Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1988-013, :on 880415,during Performance of Functional Test Procedure to Return Hydrogen Recombiner to Svc,Failure to Test Piping Violated Primary Containment Integrity.Caused by Personnel Error.Isolation Valves Closed + (ML20154G061)
- ML20154G064 + (ML20154G064)
- ML20154G065 + (ML20154G065)
- ML20154G066 + (ML20154G066)
- ML20154G068 + (ML20154G068)
- ML20154G069 + (ML20154G069)
- ML20154G070 + (ML20154G070)
- ML20154G074 + (ML20154G074)
- 05000333/LER-1988-007, :on 880816,pipe Supports for Rhr/Lpci Pump Min Flow Lines Not Installed Follwing Maint.Caused by Failure to Properly Implement Written Procedures Required by Tech Spec 6.8.A.Supports Installed + (ML20154G076)
- ML20154G077 + (ML20154G077)
- ML20154G078 + (ML20154G078)
- ML20154G079 + (ML20154G079)
- ML20154G084 + (ML20154G084)
- CEO-88-171, Responds to DG Eisenhut to All Power Reactors Re QA Requirements for Diesel Generator Fuel Oil.Surveillance Requirement Added to Tech Spec 4.6.3,per Amend 94,to Require That Listed Tests Be Performed + (ML20154G085)
- ML20154G086 + (ML20154G086)
- ML20154G089 + (ML20154G089)
- ML20154G093 + (ML20154G093)
- ML20154G094 + (ML20154G094)
- ML20154G095 + (ML20154G095)
- ML20154G096 + (ML20154G096)
- ML20154G098 + (ML20154G098)
- ML20154G099 + (ML20154G099)
- ML20154G104 + (ML20154G104)
- ML20154G108 + (ML20154G108)
- ML20154G109 + (ML20154G109)
- ML20154G111 + (ML20154G111)
- ML20154G113 + (ML20154G113)
- 05000280/LER-1986-008, :on 860213,unexpected Start of Auxiliary Feed Pump 2-FW-P-3B Occurred.Caused by Open Coil in Bfd Relay AFP-3XB.Relay Replaced & Tested Satisfactorily + (ML20154G115)
- 05000254/LER-1987-008-01, :on 870508,RHR Svc Water Sys Operable,But Outside Plant Design Specs.Caused by Anchor Bolt Nuts Loosening in Svc While Being Subjected to Operational Vibration.Plate & Bolts Replaced + (ML20154G118)
- ML20154G120 + (ML20154G120)
- ML20154G123 + (ML20154G123)
- ML20154G124 + (ML20154G124)
- ML20154G126 + (ML20154G126)
- ML20154G127 + (ML20154G127)
- ML20154G128 + (ML20154G128)
- ML20154G129 + (ML20154G129)
- 05000339/LER-1998-003-01, :on 980424,multiple Failures Occurred During Functional Testing of RCS Large Bore Snubbers.Cause Unknown. Large Bore Snubbers Replaced.With + (ML20154G130)
- ML20154G131 + (ML20154G131)
- ML20154G133 + (ML20154G133)
- ML20154G135 + (ML20154G135)
- ML20154G137 + (ML20154G137)
- ML20154G139 + (ML20154G139)
- ML20154G142 + (ML20154G142)
- 05000382/LER-1988-008, :on 880417,Train a Control Room & Fuel Handling Bldg Emergency Filtration Units Automatically Started Due to Voltage Fluctuation on Vital Uninterruptible Bus.Cause Not Stated.Equipment Returned to Normal + (ML20154G144)
- ML20154G145 + (ML20154G145)
- TXX-8840, Forwards Updated S&W Corrective Action Program Design Validation Package Indexes for Civil/Structural,Mechanical, Electrical,Instrumentation & Control & Nutech Mechanical Procurement Status Rept Units + (ML20154G147)
- ML20154G148 + (ML20154G148)
- ML20154G149 + (ML20154G149)
- IR 05000443/1998007 + (ML20154G150)
- 05000280/LER-1986-009, :on 860208,during Startup,Operating Main Feedwater Pump Tripped Due to High Level in Steam Generator C.Caused by Dust Accumulation in Pilot Relay Blocking Air to Valve Operator.Blockage Removed + (ML20154G151)
- ML20154G153 + (ML20154G153)