Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155E414 + (ML20155E414)
- ML20155E415 + (ML20155E415)
- ML20155E417 + (ML20155E417)
- ML20155E418 + (ML20155E418)
- ML20155E423 + (ML20155E423)
- ML20155E427 + (ML20155E427)
- ML20155E428 + (ML20155E428)
- ML20155E430 + (ML20155E430)
- ML20155E432 + (ML20155E432)
- PNO-III-98-052, on 981030,radioisotope Generator Was Received with Radiation Level Above Limit.Dupont Is Investigating Cause of Excessive Radiation Level & Package Damage.Nrc Staff Will Review Incident During Next Insp + (ML20155E433)
- ML20155E434 + (ML20155E434)
- ML20155E435 + (ML20155E435)
- PNO-V-88-037, on 880608,Region V Received Notification by State of CA of Two Instances of Radiation Doses of Greater than 1.25 Rem to One Radiographer.Exposures Are Film Badge Results from Radiation Detection Co + (ML20155E436)
- ML20155E438 + (ML20155E438)
- NRC-88-0149, Informs That Phasing Out of Safeteam Program Underway.Goals of Program Will Be Pursued Through Use of Ombudsman. Ombudsman Better Able to Understand Technical Complexity of Operating Facility + (ML20155E444)
- ML20155E447 + (ML20155E447)
- ML20155E448 + (ML20155E448)
- ML20155E452 + (ML20155E452)
- 05000263/LER-1998-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed + (ML20155E457)
- ML20155E459 + (ML20155E459)
- ML20155E460 + (ML20155E460)
- ML20155E462 + (ML20155E462)
- IR 05000302/1988018 + (ML20155E464)
- ML20155E465 + (ML20155E465)
- ML20155E467 + (ML20155E467)
- ML20155E471 + (ML20155E471)
- ML20155E473 + (ML20155E473)
- 05000395/LER-1988-010-08, :on 880830,failure to Perform Fire Watch Following Fire Sys Computer Malfunction Induced by Lightning Striking Meteorological Tower.Caused by Inadequate Training & Procedural Guidance.Event Reviewed + (ML20155E474)
- ML20155E476 + (ML20155E476)
- IR 05000213/1987099 + (ML20155E479)
- ML20155E483 + (ML20155E483)
- ML20155E485 + (ML20155E485)
- ML20155E486 + (ML20155E486)
- ML20155E488 + (ML20155E488)
- ML20155E490 + (ML20155E490)
- ML20155E492 + (ML20155E492)
- ML20155E493 + (ML20155E493)
- ML20155E495 + (ML20155E495)
- ML20155E497 + (ML20155E497)
- ML20155E499 + (ML20155E499)
- TXX-8845, Submits Info for Clarification Re Meeting on ASME Section III Stamping & Data Rept Requirements.Stipulation Re Stamping & Data Rept Certification Met by Util as Indicated in Stated Discussion + (ML20155E500)
- ML20155E501 + (ML20155E501)
- ML20155E503 + (ML20155E503)
- B13032, Proposed Tech Specs Pages 3/4 4-7,3/4 4-9,B 3/4 4-2a & B 3/4 4-3 Re Surveillance Requirements for RCS Leakage + (ML20155E504)
- ML20155E505 + (ML20155E505)
- LD-88-038, Provides Proposed Resolutions for Four of Six Issues Which Make Up Topic Paper Set 2,including in-vessel Hydrogen Generation,Core Melt Progression & Vessel Failure & Hydrogen Ignition & Burning.Remaining Issues Submitted in 30 Days + (ML20155E506)
- ML20155E508 + (ML20155E508)
- ML20155E511 + (ML20155E511)
- 05000352/LER-1988-016, :on 880507,Channel B Reactor Protection Sys 1/2 Scram & Various Nuclear Steam Supply Shutoff Sys Isolations Occurred.Caused by Overheating of Fuse Due to Inadequate Contact.Fuse Replaced + (ML20155E513)
- ML20155E514 + (ML20155E514)
- ML20155E519 + (ML20155E519)