Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154B800 + (ML20154B800)
- ML20154B801 + (ML20154B801)
- NPL-98-0777, Forwards Addl Info Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Rev 0 to Calculation 98-0132, Evaluation of 23.6 EFPY P-T Limit & LTOP Applicability Date & Pressurized Thermal Shock at 32 EFPY, Encl + (ML20154B803)
- ML20154B804 + (ML20154B804)
- ML20154B805 + (ML20154B805)
- ML20154B806 + (ML20154B806)
- ML20154B807 + (ML20154B807)
- ML20154B810 + (ML20154B810)
- IR 05000354/1986005 + (ML20154B811)
- ML20154B813 + (ML20154B813)
- ML20154B815 + (ML20154B815)
- 05000213/LER-1998-008, :on 980721,determined That Main Stack Radiation Monitor RMS-14B Samples Were Not Analyzed to Required Detection Level.Caused by Inadequate Design.Immediately Controlled Temp of Radiation Monitor Room.With + (ML20154B816)
- ML20154B817 + (ML20154B817)
- ML20154B819 + (ML20154B819)
- ML20154B820 + (ML20154B820)
- ML20154B821 + (ML20154B821)
- ML20154B822 + (ML20154B822)
- U-601265, Ro:On 880901,HPCS Initiated & Injected Water Into Reactor for 28 During Maint Surveillance Activities on Reactor Water Level Transmitter.Injection Valve & HPCS Pump Secured. Notification of Unusual Event Lasted Approx 10 Minutes + (ML20154B824)
- PY-CEI-NRR-0440, Forwards Suppl to Info Provided in 860212 & 28 Ltrs Re Seismic Event Evaluation,Including Natural Frequency of Seismic Instrumentation Mounting Arrangement & Strong Motion Data from Aftershock + (ML20154B825)
- ML20154B827 + (ML20154B827)
- ML20154B828 + (ML20154B828)
- ML20154B829 + (ML20154B829)
- ML20154B830 + (ML20154B830)
- ML20154B831 + (ML20154B831)
- B13007, Proposed Tech Spec Changes Stating That Penalty for Undetected Fouling of Feedwater Venturis of 0.1% Is Added to Flow Measurement Uncertainty Values If Venturis Not Cleaned at Least Once Per 18 Months + (ML20154B832)
- IR 05000333/1998005 + (ML20154B834)
- ML20154B836 + (ML20154B836)
- ML20154B837 + (ML20154B837)
- IR 05000027/1986001 + (ML20154B838)
- U-601263, Forwards Schedules Reflecting Exam Dates to Support Initial Licensing & Upgrade Exams in Response to Generic Ltr 88-13, Operator Licensing Exams. Schedule for Requalification Exams Also Encl + (ML20154B839)
- ML20154B841 + (ML20154B841)
- ML20154B844 + (ML20154B844)
- ML20154B845 + (ML20154B845)
- ML20154B846 + (ML20154B846)
- ML20154B847 + (ML20154B847)
- ML20154B848 + (ML20154B848)
- ML20154B850 + (ML20154B850)
- ML20154B851 + (ML20154B851)
- ML20154B852 + (ML20154B852)
- 3F0988-02, Forwards Info in Response to NRC Bulletin 85-005 Requiring That All Piping Supplies,Inc. & West Jersey Mfg Co. Supplied Matls Be Identified & Determination Made as to Suitability for Intended or Actual Applications + (ML20154B853)
- ML20154B857 + (ML20154B857)
- ML20154B858 + (ML20154B858)
- ML20154B859 + (ML20154B859)
- ML20154B861 + (ML20154B861)
- ML20154B862 + (ML20154B862)
- ML20154B863 + (ML20154B863)
- ML20154B864 + (ML20154B864)
- ML20154B865 + (ML20154B865)
- ML20154B866 + (ML20154B866)
- ML20154B868 + (ML20154B868)
- ML20154B869 + (ML20154B869)