ML20155E476

From kanterella
Jump to navigation Jump to search
Documents 880930 Telcon Between Gd Boyer & DD Chamberlain Re Change in Completion Date for Rev 2 to Emergency Operating Procedure.Because of Number of Changes Required & Required Procedure Training Submittal Delayed Until 890330
ML20155E476
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/07/1988
From: Bailey J
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ET-88-0131, ET-88-131, NUDOCS 8810120300
Download: ML20155E476 (1)


Text

i l

VA9LF CREEK l

NUCLEAR OPERATING CORPORATION John A. Baby I

vc. m m October 7. 1988 i

sm.omes sm 1

l ET 88-0131 i

U. S. Nuclese Regulatory Commission ATTNs Document Control Desk l

Mr.il Station P1-137 Washington, D. C. 20555 l

Reference:

Letter dated June 10, 1988, from B. D. Withers, VCN00, I

to Document Control Desk, NRC

Subject:

Iboket No. 50-482: Inte for Next Revision of the Dnergency Operating Procedures i

Gentlemen:

The purpose of this letter is to document a conversation between Mr. G. D.

I Boyer of Volf Creek Nuclear Operating Corporstion ani Mr. D. D. Chaderlain of the NRC Region IV staff on September 30, 1989.

The discussion concerned a change in the completion date, as stated in the Reference, for Revisjon 2 l

of the Emergency Operating Procedures.

Beesuse of the number of changes being msde and the number of NRC coments made during the Emergency Operating Procedure (EOP) Inspection, the new completion date of Revision 2, along with the required procedure training, is scheiuled for March 30, 1989.

l The current status of the E0P revision effort is that the 43 Emergency i

l Operating Procedures have hsd chsnges made to them and they are in fins 1 draf t form.

In addition, the procedures have been verifiel mi validsted as required by the procedures generation packsge. The remsining sotions are to perfo rm a final review of the procedures ani conduct training on all of the l

procelures for the operatora.

l If you hsve sny questions concerning this mstter, plesse contact me or i

l Mr. O. L. tisynsed of my stsff.

Very truly.yours, f

Q, V

14 It a

/

lf:f John A. Failey

$y$

Vice President Engineering ani Technicsl Services hQ JAB / jai 56

\\

cc:

3. L. Bartlett (NRC) 1 l

g D. D. Chamberlain (NRC) oc R. D. Martin (NRC)

[

N' D. Pickett (NRC), 2 PO Bcm 4111 MW AS 66833 i Phone (316) 364 8331 4 Iw CWwwy Ew W F No)TT l

WQLF CREEK NUCLEAR OPERATING CORPORATION Joe A. saw vw. n **

October 7, 1068 Em.w v.cww w ET 83-0131 i

U. S. Nuclesr Regulatory Commission ATTN Document Control Desk Msil Station P1-137 Vsahington, D. C. 20555 Referenoo Letter datel June 18, 1938, from B. D. Withers, VCNOC, to Document Control Desk, NRC

Subject:

Dooket No. 50-482:

Dste for Next Revision of the Dnergency Operating Procedures Gentlemin

,I The purpose of this letter is to document a conversstion between Mr. G. D.

Boyer of Wolf Creek Nuolear Operating Corporation and Mr. D. D. Chamberlain of the NRC Region IV staff on September 30, 1933.

The discussion concerned a chstge in the completion date, as stated in the Reference, for Revision 2 of the Emergency Operating Procedures.

Because of the number of changes being made and the number of NRC comients msde during the Emergency Operating Procedure (E0" Inspection, the new completion date of Revision 2 l

along with the requirei procedure training, is schedule <1 for Msroh 30, 1989.

4 The current status of the E0P revision effort is that the 43 F.mergency Operating Proceiurss have had chsngea ma.de to them and they are in final desft form.

In addition, the proceiures have been verified ani vslidsted as

(

requirei by the procelures generstion packsge. The remaining actions are to

[

pe rform a finsi review of the proc +1ures ani contuot training on all of the L

procalures for the operators.

[

If you have sny questions concerning this mstter, plesse contact it e or Mr. O. L. Maynsrd of my staff.

Very truly,yours, Q,

N di

.I4 l

865 J

Mi John A. Failey I

(? S(

Vice President Erdineering ani Technicsl Services l

j

)[

J AB/j a.1 l

oc j

f ece

3. L. Bsrtlett (NRO)

D. D. Chamberlain (NRC)

I N

R. D. Msrtin (NRC) b p' N'

D. Pickett (NRC). 2 I

PO. Bom 411, BN. AS M839 i Fhere (316) 364-8&31 e Eos CWcrwW, t%w M F WAff

-