20195C558)
- ML20195C559 + (ML20195C559)
- IA-86-321, Final Response to FOIA Request for Info Re Federally Funded R&D Ctr.App Lists Ltrs to & from Southwest Research Inst, Itt Research Inst & Pennsylvania State Univ.Records Subj to Request Available in PDR + (ML20195C561)
- ML20195C561 + (ML20195C561)
- ML20195C563 + (ML20195C563)
- NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld + (ML20195C564)
- ML20195C565 + (ML20195C565)
- ML20195C567 + (ML20195C567)
- ML20195C569 + (ML20195C569)
- IA-86-315, Responds to FOIA Request for List of Respondents to 860401 Commerce Business Daily Announcement, Operation of Ctr for Nuclear Regulatory Analysis. List Encl.Documents Available in PDR + (ML20195C570)
- ML20195C570 + (ML20195C570)
- ML20195C572 + (ML20195C572)
- ML20195C573 + (ML20195C573)
- ML20195C575 + (ML20195C575)
- ML20195C577 + (ML20195C577)
- ML20195C578 + (ML20195C578)
- NOC-AE-000545, Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend + (ML20195C579)
- ML20195C580 + (ML20195C580)
- 3F0599-21, Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads + (ML20195C583)
- ML20195C584 + (ML20195C584)
- ML20195C585 + (ML20195C585)
- ML20195C587 + (ML20195C587)
- ML20195C589 + (ML20195C589)
- ML20195C590 + (ML20195C590)
- ML20195C591 + (ML20195C591)
- ML20195C594 + (ML20195C594)
- ML20195C595 + (ML20195C595)
- IR 05000382/1988004 + (ML20195C596)
- ML20195C600 + (ML20195C600)
- ML20195C602 + (ML20195C602)
- ML20195C603 + (ML20195C603)
- IA-86-176, Responds to FOIA Request for Structural Integrity Test Repts for Four Plants.Forwards App Documents.Documents Also Available in Pdr.Nrc Unable to Locate Test Repts for Limerick or Nine Mile Point + (ML20195C604)
- ML20195C604 + (ML20195C604)
- ML20195C606 + (ML20195C606)
- ML20195C607 + (ML20195C607)
- RBG-44722, Forwards Response to NRC 980630 RAI Re RBS Water Hammer & two-phase Flow Issues Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions + (ML20195C608)
- ML20195C610 + (ML20195C610)
- ML20195C611 + (ML20195C611)
- ML20195C612 + (ML20195C612)
- 05000348/LER-1998-005-03, :on 981021,automatic Start of B Train Penetration Room Filtration Occurred Due to Filling Sf Tc. Caused by Inadequate Procedure.Changed Procedure to Provide Specific Guidance for Filling SFP Tc.With + (ML20195C613)
- ML20195C614 + (ML20195C614)
- A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With + (ML20195C615)
- ML20195C616 + (ML20195C616)
- ML20195C617 + (ML20195C617)
- BSEP-98-0204, Forwards Response to GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (ML20195C618)
- ML20195C619 + (ML20195C619)
- ML20195C620 + (ML20195C620)
- ML20195C621 + (ML20195C621)
- ML20195C625 + (ML20195C625)
- ML20195C626 + (ML20195C626)