Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151W525 + (ML20151W525)
- ML20151W526 + (ML20151W526)
- 05000333/LER-1998-010, :on 980813,primary Containment Electrical Penetration Was Noted Inoperable Under Postulated Conditions.Caused by Inadequate Plant Design.Added Second Primary Overcurrent Protective Device.With + (ML20151W527)
- ML20151W529 + (ML20151W529)
- PNO-IV-88-032, on 880423,control Element Assembly (CEA) Inadvertently Withdrawn W/Upper Guide Structure During Refueling Outage.Cause Still Under Investigation.Replacement of CEA Gripper & Extension Under Consideration + (ML20151W532)
- CY-98-150, NPDES Noncompliance Notification Addendum:On 980202,0413 & 0611,sixty Day Oil Spill Repts Re Sheens Observed at Water Intake Structure.Caused by Petroleum Products Trapped in River Sediments.Will Continue to Use Sorbent Booms + (ML20151W534)
- PY-CEI-NRR-0845, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-25.Corrective Actions:Preventive Maint Deferral Evaluation/Justification Sheet Will Be Formally Incorporated Into Procedures IAP-0501 & PAP-0906 by 880630 + (ML20151W535)
- ML20151W537 + (ML20151W537)
- VPN-041-98, Forwards Rev 22 to PGE-8010, Poge Nuclear QA Program for Trojan Nuclear Plant. Rev Reflects Administrative Changes That Continue to Meet Requirements of 10CFR50,App B + (ML20151W538)
- ML20151W539 + (ML20151W539)
- B12987, Proposed Tech Specs,Adding Alternate Means of Analyzing Containment Integrated Leakage Rate Test Results + (ML20151W541)
- ML20151W543 + (ML20151W543)
- ML20151W545 + (ML20151W545)
- ML20151W547 + (ML20151W547)
- ML20151W548 + (ML20151W548)
- ML20151W549 + (ML20151W549)
- ML20151W551 + (ML20151W551)
- ML20151W553 + (ML20151W553)
- ML20151W554 + (ML20151W554)
- ML20151W555 + (ML20151W555)
- 05000341/LER-1988-025, :on 880719,breaker Tripped & Reactor Protection Sys Trip Sys B de-energized.Caused by Personnel Mishap.Event Will Be Included in Maint News Ltr & in Instrumentation & Controls Training Program + (ML20151W557)
- ML20151W558 + (ML20151W558)
- ML20151W561 + (ML20151W561)
- ML20151W562 + (ML20151W562)
- ML20151W563 + (ML20151W563)
- ML20151W567 + (ML20151W567)
- ML20151W568 + (ML20151W568)
- ML20151W570 + (ML20151W570)
- ML20151W571 + (ML20151W571)
- ML20151W572 + (ML20151W572)
- ML20151W573 + (ML20151W573)
- U-603017, Forwards Rev 25 of Physical Security Plan, IAW 10CFR50.54(p).Rev Does Not Reduce Effectiveness of Plan. Rev Withheld + (ML20151W576)
- ML20151W577 + (ML20151W577)
- ML20151W578 + (ML20151W578)
- ML20151W579 + (ML20151W579)
- ML20151W580 + (ML20151W580)
- ML20151W581 + (ML20151W581)
- ML20151W584 + (ML20151W584)
- ML20151W586 + (ML20151W586)
- ML20151W587 + (ML20151W587)
- ML20151W590 + (ML20151W590)
- ML20151W591 + (ML20151W591)
- ML20151W592 + (ML20151W592)
- ML20151W594 + (ML20151W594)
- ML20151W595 + (ML20151W595)
- ML20151W597 + (ML20151W597)
- ML20151W598 + (ML20151W598)
- PNO-V-88-029, on 880429,SMUD Released Info Re Potential Agreement W/Duke Power Co (DPC) Under Which DPC Employee Would Become Chief Executive Officer,Nuclear,Reporting to New Rancho Seco Mgt Committee.Meeting Planned on 880509 + (ML20151W599)
- TXX-4696, Responds to Comanche Peak Task Force Rept of Review & Evaluation of Allegations of Intimidation & Harassment of Employees at Facility,Per 851104 Request + (ML20151W600)
- ML20151W601 + (ML20151W601)
- ML20151W603 + (ML20151W603)