Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153D912 + (ML20153D912)
- W3P86-0033, Application for Amend to License NPF-38,revising Tech Specs to Extend Containment Leakage Type B & C Testing to First Refueling Outage & to Clarify Allowable Surveillance Interval for Diesel Generator Insp.Fee Paid + (ML20153D915)
- ML20153D916 + (ML20153D916)
- ML20153D919 + (ML20153D919)
- ML20153D921 + (ML20153D921)
- U-600413, Forwards Planned Actions to Resolve Open Items in Insp Rept 50-461/85-39 Re Emergency Preparedness Implementation Appraisal.Results of Consideration of Each Improvement Item Also Encl + (ML20153D924)
- BVY-98-145, Informs That Date for Triennial Audit of Duke Engineering Svcs Established for End of Oct 1998 + (ML20153D929)
- ML20153D932 + (ML20153D932)
- ML20153D936 + (ML20153D936)
- ML20153D939 + (ML20153D939)
- ML20153D942 + (ML20153D942)
- ML20153D944 + (ML20153D944)
- U-600440, Responds to 851106 Request for Info Re Preliminary Analysis of Plant Hydrogen Control Sys.Equipment Survivability Demonstrated by Conducting Analysis of Igniter Assembly.Addl Analysis Unwarranted + (ML20153D946)
- ML20153D949 + (ML20153D949)
- ML20153D952 + (ML20153D952)
- PNO-I-86-013A, on 860207,wrong Patient Received Prescribed Dose of 150 Rads After Kidney Transplant.Caused When Clerk Entered Order for Wrong Kidney Patient.Proper Patient Treated.Required Notifications Made + (ML20153D953)
- ML20153D954 + (ML20153D954)
- ML20153D958 + (ML20153D958)
- ML20153D960 + (ML20153D960)
- ML20153D963 + (ML20153D963)
- ML20153D966 + (ML20153D966)
- ML20153D968 + (ML20153D968)
- BVY-98-139, Informs That Post Accident Stack Ng Effluent Monitoring channel,R-17-155,is Scheduled to Be Replaced Starting 981001.Estimated That Instrument Channel Will Be Out of Svc for Approx 30 Days + (ML20153D970)
- ST-HL-AE-1608, Forwards marked-up FSAR Pages Providing Details on Final Design of Diesel Generator Exhaust.Approx 3 Inches of Pipe Will Extend Beyond Edge of Bldg.Exhaust Hood Designed to Break Away on Impact Will Be Installed Above Exhaust Piping + (ML20153D971)
- IR 05000298/1998020 + (ML20153D973)
- ML20153D974 + (ML20153D974)
- ML20153D975 + (ML20153D975)
- ML20153D977 + (ML20153D977)
- ML20153D981 + (ML20153D981)
- ML20153D982 + (ML20153D982)
- ML20153D983 + (ML20153D983)
- ML20153D984 + (ML20153D984)
- ML20153D990 + (ML20153D990)
- ML20153D992 + (ML20153D992)
- IR 05000354/1988008 + (ML20153D993)
- TXX-4698, Informs That Water Treatment for Nonradwaste Sys Modified, Subsequent to Sept 1981 Fes.Revised Listing of Amounts & Types of Nonradioactive Chemicals Used During Operation Encl + (ML20153D998)
- ML20153D999 + (ML20153D999)
- ML20153E003 + (ML20153E003)
- ML20153E004 + (ML20153E004)
- ML20153E009 + (ML20153E009)
- ML20153E010 + (ML20153E010)
- ML20153E013 + (ML20153E013)
- L-88-206, Forwards Response to Violations Noted in Insp Repts 50-335/88-02 & 50-389/88-02.Encl Withheld (Ref 10CFR2.790 & 73.21) + (ML20153E014)
- ML20153E017 + (ML20153E017)
- PNO-V-88-030, on 880504,reactor Tripped & Leak Discoverd on Letdown Cooler a Relief Valve.Util Conducting post-trip Review to Determine Cause of Trip & Confirm Source of Leak + (ML20153E020)
- ML20153E022 + (ML20153E022)
- ML20153E024 + (ML20153E024)
- ML20153E027 + (ML20153E027)
- ML20153E031 + (ML20153E031)
- ML20153E033 + (ML20153E033)
- ML20153E035 + (ML20153E035)