ROUTING AND TRANSMITTAL SLIP

'/O- [~33 TOs (Neme,omco symbat, room number.

Initiels Date buliding, Agency,900t)

Doris Mossburg - NRR Mailroom/12-G-18 2.

3.

4.

5.

Action File Note end Retum Aporoval For Clearance Per Conversation As Requested For Correction Prepare Reph Circutete For Your information See Me Comment Investigate Signature Coordination Just@

REMARKS Attached is the f)/8 The. schedule for this periodRR Meeting Schedule for the of /0//i///- /0/#/

includes only those notices sent to the Policy Development and Technical Support Branch as of the date of this transmittal.

DISTRIBUTION i

T. Murley 12-G-18 T. Cox 12-E-4 l

J. Sniezek 12-G-1v F. Ingram 2-G-5 I

E. Jordan MtiBB-3302 Mabel Lee MNBB-10204 J. Hoyle 17-G-13 C. Thomas 12-E-4 R. Senseney 3-H-5 T. Novak EWS-263 ADT/NRR 12-G-18 S. Schofer P-313 S. Showman 16-G-15 M. Williams EWS-263 White Flint Receptionist J. Axelrad 7-D-24

  • Transmit to Regions /Rehm hR

~ ~1' R

00 NOT 96e thle form se a RECORD of soccovels, concurrentes. desposele, clostances, and similst actbns FRO Mt (Neme, orp. eymbot, Agency 9ous)

\\ Room No.- 8lGg.

12-E-4 Lena Thomas, PTSB/PMAS/NRR Phone No.

49-21257

.AL FORM 41 (Rev.7 76)~

miMi.i.ii.m 4

8 3

8010120294 0 % O7 PDR ORO N

PNV

$l NRR MEETING NOTICES

  • September 30, 1988 l

l APPLICANT /

DATE/ TIME MUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 10/3-6/88 50-425 Vogtle Unit 2 To perform a review of NRC/ Utility J. Hopkins 8:00-4:00 Waynesbero, GA structural analyses supporting the Vogtle Unit 2 spent fuel pool racks.

10/5/88 50-311 White Flint 81dg.

To discuss the use of NRC/ Utility J. Stone 10:30-2:30 Room 148-13 mechanical seals on Salet.

10/5/88 50-483 White Flint Bldg.

The licensee will present 1:00-3:00 Room 128-9 the steam generator level l

reactor trip modification for Callaway.

10/5/88 50-293 White Flint Bldg.

Status of readiness for NRC/ Utility D. Mcdonald l

1:00-4:00 Room 2F-17&21 restart of the Pilgrim l

facility.

10/6/88 50-395 White Flint Bldg.

To discuss South Carolina NRC/Utilty J. Hayes 8:30 148-11 Electri.- & Gas program to respond to NRC Bulletin 88-08, "Thersal Stresses in piping connected to reactor coolant pumps."

Copies of summaries of these meeting; will be made publicly available and placed in the respective docket file (s) in the NRC and local public document rooms.

A listing of these meeting notices can be obtained by calling 492-7424.

l

~

c

, I 2

l APPLICANT /

DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 10/11/88 50-317, Calvert Cliffs Nuclear BG8E shall give presen-NRC/BG&E S. McNeil i

1-00-4:00 318 Power Plant tation on the status of Maryland Rts 2 & 4 implementing corrective P.O. Box 1535 actions for previously Lusby, MD 20657 identified weakness in the Nuclear Engineering Services Deparbnent.

10/13/88 50-029 White Flint Bldg.

Routine monthly scheduling NRC/ Utility M. Fairtile 8:30-10:00 Room 14D-10 and prioritization meeting.

l 10/18/88 50-395 V.C. Summer Nuclear Stn.

To discuss the status of NRC/ Utility J. Hayes 1:30 Jenkinsville, S.C.

licensing activities.

10/25/88 White Flint Bldg.

To discuss state of the art NRC/ITI S. Newberry 9:00-12:00 Room 78-9 technology and the applica-tion of the Swedish ASEA Master System in the U.S.

I 10/28/88 50-269, White Flint 81dg.

To discuss Duke's corporate NRC/ Utility D. Hood 11:00-1:00 270, 287 Room 148-11 approach regarding QA 413, 414 surveillance and audit 369, 370 techniques.